| Location: | Georgia |
|---|---|
| Posted: | Mar 20, 2026 |
| Due: | Apr 28, 2026 |
| Agency: | State Government of Georgia |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PE-66895-NONST-2026-000000045 |
| Publication URL: | To access bid details, please log in. |
| Event ID | Event Title | Government Entity | Start Date (ET) | End Date (ET) |
| PE-66895-NONST-2026-000000045 | Dr. Bramblett Road & Goldmine Road Water Main Extensions | Cumming, City Of |
Mar 20, 2026 @ 09:05 AM
|
Apr 28, 2026 @ 02:00 PM
|
Start Date: Mar 20, 2026 @ 09:05 AM ET
End Date:
Apr 28, 2026 @ 02:00 PM ET
Bids for the construction of the Project will be received by the City of Cumming, Utilities Department at City Hall, 100 Main Street, 4th Floor, Suite 401, Cumming, GA 30040, until April 28, 2026 at 2:00 pm local time. At 2:05 pm, the Bids received will be announced in the 4th Floor Conference Room. Any bid received after 2:00 pm will be returned unopened.Work of this Project generally includes the design and construction of new potable water mains along Dr. Bramblett Road and Goldmine Drive to improve water system performance, fire flow, and distribution capacity. Work includes, but is not limited to, the following:
1. Dr. Bramblett Road Water Main Extension
a. Install approximately 2,300¿2,400 feet of new 16¿inch water main along Dr. Bramblett Road, extending the existing SR¿20 Phase II water main to the Spot Road / Spot Road Connector intersection.
b. Connect to the City¿s existing distribution system in coordination with hydraulic modeling and City records.
c. Improve working pressure and volume at the Spot Road connection.
d. Coordinate tie¿ins and construction sequencing with C.W. Matthews if the City elects to incorporate the work into the existing SR¿20 Phase II construction contract.
2. Goldmine Drive Water Line Replacement
a. Replace approximately 1,600 linear feet of existing 3¿inch water line with new 8¿inch water main from Sawnee Drive (SR 306) to the previously installed 8¿inch stub on Goldmine Drive.
b. Abandon the existing 3¿inch main.
c. Connect to the new 12¿inch water main at Sawnee Drive (constructed under the SR 20 project).
d. Restore water services and coordinate any customer service changes with the Owner.
3. General Work Elements Applying to Both Corridors
a. Perform all land¿disturbing activities required for installation of new mains, including trenching, bedding, backfill, erosion and sediment control, and final site restoration.
b. Provide and maintain ES&PCP.
c. Locate existing utilities through survey and utility coordination; prot
| Code | Description |
| 91360 | Construction, Water System, Plants, Main and Service Line |
| 91356 | Construction, Utility and Underground Projects |
| 91340 | Construction, Pipeline, Including Aerial Crossings |
Josh Evans
jlevans@garverusa.com
770-789-7913

With GovernmentContracts, you can:
...Engineering 91889 Real Estate and Land Consulting, Including Land Survey Consulting and Land ...
State Government of Georgia
Bid Due: 6/24/2026
...Markers, Survey and Right-Of-Way 92586 Surveyor Services, Land BuyerContact: Ericka Kelly efrazier@sandyspringsga.gov 770-730-5600...
State Government of Georgia
Bid Due: 6/18/2026
..., topographic, and ALTA/NSPS land title surveys on City-owned parcels. b. Provide plats, ...
City of Newnan
Bid Due: 9/30/2031
...Real Estate and Land Consulting, Including Land Survey Consulting and Land Developers 90740 ...
State Government of Georgia
Bid Due: 6/26/2026