SGL#081 Renovations to Existing Storage Building
Contract No. PGC-081-25-01
PENNSYLVANIA GAME COMMISSION
STATE GAME LANDS #081
RENOVATIONS TO EXISTING STORAGE BUILDING
Dublin Township, Huntingdon County
Table of Contents
Bid Notice
Terms and Conditions
Specifications
PA Prevailing Wages
Reciprocal Limitations Act
Workers Protection & Investment Cert
Russia and Belarus Act-57 2023
Public Works Employment Verification Form
Technical Specifications
Project Drawings
(Provided Separately with Solicitation)
(Provided Separately with Solicitation)
4 Pages
6 Pages (Determination No. 26-02486)
4 Pages
1 Page
3 Pages
1 Page
31 Pages
5 Drawings
SGL#081 Renovations to Existing Storage Building
Contract No. PGC-081-25-01
PROJECT SPECIFICATIONS
The Contractor shall comply with the Contract Terms and Conditions provided with the Bid
Documents including but not limited to the following:
INSURANCE REQUIREMENTS – In accordance with the Contract Terms and Conditions,
the Contractor is required to have in place during the term of the Contract and any renewals or
extensions thereof, the following types of insurance, issued by companies acceptable to the
Commonwealth and authorized to conduct such business under the laws of the Commonwealth
of Pennsylvania:
A. Worker's Compensation Insurance for all of the Contractor's employees and
those of any subcontractor, engaged in Work at the site of the project as required
by law.
B. Public Liability and Property Damage Insurance to protect the
Commonwealth, the Contractor, and any and all subcontractors from claims for
damages for personal injury (including bodily injury), sickness or disease,
accidental death and damage to property including the loss of use resulting from
any property damage, which may arise from the activities performed under the
Contract or the failure to perform under the Contract, whether such performance
or non-performance be by the Contractor, by any subcontractor, or by anyone
directly or indirectly employed by either. The minimum amounts of coverage
shall be $250,000 per person and $1,000,000 per occurrence for bodily injury,
including death, and $250,000 per person and $1,000,000 per occurrence for
property damage. Such policies shall be occurrence rather than claims-made
policies and shall not contain any endorsements or any other form designated to
limit and restrict any action by the Commonwealth, as an additional insured,
against the insurance coverage in regard to Work performed for the
Commonwealth.
Prior to commencement of the Work under the Contract and at each insurance renewal date
during the term of the Contract, the Contractor shall provide the Commonwealth with current
certificates of insurance. These certificates or policies shall name the Commonwealth AND
Pennsylvania Game Commission as additional insured and shall contain a provision that
the coverage's afforded under the policies will not be cancelled or changed until at least
thirty (30) days written notice has been given to the Commonwealth.
COMPLIANCE WITH LAW – The Contractor shall comply with all applicable federal and
state laws and regulations and local ordinances in the performance of the Contract.
WORKMANSHIP - All Work shall be performed in a Workmanlike manner and all materials
and labor shall be in strict and entire conformity with the Drawings and Specifications.
INSPECTION AND CHANGES - All Work is subject to inspection and acceptance by the
Pennsylvania Game Commission. Any Work rejected as defective or unsuitable shall be
Page 1 of 4
SGL#081 Renovations to Existing Storage Building
Contract No. PGC-081-25-01
removed and replaced with suitable Work and materials at the sole cost of the Contractor to the
complete satisfaction of the Game Commission.
Changes shall be in accordance with the Contract Terms and Conditions.
TEMPORARY SERVICES AND JOB CONDITIONS - The Contractor shall be responsible
for providing any and all temporary facilities necessary to execute and protect the Work. The
Contractor shall accept all conditions as found upon examination of the site and shall coordinate,
plan, and execute the Work accordingly. The Contractor shall cooperate in the arrangements of
the Work as necessary to least affect the administration or operations of existing buildings,
facilities, and infrastructure. The Contractor shall keep the Work site clean at all times.
PREVAILING WAGE – Prevailing minimum wages apply to this project. See Contract Terms
and Conditions and attached Prevailing Wage Determination.
The Contractor and each Subcontractor shall file a statement each week and a final statement at
the conclusion of the Work on the contract with the contracting agency, under oath, and in form
satisfactory to the Secretary, certifying that workmen have been paid wages in strict conformity
with the provisions of the contract as prescribed by this section or if wages remain unpaid to set
forth the amount of wages due and owing to each workman respectively. The PA Labor and
Industry “Weekly Payroll Certification for Public Works Projects” form shall be used. The
initial and final Payroll Certifications shall be notarized.
PAYMENT TERMS - A schedule of values is provided with the bid. Payment will be made on
a monthly basis upon satisfactory completion of items listed on the Schedule of Values and in
accordance with the Contract Terms and Conditions.
All payments due to the Contractor shall be processed after all Work has been inspected and
approved by an agent of the Pennsylvania Game Commission. Payment will not be made for
Work that is not progressing satisfactorily or for unsuitable or defective Work.
Payments may be withheld for failure to provide required documentation for the project
including but not limited to required submittals / shop drawings and weekly submission of
Certified Payrolls.
INVOICING – All Project invoices shall be submitted directly to:
Matthew Spotts, Architectural Designer
Pennsylvania Game Commission
2001 Elmerton Ave
Harrisburg PA 17110
Office: 717-787-4250 Ext 73614
Email: matspotts@pa.gov
Page 2 of 4
SGL#081 Renovations to Existing Storage Building
Contract No. PGC-081-25-01
All invoices must be submitted in black and white with no color and shaded areas. Invoices must
include the Purchase Order Number, Contractor’s SAP Vendor Number, and the Contractor’s
name and address as listed on the Purchase Order. Payment items on invoices shall match the
items on the Purchase Order. Failure to submit invoices that meet these requirements will result
in a delay of payment.
Please Note: Vendors are reminded to NOT include employer identification numbers, Social Security
Numbers, bank account information, or other personally identifiable information on their invoices. That
information is uniquely tied to your SAP Vendor Number and, for security purposes, should not be
explicitly stated on an invoice.
EXCISE TAXES, PENNSYLVANIA SALES TAX - The Commonwealth is exempt from all
Excise Taxes. See Contract Terms and Conditions.
OFFSET PROVISION - The Contractor agrees that the Commonwealth may set off the amount
of any state liability or other debt of the Contractor or its subsidiaries that is owed to the
Commonwealth and not being contested on appeal against any payments due the Contractor
under this or any other contract with the Commonwealth.
PERFORMANCE SECURITY / CONTRACT BONDS – Within 10 days after award of the
purchase order, the Bidder to whom the Contract is awarded, shall provide Contract
Performance Security and a Payment Bond in a form acceptable to the Commonwealth for the
amounts listed below and in accordance with the Contract Terms and Conditions.
A Performance Bond at one hundred percent (100%) of the contract amount, conditioned upon
the faithful performance of the contract in accordance with the plans, specifications and
conditions of the contract.
A Payment Bond in an amount equal to one hundred percent (100%) of the contract amount.
Performance and Payment Bonds shall be executed by a surety company authorized to do
business in the Commonwealth and listed on the current U.S. Dept. of Treasury, Bureau of Fiscal
Service, Department Circular 570 (https://fiscal.treasury.gov/surety-bonds/list-certified-
companies.html). Bonds shall include a current Power of Attorney dated the same as the date of
the bond. Bonds shall be made payable to the Commonwealth.
GUARANTY / WARRANTY – See Contract Terms and Conditions – all items are warranted
for a period of one year following delivery by the Contractor and acceptance by the
Commonwealth.
HOLD HARMLESS PROVISION - See Contract Terms and Conditions - The Contractor
shall hold the Commonwealth harmless from and indemnify the Commonwealth against any and
all third party claims, demands and actions based upon or arising out of any activities performed
by the Contractor and its employees and agents under this Contract, provided the Commonwealth
gives Contractor prompt notice of any such claim of which it learns.
Page 3 of 4
SGL#081 Renovations to Existing Storage Building
Contract No. PGC-081-25-01
CONTRACT TERM - The Contract shall commence upon delivery of Purchase Order to
Contractor and shall terminate on June 30, 2026. Contract time is of the essence of the Project.
All Work must be completed and accepted by this date.
EXCISE TAXES, PENNSYLVANIA SALES TAX - The Commonwealth is exempt from all
Excise Taxes. See Contract Terms and Conditions.
ADDITIONAL PROVISIONS -
Contractor shall comply with the conditions listed below in accordance with the Contract Terms
and Conditions:
1. Steel Products Procurement Act
2. Prohibition Against the Use of Certain Steel and Aluminum Products (Trade
Practices Act)
3. Reciprocal Limitations Act - The form GSPUR89 (Reciprocal Limitations Act
Requirements) is attached. The Contractor shall complete the applicable portions of
pages 3 and 4 of the form and submit the completed pages within two days after the
bid opening.
4. Restrictions for Associations with Russia and Belarus Act 57 of 2023 – PA
General Assembly.
5. Worker Protection and Investment Certification Form - The form is attached.
The Contractor shall complete the certification on the bottom of the form and submit
it within two days after the bid opening.
6. Public Works Employment Verification Form - The form is attached. The
Contractor shall complete the form and submit it within two days after the bid
opening.
Page 4 of 4
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.