| Location: | Georgia |
|---|---|
| Posted: | Aug 7, 2025 |
| Due: | Sep 15, 2025 |
| Agency: | State Government of Georgia |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PE-77074-NONST-2025-000000026 |
| Publication URL: | To access bid details, please log in. |
| Event ID | Event Title | Government Entity | Start Date (ET) | End Date (ET) |
| PE-77074-NONST-2025-000000026 | COBBTOWN & COLLINS DRAINAGE IMP. & SIDEWALK REPLACEMENTS | Tattnall County Board Of Commissioners |
Aug 07, 2025 @ 10:18 AM
|
Sep 15, 2025 @ 10:00 AM
|
Start Date: Aug 07, 2025 @ 10:18 AM ET
End Date:
Sep 15, 2025 @ 10:00 AM ET
Bids are requested for the V-Gutter and Sidewalk replacement of 0.18 miles of Main St. in Cobbtown and Sidewalk replacement and addition of pipes for 0.17 miles of SR292 in Collins.
Cobbtown ¿ Construction will consist of 6¿ X 3¿ V-Gutter, 4¿/6¿ x 5¿ Sidewalk, and Driveway reconstruction. See details on the attached drawings. Grading Complete will include the removal of existing driveway pavement, removal of existing sidewalks, removal of existing pipes, and backfill of existing ditches. All utilities are to be located prior to beginning construction.
Collins ¿ Construction will consist of 4¿ x 5¿ Sidewalk and drainage system to replace the existing ditch. See details on the attached drawings. Grading Complete will include any needed excavation or fill needed to add pipes and cover existing ditch. It will also include removal of existing sidewalk. Entire area is to be grassed. Silt fence to be placed around each ditch inlet and at the beginning and end of project at drainage inlets and area next to outfall ditch. All utilities are to be located prior to beginning construction.
All work is to be completed by May 31, 2026.
***SEE ATTACHED BID REQUEST PACKAGE
| Code | Description |
| 91382 | Maintenance and Repair, Sidewalk and Driveway, Including Removal |
| 91345 | Construction, Sewer and Storm Drain |
| 91347 | Construction, Sidewalk and Driveway, Including Pedestrian and Handicap Ramps |
| 91319 | Construction, Curb and Gutter, Including Maintenance, Repair, and Removal Services |
Dennis Odom
engineer@tattnallcountyga.gov
912 557 4335

With GovernmentContracts, you can:
...SB026-26 Cedars Rd to Sugarloaf Pkwy Construction DOT Project 13895 Lawrenceville, City Of ...
State Government of Georgia
Bid Due: 6/11/2026
...Bid Number: SB026-26 Bid Title: Cedars Rd to Sugarloaf Pkwy Construction - DOT ...
City of Lawrenceville
Bid Due: 6/11/2026
...Type: county Fiscal Year: 2026 Agency Site: Link Description The construction of the ...
State Government of Georgia
Bid Due: 6/11/2026