| Location: | Indiana |
|---|---|
| Posted: | Apr 14, 2026 |
| Due: | Apr 30, 2026 |
| Agency: | City of Fort Wayne |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 10116233 |
| Publication URL: | To access bid details, please log in. |
| City: | Fort Wayne | |
| County: | Allen | |
| State/Province: | IN |
| Project Category Code: | Street/Road Concrete Repair | |
| Description: | West Cook Road from Huguenard to 800 feet west of Lima Road, enhancing pedestrian safety by adding a signalized pedestrian crossing with ADA-compliant ramps and new connecting 5' wide sidewalk segments (1,200 feet) on the south side of Cook Road. Additionally, the project will improve vehicle traffic by replacing deteriorated concrete pavement, milling the existing surface, and applying a watertight road fabric beneath 3.5 inches of Hot Mix Asphalt (HMA) in multiple lifts. Updated traffic striping will further optimize traffic flow and safety. |
| Owner Name: | Public Works | |
| Phone: | 260-427-5757 | |
| Contact: | Tim Byer - Project Manager | |
| Email: |
timothy.byer@cityoffortwayne.org |
| Solicitor Name: | Fort Wayne IN, City of | |
| Design Discipline: | Soliciting agent | |
| Address: |
200 East Berry Street,
Suite 210, Fort Wayne, IN - 46802 |
|
| Phone: | 260-427-6987 | |
| Contact: | Michelle Nelson | |
| Email: |
michelle.nelson@cityoffortwayne.org |

With GovernmentContracts, you can:
...Follow Grissom ARB Pavement Repair, Sustainment, and construction. Active Contract Opportunity...) for the ...
DEPT OF DEFENSE
Bid Due: 6/30/2026
...existing airfield pavement and realign the vehicle access road at Fort Wayne International ...
Fort Wayne Airport Authority
Bid Due: 6/30/2026