Passenger, Windscreen and Bike Storage Shelter Installation

Location: Michigan
Posted: Apr 14, 2026
Due: May 5, 2026
Agency: City of Kalamazoo
Type of Government: State & Local
Category:
  • 54 - Prefabricated Structures and Scaffolding
Publication URL: To access bid details, please log in.
Passenger, Windscreen and Bike Storage Shelter Installation

Closing date

May 05, 2026, 03:30 PM

  • Reference number 90900-028.0
  • Status Open
  • Summary The Central County Transportation Authority has purchased 3 prefabricated Bus shelters, 3 windscreens and 1 bike storage shelter with bike racks. The Contractor shall install the bus shelters, windscreens and bike shelter AT ROOD HALL WMU CAMPUS in accordance with all project documents. These include, but are not limited to, the following:

90900-028.0-bid document (PDF, 2MB)

90900-028.0-Attachment A Windwall Assembly (PDF, 715KB)

90900-028.0-Attachment B Standard Parachute Instructions (PDF, 314KB)

SCOPE OF WORK

The Central County Transportation Authority has purchased 3 prefabricated Bus shelters, 3 windscreens and 1 bike storage shelter with bike racks. The Contractor shall install the bus shelters, windscreens and bike shelter AT ROOD HALL WMU CAMPUS in accordance with all project documents. These include, but are not limited to, the following:

These Specifications

• Attachment A - Windwall Assembly

• Attachment B - Standard Parachute Instructions

TIMELINE

The project must be completed by: 30 days after award . If you cannot meet this deadline, please fill out the “Statement of No Bid” form included in this packet, stating this as the reason.

Attachment Preview

TOOLLIST: (cid:120) hammerdrillwith 34"(cid:1486)bitfor 5(cid:5)(cid:3)(cid:145)(cid:3)(cid:87)(cid:75)(cid:85)(cid:72)(cid:68)(cid:71)(cid:72)(cid:71)(cid:3)(cid:85)(cid:82)(cid:71)(cid:11)(cid:86)(cid:12) 8mmPCSSPANEL 8 (cid:120) drilldriverwith11( 316")drillbit (cid:120) driverforphillipstekscrews EG-8EDGESASH RIVET (cid:120) hexsocketsetwithextension(for 1 ",5 "and 3(cid:5)(cid:3)(cid:145)(cid:3)(cid:69)(cid:82)(cid:79)(cid:87)(cid:86)(cid:12) 2 8 4 (cid:120) hexallenwrenchset PURLINTUBE (cid:120) heavy-dutypoprivettool(for 3(cid:5)(cid:3)(cid:145)(cid:3)(cid:86)(cid:87)(cid:68)(cid:76)(cid:81)(cid:79)(cid:72)(cid:86)(cid:86)(cid:3)(cid:86)(cid:87)(cid:72)(cid:72)(cid:79)(cid:3)(cid:83)(cid:82)(cid:83)(cid:3)(cid:85)(cid:76)(cid:89)(cid:72)(cid:87)(cid:86)(cid:12) 16 (cid:120) gasketrollingtool 3. Slideoneof(2)trimmed8mmpanelsintoeaveEG-8sashpieces,tucking (cid:120) standardtoolsetincluding,butnotlimitedto:hammer,tapemeasure,level, intotheendsash.Securepanellegusing(1)panelclipand(2)panhead pencil,utilityknife,chalkline,etc. tekscrewsateachstructuralmember,exceptfortheouter(eave)members. 3.1. Alternatemethods:attachingoneeavepieceofEG-8,ornone,untilall FRAMEASSEMBLY: panelsareclippedinplace,thenslidingeavesashoverallpanelends 1. Assemblemainstanchions:boltcurvedraftertubeto"columns"with 3 4 " andpullingdown.Ifpanelhasahardtimefittingintothesash(it's serratedhexboltsthroughtopaccessholesinrafter.Capaccessholeswith supposedtobetight!),youcanuseahand-seamerorformicarolleror plasticplug(s)providedwhencomplete. similartooltogently"crush"thelast 1"orsoofthepanel. 2. Positionassembledmainstanchionsinapproximatefinallocations.Drawing 4 CLIP andboltholeplacementsinpurlinbeamswilldeterminespacing. 3. Withstanchionssquaredtoeachotherandatthecorrectspacing,install oneanchorbolt(or2)ineachmainstanchion,notfullytightened,forsafety whileremainingpurlinsarebeingattached. 4. Attachpurlinbeamstothetopofeachrafterwith 1 2 "serrated-flangehex 4. Slidenexta"full"8mmpanelintotheeaveEG-8sashandpushagainstclips bolts,throughtopaccessholes.Donottightencompletelyuntilentireframe justinstalled.Securefreelegwithanothersetofclips,asinstep3.Panel isinfinallocation,squareandplumb.Purlinspliceplates (wherenecessary) clipsshouldmaintaina23 3"o.c.spacing. aresecured 1 "-13x 3"buttonheadboltsandlockwashers. 4 2 4 5. Oncelastfactorytrimmedpanelisinplace,slideremainingEG-8sashover 5. Withframesquareandplumb,installandtightenremaininganchors.Shim trimmedpanel,securingwith 316"closed-endpoprivets,sameasstarting asnecessary.Tightenallpurlinbolts. end.Ifanyadditionaltrimmingneedstobedone,useautilityknifeandcut (cid:20)(cid:18)(cid:21)(cid:5)(cid:145)(cid:3)(cid:54)(cid:18)(cid:54)(cid:3)(cid:37)(cid:50)(cid:47)(cid:55)(cid:3)(cid:55)(cid:43)(cid:53)(cid:50)(cid:56)(cid:42)(cid:43)(cid:3)(cid:3)(cid:36)(cid:38)(cid:38)(cid:40)(cid:54)(cid:54)(cid:3)(cid:43)(cid:50)(cid:47)(cid:40) throughonethicknessatatime. INTOPOFPURLIN,INTOTHREADED HOLE,TYP. 6. Installthe"drop-in"gasketalongthetopperimeteroftheEG-8sash,as shown.Note:dependingontemperature,etc.,itmaybeverydifficultto ACCESSHOLE installthedrop-ingasket.Ifunabletodoso,applyasmallbeadofclear PURLINTUBE sealantalongthatjointinplaceofgasket. RAFTERTUBE 7. Snapbattensontopanels.Snapendcapintobattens.Caulkanyopen ROOFGLAZING: seamsincapsandaroundbattenends. SEALANT 1. Note:Itisintendedthattheroofpanelsstartinthemiddle,notatanend (thiswillensuresymmetry).Refertoyourexactmodeltodeterminewhether BATTEN BATTENCAP apaneliscenteredontheshelterorthejointbetweentwopanelsis centeredontheshelter.Stepsbelowwillstartatoneend: EPDMDROP-INGASKET 2. Attach1endandbotheavepiecesoftheEG-8aluminumedgesashtothe steelframeasshown,using 316"closed-endpoprivets,oneateachpurlin ontheendandapprox.12"oncenteralongtheeaves(2ateachmiterjoint). EndEG-8piecesarefieldcurved.
Duo-GardIndustries,Inc. Tel(734)207-9700Fax(734)207-7995 www.duo-gard.com THISDRAWINGISPROPRIETARYANDFORTHESOLEUSEOFOUR CUSTOMERANDMAYNOTBECOPIEDORREPRODUCEDWITHOUT PRIORWRITTENCONSENTFROMDUO-GARDINDUSTRIES,INC. LEADTIMEBEGINSUPONRECEIPTOFSIGNEDSHOPDRAWINGS APPROVALSIGNATUREDATE X_______________________________________ _______________ PROJECTNAME CUSTOMERSAMPLE
DESCRIPTION 9'AND12'PARACHUTEMODELBICYCLESHELTER-INSTALLATIONINSTRUCTIONS
PRJTENG BDI PRJTMGR --- DRW`GDATE 6-20-11 REV1 R 2-21-12 3 EV2 SCALE PAGE -8-19 NTS 1 OF 1 DRWNG PARAINS

TOOLLIST:
(cid:120) hammerdrillwith 34"(cid:1486)bitfor 5(cid:5)(cid:3)(cid:145)(cid:3)(cid:87)(cid:75)(cid:85)(cid:72)(cid:68)(cid:71)(cid:72)(cid:71)(cid:3)(cid:85)(cid:82)(cid:71)(cid:11)(cid:86)(cid:12) 8mmPCSSPANEL
8
(cid:120) drilldriverwith11( 316")drillbit
(cid:120) driverforphillipstekscrews EG-8EDGESASH
RIVET
(cid:120) hexsocketsetwithextension(for 1 ",5 "and 3(cid:5)(cid:3)(cid:145)(cid:3)(cid:69)(cid:82)(cid:79)(cid:87)(cid:86)(cid:12)
2 8 4
(cid:120) hexallenwrenchset
PURLINTUBE
(cid:120) heavy-dutypoprivettool(for 3(cid:5)(cid:3)(cid:145)(cid:3)(cid:86)(cid:87)(cid:68)(cid:76)(cid:81)(cid:79)(cid:72)(cid:86)(cid:86)(cid:3)(cid:86)(cid:87)(cid:72)(cid:72)(cid:79)(cid:3)(cid:83)(cid:82)(cid:83)(cid:3)(cid:85)(cid:76)(cid:89)(cid:72)(cid:87)(cid:86)(cid:12)
16
(cid:120) gasketrollingtool
3. Slideoneof(2)trimmed8mmpanelsintoeaveEG-8sashpieces,tucking
(cid:120) standardtoolsetincluding,butnotlimitedto:hammer,tapemeasure,level,
intotheendsash.Securepanellegusing(1)panelclipand(2)panhead
pencil,utilityknife,chalkline,etc.
tekscrewsateachstructuralmember,exceptfortheouter(eave)members.
3.1. Alternatemethods:attachingoneeavepieceofEG-8,ornone,untilall
FRAMEASSEMBLY:
panelsareclippedinplace,thenslidingeavesashoverallpanelends
1. Assemblemainstanchions:boltcurvedraftertubeto"columns"with 3 4 " andpullingdown.Ifpanelhasahardtimefittingintothesash(it's
serratedhexboltsthroughtopaccessholesinrafter.Capaccessholeswith supposedtobetight!),youcanuseahand-seamerorformicarolleror
plasticplug(s)providedwhencomplete. similartooltogently"crush"thelast 1"orsoofthepanel.
2. Positionassembledmainstanchionsinapproximatefinallocations.Drawing 4
CLIP
andboltholeplacementsinpurlinbeamswilldeterminespacing.
3. Withstanchionssquaredtoeachotherandatthecorrectspacing,install
oneanchorbolt(or2)ineachmainstanchion,notfullytightened,forsafety
whileremainingpurlinsarebeingattached.
4. Attachpurlinbeamstothetopofeachrafterwith 1 2 "serrated-flangehex 4. Slidenexta"full"8mmpanelintotheeaveEG-8sashandpushagainstclips
bolts,throughtopaccessholes.Donottightencompletelyuntilentireframe
justinstalled.Securefreelegwithanothersetofclips,asinstep3.Panel
isinfinallocation,squareandplumb.Purlinspliceplates (wherenecessary)
clipsshouldmaintaina23 3"o.c.spacing.
aresecured 1 "-13x 3"buttonheadboltsandlockwashers. 4
2 4 5. Oncelastfactorytrimmedpanelisinplace,slideremainingEG-8sashover
5. Withframesquareandplumb,installandtightenremaininganchors.Shim
trimmedpanel,securingwith 316"closed-endpoprivets,sameasstarting
asnecessary.Tightenallpurlinbolts.
end.Ifanyadditionaltrimmingneedstobedone,useautilityknifeandcut
(cid:20)(cid:18)(cid:21)(cid:5)(cid:145)(cid:3)(cid:54)(cid:18)(cid:54)(cid:3)(cid:37)(cid:50)(cid:47)(cid:55)(cid:3)(cid:55)(cid:43)(cid:53)(cid:50)(cid:56)(cid:42)(cid:43)(cid:3)(cid:3)(cid:36)(cid:38)(cid:38)(cid:40)(cid:54)(cid:54)(cid:3)(cid:43)(cid:50)(cid:47)(cid:40) throughonethicknessatatime.
INTOPOFPURLIN,INTOTHREADED
HOLE,TYP. 6. Installthe"drop-in"gasketalongthetopperimeteroftheEG-8sash,as
shown.Note:dependingontemperature,etc.,itmaybeverydifficultto
ACCESSHOLE installthedrop-ingasket.Ifunabletodoso,applyasmallbeadofclear
PURLINTUBE sealantalongthatjointinplaceofgasket.
RAFTERTUBE 7. Snapbattensontopanels.Snapendcapintobattens.Caulkanyopen
ROOFGLAZING: seamsincapsandaroundbattenends. SEALANT
1. Note:Itisintendedthattheroofpanelsstartinthemiddle,notatanend
(thiswillensuresymmetry).Refertoyourexactmodeltodeterminewhether BATTEN
BATTENCAP
apaneliscenteredontheshelterorthejointbetweentwopanelsis
centeredontheshelter.Stepsbelowwillstartatoneend:
EPDMDROP-INGASKET
2. Attach1endandbotheavepiecesoftheEG-8aluminumedgesashtothe
steelframeasshown,using 316"closed-endpoprivets,oneateachpurlin
ontheendandapprox.12"oncenteralongtheeaves(2ateachmiterjoint).
EndEG-8piecesarefieldcurved.
THISDRAWINGISPROPRIETARYANDFORTHESOLEUSEOFOUR PROJECTNAME
CUSTOMERANDMAYNOTBECOPIEDORREPRODUCEDWITHOUT CUSTOMERSAMPLE
PRIORWRITTENCONSENTFROMDUO-GARDINDUSTRIES,INC.
LEADTIMEBEGINSUPONRECEIPTOFSIGNEDSHOPDRAWINGS DESCRIPTION 3
APPROVALSIGNATUREDATE 9'AND12'PARACHUTEMODELBICYCLESHELTER-INSTALLATIONINSTRUCTIONS
Duo-GardIndustries,Inc. PRJTENG PRJTMGR DRW`GDATE REV1 REV2 SCALE PAGE OF DRWNG
Tel(734)207-9700Fax(734)207-7995
www.duo-gard.com X_______________________________________ _______________ BDI --- 6-20-11 2-21-12 3-8-19 NTS 1 1 PARAINS
install:makesure23 "o.c.!

This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...General Description MDOT's Office of Passenger Transportation has instructed the Transit Department...

City of Greenville

Bid Due: 9/29/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.