| Location: | Michigan |
|---|---|
| Posted: | Feb 1, 2026 |
| Due: | Mar 2, 2026 |
| Agency: | City of Jackson |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: ENG 26-08 Monkey Run Interceptor Rehabilitation
Addenda: 0
Release Date: 1/30/2026
Due Date: 3/2/2026
This project is to rehabilitate approximately 4400 LF of 60-inch and 66-inch brick sanitary sewer by chemical grouting, cementitious grouting, masonry repointing, brick repair and root and debris removal. The brick sewer to be rehabilitated is located along the following route:
The brick sewer to be rehabilitated is part of a longer interceptor sewer known as the Monkey Run Sewer. The brick section was constructed in approximately 1907. In 2022, the sewer was cleaned, inspected by closed-circuit television and evaluated to determine current conditions and deficiencies. The sewer was found to be in fair condition with sections with infiltration leaking and compromised mortar joints. The purpose of the contract is to address those defects to extend the service life of the sewer. The Condition Assessment Report (prepared by Consultants, Ltd, dated 11-25-22) is attached for informational purposes.

With GovernmentContracts, you can:
...Sewer Lining Project RFP 26-52 Megan Seay Open PUBLIC IMPROVEMENT REQUEST FOR PROPOSAL ...
City of Ann Arbor
Bid Due: 12/02/2026
...Project: Rehabilitation of the 7-Mile Sewer System Ref. #: REQ-0011642 Type: RFB Status: ...
Great Lakes Water Authority
Bid Due: 1/15/2027
...Storm Sewer Cleaning and CCTV Investigation Map Set of work locations Storm Sewer ...
City of St. Clair Shores
Bid Due: 11/24/2026
...Sanitary Sewer Jetting RFP (Due December 8, 2026 at 10:00AM) The Charter Township ...
Township of Brighton
Bid Due: 12/08/2026