| Location: | Washington |
|---|---|
| Posted: | Apr 8, 2025 |
| Agency: | County of Clark |
| Type of Contract: | Awards |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The project consists of the demolition of an 800 square foot loafing shed built in 1948 and a 5,000 square foot steel pole barn built in 1950 and is referred to as the Schriber property.
Addendum 1 - Issued Friday, March 21, 2025
A meeting has been scheduled.

With GovernmentContracts, you can:
...galvanized steel piles for the Sucia Island Marine State Park Pumpout Station. 2. ...
State Government of Washington
Bid Due: 6/16/2026
...is seeking qualified firms to provide Fiber Reinforced Polymer and Steel BCT durable ...
King County
Bid Due: 6/16/2026
...to procure and install two galvanized steel piles for the Sucia Island Marine ...
Sammamish Plateau Water
Bid Due: 6/16/2026
...inspections, anode inspection, gauge vessel steel, anode renewals, 100% topside washdown, prepare and ...
State Government of Washington
Bid Due: 7/09/2026