Request for Qualifications (Architect-Engineer)
State of Ohio Standard Forms and Documents
Administration of Project: Ohio Facilities Construction Commission
Project Name
OFCC Architect/ Engineer Consultant List
FY27-28
Project Location Various
City / County Various / Various
Owner
Various
Delivery Method Various
No. of paper copies requested (stapled, not bound)
0
Response Deadline 12/12/25
5:00 PM local time
Project Number
SFC-270999
Project Manager
Various
Contracting Authority Various
Prevailing Wages Various
No. of electronic copies requested (PDF)
1
Submit the requested number of Statements of Qualifications (Form F110-330) directly to Consultants@ofcc.ohio.gov . See
Section H of this RFQ for additional submittal instructions.
Submit all questions regarding this RFQ in writing to Consultants@ofcc.ohio.gov with the project number included in the
subject line (no phone calls please). Questions will be answered and posted to the Opportunities page on the OFCC website
at http://ofcc.ohio.gov on a regular basis until one week before the response deadline. The name of the party submitting a
question will not be included on the Q&A document.
Project Overview
A. Project Description
The Ohio Facilities Construction Commission (OFCC) intends to pre-qualify firms to provide architecture, landscape
architecture, engineering, surveying, and energy services for small projects. This selection is used to determine a list of pre-
qualified firms that will be eligible for award of contracts for the period beginning July 1, 2026 and ending June 30, 2028. In
order for any firms on the FY25-26 list to be considered in the pre-qualification process for future projects, they must reapply
for this FY27-28 Consultant List.The current OFCC Consultant List expires on June 30, 2026.
Services are in support of OFCC administered projects, as well as to support state agency and higher education locally
administered projects. Consultants are generally utilized for small projects or specialized tasks.
Upon completion of the selection process, OFCC will seek Controlling Board approval for establishment of the Consultant
List for use on projects administered by OFCC, state agencies and institutions of higher education. Each Contracting
Authority will seek separate Controlling Board approval for release of funds. Total contract awards by all Contracting
Authorities to each pre-qualified firm is limited to the amount of $250,000 for the two-year period. OFCC reserves the right
to extend service for an additional two years. Upon exercise of the optional two-year extension, the initial expenditure limit
of Two Hundred Fifty Thousand Dollars ($250,000) shall renew and apply anew for the duration of the extension term.
The short-listing, solicitation, selection, negotiation, contracting, administration, management and payment of services of
consultants will be the responsibility of each Contracting Authority, while the centralized development and maintenance of
the Consultant List remains the responsibility of OFCC. Consultant selections will be in accordance with Section 153:1-1-
02 of the Ohio Administrative Code. Selection of consultants under $50,000 may be in accordance with either Section 153:1-
1-02 of the Ohio Administrative Code or Section 153.71(A) of the Ohio Revised Code.
While pre-qualified status means that a firm is eligible for award of contracts, OFCC does not guarantee that a firm will be
awarded any work or make a representation of the amount of work a firm may receive within the two-year period or the
optional two-year extension.
All projects utilizing the OFCC Consultant List services must be administered through the state’s web-based project
management system (OAKS CI).
B. Scope of Services
Work assignments may include: architecture, landscape architecture, engineering (any engineering discipline), surveying,
and energy related specialty consulting services including but not limited to facility evaluation and master planning
F110-02-2016-JAN
Publish Date: November 12, 2025
Page 1 of 4
Request for Qualifications (Architect / Engineer) continued________________________________
services; review or creation of a Program of Requirements; various studies; prototype building design; preparation of
bidding and construction documents; validation of existing site conditions; preparation of cost estimates; quality assurance
testing during construction; pre-design investigations; preparation of cost estimates; code-required special inspection and
testing; quality assurance testing during construction; soil testing and engineering; energy auditing services; energy
conservation design; lighting consulting; maintenance planning; manual and document preparation; assistance with
performance contract RFP development; and assistance with utility bill data entry, analysis, management, auditing and
reporting services.
Services will be provided in accordance with the OFCC standard form of Consultant Agreement. As a project is identified for
architectural, landscape architectural services, surveying or engineering, the Contracting Authority will notify a pre-qualified
firm or firms of the project and provide a scope of work. Only the firm selected for an assignment will be requested to provide
a fee proposal. The scope of work and schedule for a specific project will be described in an exhibit document attached to the
agreement.
The Contracting Authority responsible for the specific project will initiate contract negotiations directed toward:
(1) Ensuring that the firm and the agency have a mutual understanding of the essential requirements involved in
providing the required services;
(2) Determining that the firm will make available the necessary personnel, equipment, and facilities to perform the
services within the required time; and
(3) Agreeing upon fair and reasonable compensation, taking into account the estimated value, scope, complexity, and
nature of the services.
Upon failure to negotiate a contract with an identified pre-qualified firm, the Contracting Authority will inform the firm in
writing of the termination of negotiations and may enter into negotiations with another firm on the pre-qualified list.
C. Funding / Estimated Budget
Total Project Cost $ Varies
Construction Cost $ Varies
Estimated A/E Fee Varies % to Varies %
State Funding $ Varies
Other Funding $ Varies
NOTE: The A/E fee percentage for this project includes all professional design services, and consultant services necessary for proper
completion of the Basic Services for the successful completion of the project, including but not limited to: review and verification of the
Program of Requirements provided by the Owner, validation of existing site conditions (but not subsurface or hidden conditions), preparation
of cost estimates and design schedules for the project. Fees may be negotiated and allocated for Additional Services (e.g., extensive
evaluation or validation of site conditions, extensive pre-design investigations, code-required special inspection and testing, Quality Assurance
testing during the construction period, and testing due to unforeseen conditions).
D. Services Required (see note below)
E. Anticipated Schedule
Primary
Others
Architecture, Landscape Architecture,
Professional Services Start
Programming, Master Planning,
Construction Notice to Proceed
Engineering (all disciplines), Land Surveying, Substantial Completion of all Work
Hazardous Materials Design, Envelope Analysis
and Design,
LEED Documentation,
Professional Services Completed
Code Analysis, Studies,
Energy Conservation Design, Energy Auditing, F.
Lighting Design, Maintenance Planning, Utility
Bill Analysis
Historical Preservation
EDGE Participation Goal
Specialty for various assignments.
Percent of initial TOTAL A/E Fee
07/2026
Varies
Varies
Varies
0%
NOTE: The primary A/E shall be (1) a registered architect holding a license and certificate of authorization issued by the Ohio Architects Board
pursuant to ORC Chapter 4703, (2) a landscape architect holding a license and certificate of authorization issued by the Ohio Landscape
Architects Board pursuant to ORC Chapter 4703, or (3) a professional engineer or professional surveyor holding a license and certificate of
authorization issued by the Ohio Engineers and Surveyors Board pursuant to ORC Chapter 4733.
F110-02-2016-JAN
Publish Date: November 12, 2025
Page 2 of 4
Request for Qualifications (Architect / Engineer) continued________________________________
G. Evaluation Criteria for Selection
The following criteria for selection will be used for prospective firm evaluation:
• Demonstration on past projects of an ability to meet Owner's programmed project vision, scope, budget
• Relevant past performance
• Qualifications and experience of firm’s staff
• Specification writing and experience
• Resources and capacity to meet the needs of a typical project
• Access and capability to use internet from normal business location(s) during normal business hours
H. Submittal Instructions
Firms are required to submit a current F110-330 Statement of Qualifications (blank forms are available as a free download
from the OFCC website, https://ofcc.ohio.gov/Documents/Forms, under Procurement tab).
Electronic submittals should be combined into one PDF file named with the project number listed on the RFQ and your
firm’s name. Use the “print” feature of Adobe Acrobat or similar software for creating a PDF rather than using a scanner. If
possible, please reduce the file size of the PDF. In Acrobat, go to Advanced, then PDF Optimizer. Also, please insert the
project number and firm name followed by “SOQ” in the email subject line.
Statements of Qualifications must be submitted electronically by email. Submittals are limited to one email with a
maximum file size of 25 MB.
Facsimile or mailed copies of the Statement of Qualifications will not be accepted.
The following special instructions apply to completing the F110-330 form for this selection:
• Firms are requested to list the Project No. (indicated on Page 1 of this RFQ) on the first page of Part I and on
Part II of the F110-330.
• Firms are requested to indicate their EDGE-certified business status as either "Certified" or Non-certified" on Part
I Section C (Proposed Team).
• Firms performing current Consultant List projects should identify those projects on Page 1 of Section F (Example
Projects Which Best Illustrate Proposed Firm’s Qualifications for this Contract).
• Do not submit Page 2 of Section F (Relevant Projects Experience Matrix).
• Do not submit Page 3 of Section H (Commitment to Participate in the EDGE Business Assistance Program) and
Page 4 (Statement of Intent).
• Firms may submit multiple pages in length (if necessary) for Part II in order to list all relevant Disciplines and
Experience Codes.
• Overall submission is not to exceed 40 pages in length.
• Firms with historical preservation experience should specifically identify it within Part II, Block 10, Use Code #63.
• Firms are requested to identify professional registrations, memberships and credentials including but not limited
to: LEED GA, LEED AP, LEED AP+, CCCA, CCM, CCS, CDT, DBIA, and any other appropriate design and
construction industry credentials. Identify that information on the resume page for individual in Block 22, Section
E of the F110-330 form.
F110-02-2016-JAN
Publish Date: November 12, 2025
Page 3 of 4
Consultant Selection Rating
State of Ohio Standard Forms and Documents
Project Name OFCC Architect/ Engineer Consultant List
Project Location Various
Project Number SFC-270999
Proposer Firm
City, State, Zip
Selection Criteria
1. Firm Location and EDGE Status (Maximum 25 points)
Location of firm and EDGE-certified status
Out of State
Ohio Firm
EDGE Certified
2. Firm Size (Maximum 15 points)
Number of relevant licensed professionals within Small = Less than 3 licensed professionals
primary firm available to perform the work.
Medium = 3 to 5 licensed professionals
Large = More than 5 licensed professionals
3. Current Workload (Maximum 25 points)
Amount of fees awarded by the Contracting
Less than $100,000
Authority to the primary firm in the previous 24
$100,000 to $250,000
months (exclude projects on hold)
More than $250,000
4. Overall Project Team Experience (Maximum 35 points)
a. Experience with OFCC Consultant List
Projects in the previous 24 months
Less than 2 projects (Low)
2 to 3 projects (Average)
More than 3 projects (High)
b. Past Performance
Level of performance as indicated by past
evaluations / letters of reference
c. Knowledge of State of Ohio Capital
Project Administration Process
Less than 2 projects (Low)
2 to 3 projects (Average)
More than 3 projects (High)
* LEED = Leadership in Energy & Environmental Design developed by the U.S. Green Building Council
** See list of LEED credentials in Section H of the RFQ
Notes:
OFCC Evaluator:
Name
Value
0
10
25
15
5
0
25
15
5
10
5
0
0 - 15
10
5
0
Score
Subtotal
___________________________________
Signature
_____________
Date
F110-02-2016-JAN
Publish Date: November 12, 2025
Page 4 of 4
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.