RFP/PS/DOT/2604-1260172 PATH Lakewood Trail

Location: Georgia
Posted: Aug 17, 2026
Due: Sep 14, 2026
Agency: State Government of Georgia
Type of Government: State & Local
Category:
  • Z - Maintenance, Repair or Alteration of Real Property
Solicitation No: PE-66062-NONST-2027-000000467
Publication URL: To access bid details, please log in.
Event ID Event Title Government Entity Start Date (ET) End Date (ET)
PE-66062-NONST-2027-000000467 RFP/PS/DOT/2604-1260172 PATH Lakewood Trail Atlanta, City Of
Aug 17, 2026 @ 11:22 AM
Sep 14, 2026 @ 02:00 PM
RFP/PS/DOT/2604-1260172 PATH Lakewood Trail

Start Date: Aug 17, 2026 @ 11:22 AM ET

End Date:
Sep 14, 2026 @ 02:00 PM ET

Event ID: PE-66062-NONST-2027-000000467
Event Type: Non-State Agency
Event Status: Open
Purchase Type: Non-State Agency
Category Type: Construction / Public Works
Government Type: city
Fiscal Year: 2027
Agency Site: Link


Description


This project will construct a paved shared use path connecting the Southside Beltline Trail to the Southtowne Trail at South Bend Park. This paved shared use path will be delivered in two phases: phase one will extend from the Southside Trail to Pryor Road at Meldon Avenue, while phase two will extend from this point to the Southtowne Trail at South Bend Park.

NIGP Codes
Code Description
92536 Engineering Services (Not Otherwise Classified)
92513 Bridge Engineering
92517 Civil Engineering
92535 Environmental Engineering
91896 Transportation Consulting
91843 Environmental Consulting
BuyerContact:

Bonnie Davis
bdavis@atlantaga.gov

404-327-1625

Attachment Preview

Number Area Class
3.13 Bicycle and Pedestrian Facility Design
Number Area Class
1.06(a) NEPA Documentation
1.06(b) History
1.06(c) Air Studies
1.06(d) Noise Studies
1.06(e) Ecology, Class
1.06(f) Archaeology
1.06(h) Bat Surveys
1.07 Attitude, Opinion, and Community Value Studies
1.13 Non-motorized Transportation Planning
3.02 Two-Lane or Multi-Lane Urban Roadway Design
3.06 Traffic Operations Studies
3.07 Traffic Operations Design
3.08 Landscape Architecture
3.10 Utility Coordination
5.01 Land Surveying
5.02 Engineering Surveying

EXHIBIT I
Scope of Services
2.0 PI Number: 0021195
3.0 County: Fulton
4.0 Description: This project will construct a paved shared use path connecting the Southside
Beltline Trail to the Southtowne Trail at South Bend Park. This paved shared use path will be
delivered in two phases: phase one will extend from the Southside Trail to Pryor Road at Meldon
Avenue, while phase two will extend from this point to the Southtowne Trail at South Bend Park.
This project will be for Phase I (shown in Exhibit 1- B)
5.0 Required Area Classes:
Prime Consultants are defined as the firm submitting the Statement of Qualifications and the firm with
whom ATLDOT will contract. The Team is defined as the Prime Consultant and their sub-consultants,
who are considered team members. The Prime Consultant must be prequalified in the Area Classes
identified below in Section 4.A. The Prime Consultant or sub-consultant team members must be
prequalified in the Area Classes identified below in Section 5.B. Respondents should submit a summary
form (example provided in Exhibit IV) which details the required area classes for the Prime Consultant
and all sub-consultants or joint venture of consultants on the team listed in the Statement of
Qualifications. The area classes listed on the summary form must meet all required area classes, or
the team will be disqualified. The Prequalification Expiration Date must be current by the deadline stated
for this RFQ.
1. The Prime Consultant MUST be prequalified by GDOT in the area classes listed below:
Number Area Class
3.13 Bicycle and Pedestrian Facility Design
2. The Team (either the Prime Consultant and/or one or more of their sub-consultant team members)
MUST be prequalified by GDOT in the area classes listed below:
Number Area Class
1.06(a) NEPA Documentation
1.06(b) History
1.06(c) Air Studies
1.06(d) Noise Studies
1.06(e) Ecology, Class
1.06(f) Archaeology
1.06(h) Bat Surveys
1.07 Attitude, Opinion, and Community Value Studies
1.13 Non-motorized Transportation Planning
3.02 Two-Lane or Multi-Lane Urban Roadway Design
3.06 Traffic Operations Studies
3.07 Traffic Operations Design
3.08 Landscape Architecture
3.10 Utility Coordination
5.01 Land Surveying
5.02 Engineering Surveying

5.08 Overhead/Subsurface Utility engineering (SUE)
6.01(a) Soil Survey Studies
6.05 Hazardous Waste Site Assessment Studies
9.01 Erosion, Sedimentation, and Pollution Control Plan

5.08 Overhead/Subsurface Utility engineering (SUE)
6.01(a) Soil Survey Studies
6.05 Hazardous Waste Site Assessment Studies
9.01 Erosion, Sedimentation, and Pollution Control Plan
5.0 SCOPE OF SERVICES
Objective:
This project will construct a paved shared use path connecting the Southside Beltline Trail to the
Southtowne Trail at South Bend Park. This paved shared use path will be delivered in two
phases: phase one will extend from the Southside Trail to Pryor Road at Meldon Avenue, while
phase two will extend from this point to the Southtowne Trail at South Bend Park. This project will
be for Phase I (shown in Exhibit 1- B)
In partnership with the PATH Foundation, the City of Atlanta is seeking a qualified consultant to
perform any revisions to the approved concept report that may be necessary, prepare preliminary
and final plans and the NEPA document for phase one, including all revisions that may be
necessary to obtain final approval and permits. The scope of work includes all tasks necessary to
produce final design plans in accordance with GDOT's Plan Development Process, including all
necessary review, revision, and approval processes, including those tasks which may not be
explicitly called out in this contract.
This project will be delivered via a series of Task Orders throughout the Master Contract's
duration. The Consultant shall prepare concept, preliminary, and final design plans in general
conformance to GDOT's EDG and PPG. The final design plans should reflect project features
which first and foremost prioritize the safety of all roadway users, while remaining feasible to
construct in the stated timeline and in the defined project budget. The Consultant should make
every effort to design the project such that it would be eligible for a Categorical Exclusion (CE)
NEPA document.
Base phase: Preliminary Design and NEPA Documentation
A. Project Management
a. Create and maintain the project schedule in P6 or MS Project.
b. Review and finalize project scope.
c. Develop and maintain project risk register.
d. Submit monthly invoices and status reports.
e. Participate and prepare meeting minutes for kick-off meeting and subsequent project
management team (PMT) meetings (frequency as needed) throughout the planned
duration of the project.
f. Conduct internal and external coordination as necessary for project development.
g. Coordinate Quality Control/Quality Assurance tasks throughout the planned duration of the
project.
h. Ensure relevant portions of the GDOT PDP, Local Administered Project (LAP), FHWA
Grant Agreement, and other procedures, regulations, and manuals are followed and met.
B. Concept Validation and Updates

1. Review and validate the 2021 approved concept report.
a. Identify any assumptions that should be revised prior to preliminary design.
b. Replicate any analysis using more recent data, if deemed necessary.
c. Prepare a memorandum documenting findings or revisions, if a revised concept
report is not deemed necessary.
d. Prepare a current cost estimate.
2. If updates to the 2021 approved concept report are required by Georgia Department of
Transportation (GDOT): Revise concept report as needed, to include the alignment
described in this document as the preferred alternative.
a. Perform ICE stage 1 and stage 2 screening.
b. Prepare layouts and typical section for the preferred alternative.
c. Updated cost estimate, including right-of-way (ROW).
d. All updates and revisions as needed following submittal to obtain GDOT and
ATLDOT approval.
C. Data Analysis
1. Collect data and produce traffic projections in accordance with the current GDOT
Design Traffic Forecasting Manual, including but not limited to:
a. Roadway conditions and deficiencies
b. Bridge and structure conditions
c. Traffic volumes, including bicyclist and pedestrian volumes, for all intersections
and roadway segments in the project limits
d. Parking information
e. Right-of-way
f. Environmental resources
g. Transit and freight operations in the project area
h. Sidewalk conditions and compliance with ADA and PROWAG
i. Crash history, particularly collisions involving pedestrians and bicyclists
j. Relevant plans, studies, and nearby planned and programmed future projects,
with an emphasis on connectivity for multi-use trails
k. Conduct a site visit, with emphasis on traffic conditions for users of all modes,
and all items referenced in this section (sidewalk condition, ADA compliance,
etc.)
l. Examples of shared use paths in peer cities, especially with comparable land-
use types and demographics.
D. Preliminary Design
1. For phase 1, the Consultant shall prepare preliminary plans in accordance with the
GDOT Design Policy Manual, Streets Atlanta design manual, and any other relevant
design standards and requirements deemed necessary for plans approval.
2. The Consultant shall provide preliminary design services to include the following, but
not limited to:
a. Complete preliminary plans, following the GDOT PDP, Plan Presentation
Guide (PPG), Electronic Data Guidelines (EDG), and Preliminary Field Plan
Review (PFPR) checklist.
b. Prepare for and attend constructability review.
c. Preliminary plans submission, including responding to comments.
d. Prepare for and attend the Avoidance and Minimization Measures Meeting
(A3M) (if required).
e. Project Datasheet
f. Cover Sheet
g. Typical Sections

h. Plan and profile sheets
i. Cross Sections
j. Preliminary Right-Of-Way and Easements
k. Prepare ROW plans for GDOT approval
l. Existing Utilities
m. Drainage Profiles
n. Roadway Design
o. Staging Plans
p. Signing and Marking Plans
q. Preliminary Traffic Signal Plans
r. Driveway Locations
s. Preliminary Erosion Control Plans
t. Draft Special Provisions
u. Intersection Sight Distance (ISD) Studies
v. Approved Design Exceptions/Design Variances (If Required)
w. Prepare and submit Design Databook
x. Prepare layout and other required information for PIOH
y. Prepare a detailed Construction Cost Estimate for concept report and approval
z. First and second utility submission requests to City of Atlanta and all utility
owners
aa. Perform internal Quality Control/Quality Assurance (QC/QA) reviews and
revise plans accordingly. Submit QC/QA letter stating that the plans were
reviewed and corrected
bb. Attend PFPR and address all PFPR comments within four (4) weeks from
Receipt of PFPR Report
cc. Update plans to include all PFPR comments
E. Final Design
1. For phase 1, the Consultant shall provide Final Plan design services to include the
following but not limited to:
a. Complete the final plans meeting the requirements of the GDOT PDP, PPG,
and FFPR accepted comment responses
b. Perform right-of-way staking and easements
c. 2nd submission utilities
d. Prepare and submit the final design databook
e. Roadway plans
f. Signing and marking plans
g. Traffic signal plans
h. Utility plans
i. All special project details
j. All special provisions and specifications
k. Prepare a detailed construction cost estimate; update annually
l. Perform internal Quality Control/Quality Assurance (QC/QA) reviews and
revise plans accordingly. Submit (QC/QA) letter stating that the plans were
reviewed and corrected.
m. Attend FFPR and address all comments within two (2) weeks within receipt of
FFPR report.
n. After FFPR comments have been addressed, the corrected FFPR plans, and
other materials required for the Corrected FFPR plan submission to
Engineering Services will be submitted.
o. Prepare and submit Signal Permit Revisions with Corrected FFPR submittal
p. After corrected FFPR comments have been addressed, the final plans and
other materials required for final plan submission to Construction Bidding
Administration will be submitted.
q. Prepare Revisions and Amendments as required.

r. Hold monthly meetings with City staff, in addition to the other meetings
previously mentioned above, to discuss progress, design issues, and
preparation for other formal meetings
2. Right of way and utility coordination
3. Prepare a set of construction plans for letting
F. Environmental Screening and NEPA
1. Identify environmental resources adjacent to the project according to GDOT's
environmental procedures manual.
2. Prepare all necessary NEPA documents.
a. Perform environmental project management
b. Provide schedule updates
c. Prepare for and attend the Avoidance and Minimization Measures Meeting and
record meeting minutes (if required)
d. Conduct noise analysis, if needed
e. Conduct air survey and prepare reports
f. Conduct ecology survey and prepare reports
g. Additional survey and reporting, as needed
h. Prepare Categorical Exclusion (CE)
i. Perform all activities associated with the Preliminary Field Plan Review (PFPR)
and the Final Field Plan Review (FFPR) meetings
j. Review Environmental Resource Impact Table (ERIT)
k. Review PFPR and FFPR reports and provide written responses to any
environmental comments
l. Environmental site assessment phase 1, if needed
m. Environmental site assessment phase 2, if needed
3. Prepare for a Public Information Open House (PIOH), including attending the meeting
and any dry runs.
G. Public and Stakeholder Engagement
1. Collaborate with the PATH foundation and ATLDOT communications team to develop
a strategy for public and stakeholder engagement, which may include some or all of
the following activities:
a. Attendance at up to three public events, such as Atlanta Streets Alive or NPU
meetings, to engage with members of the public.
b. Develop a survey to gather input from the public on concept design.
c. Conduct a Public Information Open House (PIOH) meeting.
d. Establish a stakeholder group and conduct up to three meetings throughout
the project.
2. Review public input that has been provided during past outreach by ATLDOT,
Department of City Planning, and the PATH Foundation.
3. Prepare materials, including renderings of potential alternatives, to be presented to
public and stakeholders during meetings
4. Prepare a summary of public and stakeholder engagement activities and their
outcomes
Deliverables:
* Revised concept report (with GDOT approval) or memorandum of concept validation
* PFPR design plans
* NEPA document

* FFPR design plans
* ROW Plans
* Construction plans for letting
* Updated cost estimates at each phase
* Summary of public and stakeholder engagement
Related Key Team Leaders:
A. Project Manager
B. Roadway Design Lead
C. Environmental/NEPA Lead
D. Stakeholder Engagement Lead
6.0 Anticipated Schedule of Milestones:
A. Notice to Proceed - Q3 2026
B. Concept Report Approval (if needed) - Q2 2027
C. Preliminary Design - Q2 2028
D. Final Design - Q2 2029
E. ROW Acquisition - Q4 2029
F. Construction Plans Ready for Bidding - Q1 2030
7.0 Critical Success Factors:
A. Experience designing off-system paved shared use trails, particularly within Atlanta and the
state of Georgia.
B. Design to available project budget with a reasonable amount of contingency.
C. Account for public and stakeholder feedback throughout the design process and provide
opportunities to revise plans based on feedback received.
D. Closely collaborate with PATH foundation.
E. Produce plans which are easily understood by a contractor and avoid any misunderstandings
during construction.
8.0 Target Outcome:
GDOT-approved final design plans for a paved shared use trail which provide a high-quality, safe
connection for the nearby communities; which account for the needs and wants of bicyclists and
pedestrians, especially users with disabilities; which consider the interests of nearby residents;
which carefully consider and mitigate negative impacts to the surrounding environment and local
communities; and which serve as a national example of best practices for multimodal facilities.
9.0 Contract Term:
The contract term shall include a base period of 18 months from the commencement date with
two (2) one (1) year renewal options.

Exhibit 1- B
Solid Line = Phase 1
Dash Line = Phase 2

This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Engineering Consulting (GEC) Services for Alternative Delivery Program NIGP Codes Code Description 96258... ...

State Government of Georgia

Bid Due: 10/01/2026

...., Architectural and Engineering Services 91842 Engineering Consulting (Inactive, please see commodity code ...

State Government of Georgia

Bid Due: 10/02/2026

...Civil Engineering 91894 Traffic Consulting 96889 Traffic Studies and Analysis Services 91896... Consulting ...

State Government of Georgia

Bid Due: 10/02/2026

...91327 Construction, Highway and Road 91831 Construction Consulting 93831 Engineering and Surveying...), Including ...

State Government of Georgia

Bid Due: 10/08/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.