MPU Pressure Piping
|
|
Synopsis:
|
|
SRC is currently constructing a unique project: North America’s first integrated, fully commercial, demonstration Rare Earth Processing Facility (REPF). The facility will consist of the Monazite Processing Unit (MPU), Solvent Extraction Unit (SXU), Terbium/Dysprosium Unit (TbDy), Metal Smelting Unit (MSU), and Tailings Processing Unit (TPU) housed within two buildings, Bay R and Bay P. The processing capability of this plant will enable rare earth-containing feedstocks of monazite, chlorides, or carbonates to be separated into individual rare earth elements in various finished forms. The facility is located near SRC’s existing properties in Saskatoon, Saskatchewan.
The Saskatchewan Research Council (SRC) is advancing the construction of North America’s first integrated Rare Earth Processing Facility (REPF) in Saskatoon, Saskatchewan. To support this effort, SRC is seeking qualified respondents to supply and install the pressure piping within the Monazite Processing Unit (MPU) of the REPF.
|
|
Additional Information:
|
|
Included in Scope of Work
5.2.1. All labour, supervision, materials, tools, and equipment necessary to deliver the Scope of Work as described in this document
5.2.2. Review of all SRC-Supplied documentation for completeness, correctness, and constructability, with any discrepancies or deficiencies promptly reported to SRC for resolution
5.2.3. Supply and installation of carbon steel threaded pipe and fittings for Plant Air within the MPU of up to 2” diameter, both registered and non-registered with the Technical Safety Authority of Saskatchewan (TSASK). Refer to the Appendices in this RFQ package for the details of the Scope of Work, including Appendix D – Piping and Instrumentation Diagrams which has the Scope of Work highlighted.
5.2.4. Supply and installation of galvanized carbon steel threaded pipe and fittings for Instrument Air within the MPU of up to 2” diameter, both registered and non-registered with TSASK. Refer to the Appendices in this RFQ package for the details of the Scope of Work, including Appendix D – Piping and Instrumentation Diagrams which has the Scope of Work highlighted.
5.2.5. Installation of the following four air receivers:
5.2.6. 101-TNK-01 Bag Discharge Dust Collector Air Receiver including its pressure safety valve
5.2.7. 101-TNK-02 Grinding Mill Dust Collector Air Receiver including its pressure safety valve
5.2.8. 101-TNK-03 Silo Dust Collector 1 Air Receiver including its pressure safety valve
5.2.9. 101-TNK-04 Silo Dust Collector 2 Air Receiver including its pressure safety valve
5.2.10. Any modifications of the existing air receiver mounts located on the dust collectors as required to accommodate the height of fittings between the receivers and pulse valves. Scope of modifications is to include support demolition, fabrication, we
|
|
|
Competition Type:
|
Request for Quotation
|
|
|
|
|
|
|
|
Competition Documents
(Note: Opening the attached Tender Documents may result in your Organization Name and Province being included on an Interested Bidders List. The Interested Bidders List is live until the competition close date/time. The List is intended to facilitate potential partnerships and subcontracting opportunities to benefit the construction industry that may lead to better bidding)
:
|
|
|
|
|
|
|
RFQ 2526-034 MPU Pressure Piping.pdf
|
|
PDF
|
307.06 Kb
|
Added: Feb 25, 2026
|
|
|
|
|
|
|
Equipment Supply Agreement.pdf
|
|
PDF
|
446.95 Kb
|
Added: Feb 25, 2026
|
|
|
|
|
|
|
Appendix A - Line List.pdf
|
|
PDF
|
422.82 Kb
|
Added: Feb 25, 2026
|
|
|
|
|
|
|
Appendix B - Material Takeoff (MTO).xlsx
|
|
XLSX
|
21.03 Kb
|
Added: Feb 25, 2026
|
|
|
|
|
|
|
Appendix B - Material Takeoff (MTO).pdf
|
|
PDF
|
340.23 Kb
|
Added: Feb 25, 2026
|
|
|
|
|
|
|
Appendix C - Plant Overview.pdf
|
|
PDF
|
779.88 Kb
|
Added: Feb 25, 2026
|
|
|
|
|
|
|
Appendix D - Piping and Instrumentation Diagrams.pdf
|
|
PDF
|
3.14 Mb
|
Added: Feb 25, 2026
|
|
|
|
|
|
|
Appendix E - Piping Specifications.pdf
|
|
PDF
|
2.93 Mb
|
Added: Feb 25, 2026
|
|
|
|
|
|
|
Appendix F - Piping Supports.pdf
|
|
PDF
|
635.24 Kb
|
Added: Feb 25, 2026
|
|
|
|
|
|
|
Appendix G - Site Safety.pdf
|
|
PDF
|
3.50 Mb
|
Added: Feb 25, 2026
|
|
|
|
|
|
|
Appendix H - TSASK Documentation.pdf
|
|
PDF
|
610.19 Kb
|
Added: Feb 25, 2026
|
|
|
|
|
|
|
Appendix I - Connected Equipment.pdf
|
|
PDF
|
5.58 Mb
|
Added: Feb 25, 2026
|
|
|
|
|
|
|
|
|
|
|
|
|
Response Address:
|
|
Saskatchewan Research Council
|
Bay 2D, 820 51st Street East
Saskatoon, SK, Canada
S7K 0X8
|
|
|
|
|
|
Contact:
|
|
Liam Hayward
|
|
Phone: 306-385-4123
|
|
Email:
liam.hayward@src.sk.ca
|
Liam Hayward
liam.hayward@src.sk.ca
306-385-4123
2526-034
|
|
|
|
|
|