| Location: | Florida |
|---|---|
| Posted: | May 27, 2025 |
| Due: | May 30, 2025 |
| Agency: | Tampa International Airport |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: Airside D Development Program Guideway Structure
Addenda: 3
Release Date: 4/17/2025
Due Date: 5/30/2025
The scope of work for the Airside D Development Program Guideway Structure includes the construction of an elevated concrete structure serving the new Automated People Mover (APM), connecting the main terminal to the new Airside D terminal. The Guideway Structure will include, but not be limited to, foundation, vertical piers, horizontal structure, and associated utility infrastructure required for the APM. The Guideway Structure will also provide a pathway for utilities that extend from the existing main terminal to the new Airside D, including support and enclosure for the baggage handling conveyor system. The scope of work also includes the connection to the Main Terminal and Airside D train tube stations.

With GovernmentContracts, you can:
...120-2026 Construction of Reinforced Concrete Pad for Enclosed Heavy Equipment Storage Structure... 12th ...
Town of Lake Park Florida
Bid Due: 7/06/2026
...72152711 Concrete patio construction service 72152901 Metal building front installation service... Patio and ...
State Government of Florida
Bid Due: 10/01/2026
...construction of a new facility and parking structure at NAS Jacksonville. The facility ...
DEPT OF DEFENSE
Bid Due: 6/09/2026
...Improvements Invitation For Bid Engineering & Construction 91200 , 91300 , 91400 Project ...
Volusia County
Bid Due: 6/25/2026