| Location: | Florida |
|---|---|
| Posted: | May 27, 2025 |
| Due: | May 30, 2025 |
| Agency: | Tampa International Airport |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: Airside D Development Program Guideway Structure
Addenda: 3
Release Date: 4/17/2025
Due Date: 5/30/2025
The scope of work for the Airside D Development Program Guideway Structure includes the construction of an elevated concrete structure serving the new Automated People Mover (APM), connecting the main terminal to the new Airside D terminal. The Guideway Structure will include, but not be limited to, foundation, vertical piers, horizontal structure, and associated utility infrastructure required for the APM. The Guideway Structure will also provide a pathway for utilities that extend from the existing main terminal to the new Airside D, including support and enclosure for the baggage handling conveyor system. The scope of work also includes the connection to the Main Terminal and Airside D train tube stations.

With GovernmentContracts, you can:
...of items and equipment for one (1) kitchen dish machine (Hobart Conveyor Base ...
State Government of Florida
Bid Due: 9/12/2026
...EQUIPMENT NAICS Code: 333922 - Conveyor and Conveying Equipment Manufacturing Place of Performance...
DEPT OF DEFENSE
Bid Due: 8/10/2026
...the reinstallation of items and equipment for one (1) kitchen dish machine (Hobart ...
State Government of Florida
Bid Due: 9/11/2026