| Location: | Florida |
|---|---|
| Posted: | May 27, 2025 |
| Due: | May 30, 2025 |
| Agency: | Tampa International Airport |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: Airside D Development Program Guideway Structure
Addenda: 3
Release Date: 4/17/2025
Due Date: 5/30/2025
The scope of work for the Airside D Development Program Guideway Structure includes the construction of an elevated concrete structure serving the new Automated People Mover (APM), connecting the main terminal to the new Airside D terminal. The Guideway Structure will include, but not be limited to, foundation, vertical piers, horizontal structure, and associated utility infrastructure required for the APM. The Guideway Structure will also provide a pathway for utilities that extend from the existing main terminal to the new Airside D, including support and enclosure for the baggage handling conveyor system. The scope of work also includes the connection to the Main Terminal and Airside D train tube stations.

With GovernmentContracts, you can:
...Follow 7320--Conveyor Pizza Oven Active Contract Opportunity Notice ID 36C24826Q0574 Related... a requirement ...
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 6/09/2026
...of items and equipment for one (1) kitchen dish machine (Hobart Conveyor Base ...
State Government of Florida
Bid Due: 9/12/2026
...the reinstallation of items and equipment for one (1) kitchen dish machine (Hobart ...
State Government of Florida
Bid Due: 7/18/2026
.... * Removal of receptacles and breakers providing power to the existing conveyor ...
Miami-Dade County
Bid Due: 7/02/2026