| Location: | California |
|---|---|
| Posted: | Apr 15, 2026 |
| Due: | May 7, 2026 |
| Agency: | County of San Joaquin |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
| Number | Deadline |
|
Groves Road and San Julian Road Resurfacing
The work is located North of State Route 4 near Farmington, California.
The work, in general, consists of repairing and resurfacing approximately 0.9 mile of roadway with asphalt concrete. Base Estimate Range between $286,000 and $349,000 |
05/07/2026 08:31 PM UTC |

With GovernmentContracts, you can:
...Contact: Eric van Leeuwen E-Mail 19-745-016 PLANT MIX ASPHALT CONCRETE - EAST SLOPE ...
El Dorado County
Bid Due: 9/14/2028
...Basic Information Title Hot mix asphalt (Type A), culvert work, and minor concrete. ...
State Government of California
Bid Due: 10/22/2026
...(PAI) sites. The scope of work includes sidewalk, driveway, curb, and gutter replacement; ...
City of Los Angeles
Bid Due: 10/14/2026
...Description: Demolish and remove the existing exterior weight room structure, concrete/asphalt, fencing...
Corona-Norco (California) Unified School District
Bid Due: 9/28/2026