St. Charles County, MO
Date Issued: 4/13/2026
Sealed bids for the Hopewell Rd. Water Main Relocation (hereinafter “Project”) will be received by the Public Water Supply District No. 2 of St. Charles County, Missouri (“Owner”), until 2:00 P.M. CST, on Tuesday, May 12th, 2026, at the Owner’s office, 100 Water Drive, O’Fallon, MO 63368 . There will be a pre-bid meeting at 10:00 A.M. CST, on Thursday April 23rd, 2026 at the Owner’s office .
The project consists of the installation of approximately 431 linear feet of 8-inch C-900 PVC water main at four separate locations along Hopewell Road to accommodate planned roadway improvements. Work includes all necessary appurtenances and connections required to relocate the existing water main and maintain service during construction.
Bidding Documents may be downloaded from Drexel Technologies Plan room. www: projectbids.drexeltech.com .
Bid security in the amount of Five percent (5%) of the bid amount must accompany each bid, in accordance with the Instruction to Bidders.
Wages shall be paid to each employee engaged in the work at a rate not less than the prevailing rate of wages for the particular trade or occupation, as issued by the Missouri Department of Labor and Industrial Relations. The Contractor shall be responsible for complying with the prevailing rate of wages for St. Charles County, Missouri. The Contractor shall be responsible for complying with Missouri Immigration Laws, and must submit the Work Authorization Affidavit with Bid. Contractor shall provide a ten hour Occupational Safety and Health Administration (OSHA) construction safety program for its employees working onsite on the project, as described in Section 800.
THE OWNER INTENDS TO AWARD THE CONTRACT TO THE MOST RESPONSIVE, RESPONSIBLE BIDDER SUBMITTING THE LOWEST BID. THE OWNER RESERVES THE RIGHT TO REJECT ANY AND ALL BIDS, AND TO WAIVE ANY INFORMALITIES NOT INVOLVING PRICE, TIME OR CHANGES IN THE WORK IN THE BEST INTEREST OF THE OWNER.
Pre-bid meeting:
April 23rd, 10am at 102 Water Dr, O'Fallon MO, 63368 in Engineering Conference room
Questions Due by:
May 5th
Bid Opening:
May 12th, 2pm at 102 Water Dr, O'Fallon MO, 63368 in Engineering Conference room
Award by Board:
May 21st

With GovernmentContracts, you can:
..." bid proposal. The proposed work includes: the construction of multiple sidewalks, pedestrian... ...
Missouri Department of Transportation(MDOT)
Bid Due: 6/12/2026
...to Platte County Public Works at 816-858-2223. All labor used in the construction ...
Missouri Department of Transportation(MDOT)
Bid Due: 6/15/2026
...Springfield Blue Print at www.spfdblue.com or (417) 869- 7316. All labor used in ...
Missouri Department of Transportation(MDOT)
Bid Due: 6/10/2026
...the construction of a 123' -8-3/4 " long, single span, Prestressed Concrete NU-Girder ...
Missouri Department of Transportation(MDOT)
Bid Due: 6/03/2026