USS O'Kane DDG-77 Removal and Disposal of Fuel

Location: California
Posted: Jan 8, 2026
Due: Jan 12, 2026
Agency: DEPT OF DEFENSE
Type of Government: Federal
Category:
  • F - Natural Resources and Conservation Services
Solicitation No: N0024426QS013
Publication URL: To access bid details, please log in.
Follow
USS O'Kane DDG-77 Removal and Disposal of Fuel
Active
Contract Opportunity
Notice ID
N0024426QS013
Related Notice
Department/Ind. Agency
DEPT OF DEFENSE
Sub-tier
DEPT OF THE NAVY
Major Command
NAVSUP
Sub Command
NAVSUP GLOBAL LOGISTICS SUPPORT
Sub Command 2
NAVSUP FLC SAN DIEGO
Office
NAVSUP FLT LOG CTR SAN DIEGO
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information View Changes
  • Contract Opportunity Type: Combined Synopsis/Solicitation (Updated)
  • Updated Published Date: Jan 08, 2026 02:27 pm PST
  • Original Published Date: Jan 07, 2026 04:05 pm PST
  • Updated Date Offers Due: Jan 12, 2026 10:00 am PST
  • Original Date Offers Due: Jan 12, 2026 10:00 am PST
  • Inactive Policy: 15 days after date offers due
  • Updated Inactive Date: Jan 27, 2026
  • Original Inactive Date: Jan 27, 2026
  • Initiative:
    • None
Classification
  • Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
  • Product Service Code: F108 - ENVIRONMENTAL SYSTEMS PROTECTION- ENVIRONMENTAL REMEDIATION
  • NAICS Code:
    • 562112 - Hazardous Waste Collection
  • Place of Performance:
    San Diego , CA 92135
    USA
Description View Changes

The purpose of this amendment 01 is to:




  1. Add to PWS that the fuel being offloaded is microbially contaminated. Tank Group 6 returned a result of 3 colonies, equating to approximately 12,000 CFU/L. The composite sample did not show visible microbial activity; however, presence of biological growth is confirmed in the individual tank group. The lab completed a full B-1 analysis on the OKN samples. Most parameters are within spec. Notable observations include Particulates trending high at 8.7 mg/L (fail point is 10 mg/L). Color results showing an off-hue rating, indicating fuel darkening and potential early degradation. While not technically failing for clear & bright, the overall appearance is significantly darker than normal, reinforcing quality concerns.

  2. Add Questions and answers document. The Q&A are as follows:




  • Just to clarify my understanding is the is fuel is microbially contaminated. Can you confirm this as the solicitation doesn’t confirm that.



Answer: Yes, the fuel is microbially contaminated. Tank Group 6 returned a result of 3 colonies, equating to approximately 12,000 CFU/L. The composite sample did not show visible microbial activity; however, presence of biological growth is confirmed in the individual tank group. The lab completed a full B-1 analysis on the OKN samples. Most parameters are within spec. Notable observations include Particulates trending high at 8.7 mg/L (fail point is 10 mg/L). Color results showing an off-hue rating, indicating fuel darkening and potential early degradation. While not technically failing for clear & bright, the overall appearance is significantly darker than normal, reinforcing quality concerns.




  • Can you confirm project start and end date?



Answer: Per the SOW, all work shall be completed by 23 January 2026. Work must be completed on weekdays in between 0700-1600. Due to the expedited nature of this requirement, we prefer that works start on January 15 to January 23,2026.




  • Do you know if we’ll be allowed to set up a frac tank system (nearby) at the base to offload the fuel and store it prior to pumping into our vac trucks to haul for disposal?



Answer: As long as it fits outside the fire lane boundary on pier 3.




  • Will the ship be pre-boomed by the USN or will we (as the Contractor) need to boom it off?



Answer: Ship is currently boomed.




  • The hours of operation state shipyard hours are 0700-1600, normally with over-the-water offloading, we are allowed to offload around the clock - can you please check this?



Answer: We are only able to defuel during daylight hours.



All other terms and conditions remain unchanged.


Attachments/Links
Contact Information
Contracting Office Address
  • 3985 CUMMINGS ROAD BLDG 116
  • SAN DIEGO , CA 92136
  • USA
Primary Point of Contact
Secondary Point of Contact


History

Related Document

Jan 7, 2026[Combined Synopsis/Solicitation (Original)] USS O'Kane DDG-77 Removal and Disposal of Fuel
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.