| Location: | Georgia |
|---|---|
| Posted: | Oct 21, 2025 |
| Due: | Nov 20, 2025 |
| Agency: | State Government of Georgia |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PE-77129-NONST-2026-000000043 |
| Publication URL: | To access bid details, please log in. |
| Event ID | Event Title | Government Entity | Start Date (ET) | End Date (ET) |
| PE-77129-NONST-2026-000000043 | Construction of the Realignment of White Sulphur Road - Phase II | Hall County Board Of Commissioners |
Oct 21, 2025 @ 04:34 PM
|
Nov 20, 2025 @ 02:00 PM
|
Start Date: Oct 21, 2025 @ 04:34 PM ET
End Date:
Nov 20, 2025 @ 02:00 PM ET
Providing all materials, equipment and labor for construction of the proposed realignment of White Sulphur Road from Cagle Road to State Route (SR) 365/Cornelia Hwy located in central Hall County. The proposed project will begin just south of Norfolk Southern Railroad and end just south of SR 365 for a total project length of approximately
0.66 miles. The proposed typical section for White Sulphur Road includes three 11-ft travel lanes (one lane in the southbound direction and two lanes in the northbound direction). The southbound 16-ft wide outside shoulder will include curb and gutter and will have a 10-ft share-use path for approximately 670-ft before transitioning to a 12-ft wide outside shoulder with curb and gutter and a 5-ft sidewalk for the remainder of the project. The northbound outside shoulder will be 10-ft wide with curb and gutter. The project also includes the installation of drainage structures, storm drainpipes, water lines and appurtenances, asphalt, traffic signals and markings, landscaping, erosion, sedimentation and pollution control measures, and other associated work.
| Code | Description |
| 92528 | Drainage Engineering |
| 91066 | Roofing, Gutters, and Downspouts Maintenance and Repair Services |
| 91395 | Paving and Resurfacing, Highway and Road |
| 91319 | Construction, Curb and Gutter, Including Maintenance, Repair, and Removal Services |
| 75560 | Concrete Curbers, Gutter Machines and Accessories |
Laura Falleck
lfalleck@hallcounty.org
7705314939

With GovernmentContracts, you can:
...to outlet control structure, concrete retaining wall construction, demolition of raw water tower... ...
State Government of Georgia
Bid Due: 6/23/2026
...Type: county Fiscal Year: 2026 Agency Site: Link Description The construction of the ...
State Government of Georgia
Bid Due: 6/11/2026
..., prior to the demolition/construction work. * Existing monolithic concrete slab foundation shall... ...
Troup County
Bid Due: 6/09/2026
...monolithic concrete slab foundation shall be protected during demolition/construction work and remain... complete ...
Troup County
Bid Due: 6/09/2026