| Location: | Texas |
|---|---|
| Posted: | Mar 12, 2025 |
| Due: | Apr 11, 2025 |
| Agency: | City of Dallas |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | CIZ-DWU-25-045E |
| Publication URL: | To access bid details, please log in. |
Project Description: The objective of the Main Stem Balancing Reservoir (MSBR) Feasibility Study is to advance the evaluation of the MSBR strategy from the planning level included the Long Range Water Supply Plan (LRWSP) to a feasibility level by identifying potential challenges in implementing the project; evaluating the associated risk and level of effort to overcome these challenges; providing recommendations, timelines, and budgets, for additional studies, permitting and design; preliminary design of the dam/embankment, riverine intake and pump station, MSBR intake and pumpstation and transmission line to connect to DWU’s water supply system. All designs and cost estimations should be in line with a maturity level as described in the AACE International Recommended Practice 18R-97 Class 4.
Project Manager: Garrett Moore, PE, CFM

With GovernmentContracts, you can:
Bid Information Type Competitive Sealed Proposal Status Issued Number 26-029 (Districtwide Water Treatment
El Paso Independent School District
Bid Due: 7/01/2026
Bid Number: CSJ: 0081-03-069 Bid Title: Green Ribbon FY26 Median Improvements Category: Bids
Roanoke city
Bid Due: 6/29/2026
Bid Number Bid Title Bid Type Organization Bid Issue Date Bid Close Date
City of College Station
Bid Due: 7/09/2026
Project: Semi-Automatic Weapons Exchange Ref. #: BU26-00030264 Type: RFB Status: Open Open Date:
City of Dallas
Bid Due: 6/26/2026