| Location: | South Carolina |
|---|---|
| Posted: | Sep 3, 2025 |
| Due: | Oct 2, 2025 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 24178 |
| Publication URL: | To access bid details, please log in. |
The Project consists of the construction of a new 1,725 square-foot train depot museum and event space with an attached 1,490 square-foot open-air covered patio for the new home of the Greenwood Railroad Museum. The scope of work also includes a new parking lot. The project is located at the site of the existing museum located at 906 Main Street South, Greenwood, SC 29646.

With GovernmentContracts, you can:
...Delivery Method: Design-Bid-Build Construction Cost Range: n/a Agency Project Coordinator: Mosely... Designs Email: ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 9/02/2026
...Delivery Method: Design-Bid-Build Agency Project Coordinator: BLAKE BARBARE Email: BLAKE.BARBARE... of an engineering ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 8/17/2026
...of a conceptual design for the replacement new Miriam Brown Community Center. Full ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 8/06/2026
...School District One Anticipated Project Delivery Method: Design-Bid-Build Agency Project Coordinator... term Indefinite ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 8/07/2026