Request for Letters of Interest: BL-0052 Main Street Sidewalk Connector (TOHS Project #22-007)

Location: North Carolina
Posted: Feb 24, 2026
Due: Mar 20, 2026
Agency: State Government of North Carolina
Type of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
  • Z - Maintenance, Repair or Alteration of Real Property
Solicitation No: 440-BL-0052 (TOHS #22-007)
Publication URL: To access bid details, please log in.
Solicitation Number: 440-BL-0052 (TOHS #22-007)
Project Title: Request for Letters of Interest: BL-0052 Main Street Sidewalk Connector (TOHS Project #22-007)
Description: The Town of Holly Springs (Town) desires to engage Private Engineering (PE) consulting firms to provide Construction Engineering and Inspection (CEI) and Construction Contract Administration (CA) services for the Main Street Sidewalk project.
Opening Date: 3/20/2026 2:00 PM
Posted Date: 2/25/2026
Status: Open
Department: TOWN OF HOLLY SPRINGS
Solicitation Number
*
440-BL-0052 (TOHS #22-007)
Department
TOWN OF HOLLY SPRINGS
Status Reason
Open
Opening Date
2026-03-20T14:00:00.0000000
Posted Date
*
2026-02-24T15:31:02.0000000Z
Primary Commodity Code
Engineering procurement and project management services
Mandatory Conference/Site Visit
Special Instructions
The Town of Holly Springs website is the primary source for information regarding this project. https://www.hollyspringsnc.gov/2456/Bids-Requests-for-Proposals - Additional Information can be found at the NC DOT Website: https://connect.ncdot.gov/letting/Private%20Engineering%20Firm%20Advertisement/Forms/AllItems.aspx
Solicitation Type
*
Select RFP IFB RFI
Owner
Kelli Hyde
Description
The Town of Holly Springs (Town) desires to engage Private Engineering (PE) consulting firms to provide Construction Engineering and Inspection (CEI) and Construction Contract Administration (CA) services for the Main Street Sidewalk project.

Attachment Preview

February 23, 2026
Town of Holly Springs
Utilities & Infrastructure
?? P.O. Box 8 | 128 S. Main St.
Holly Springs, NC 27540
?? (919) 577-3150
utilities-infrastructure@hollyspringsnc.gov
?? www.hollyspringsnc.gov
Town of Holly Springs
REQUEST for LETTERS of INTEREST (RFLOI)
Contract Type - CEI
TITLE:
ISSUE DATE:
SUBMITTAL DEADLINE:
ISSUING AGENCY:
BL-0052 Main Street Sidewalk Connector (TOHS Project No. 22-007)
February 23, 2026
March 20, 2026
Town of Holly Springs
SYNOPSIS
SUBCONSULTANTS ARE PERMITTED UNDER THIS CONTRACT.
This contract shall be partially reimbursed with Federal-aid funding through the North Carolina
Department of Transportation (hereinafter referred to as the Department). The solicitation,
selection, and negotiation of a contract shall be conducted in accordance with all Department
requirements and guidelines.
The primary and/or subconsultant firm(s) shall be pre-qualified by the Department to perform ALL
of the Discipline Codes listed below for the Town of Holly Springs. Discipline Codes required
are:
00195 Roadway Construction Engineering & Inspection
00233 Structures Construction Engineering & Inspection
WORK CODES for each primary and/or subconsultant firm(s) SHALL be listed on the respective
RS-2 FORMS (see section ‘SUBMISSION ORGANIZATION AND INFORMATION REQUIREMENTS’).
This RFLOI is to solicit responses (LETTERS of INTEREST, or LOIs) from qualified firms to provide
professional consulting services to:
The Town of Holly Springs (Town) desires to engage Private Engineering (PE) consulting
firms to provide Construction Engineering and Inspection (CEI) and Construction Contract
Administration (CA) services for the following project:
Project
Main Street
Sidewalk
TIP #
BL-0052
ROW
50275.2.1
Utility
50275.2.2
CON
50275.3.1
Funding
CMAQ
Additional Project specific details are summarized below:
This project consists of construction of approximately 1,125 linear feet of sidewalk on the east side
of N. Main Street from Arbor Creek Drive to Trellis Point Drive. Construction is anticipated to begin
Summer of 2026.
The selected firm will report directly to the Town, administer the construction contracts, and ensure
that all work is performed in accordance with the contract requirements.
Primary work elements and service include but are not limited to all NCDOT required
inspections and materials testing. The Town is seeking a firm whose combination of
experience and personnel will provide timely, cost-effective and quality professional services
to support this project.
Electronic LOIs should be submitted in .pdf format using software such as Adobe, CutePDF, PDF Writer,
Docudesk deskPDF, etc.
LOIs SHALL be received ELECTRONICALLY no later than 2:00 p.m., March 20, 2026.
The address for electronic deliveries is: purchasing@hollyspringsnc.gov
LOIs received after this deadline will not be considered.
Except as provided below any firm wishing to be considered must be properly registered with the Office
of the Secretary of State and with the North Carolina Board of Examiners for Engineers and Surveyors.
Any firm proposing to use corporate subsidiaries or subcontractors must include a statement that these
companies are properly registered with the North Carolina Board of Examiners for Engineers and
Surveyors and/or the NC Board for Licensing of Geologists. The Engineers performing the work and in
responsible charge of the work must be registered Professional Engineers in the State of North Carolina
and must have a good ethical and professional standing. It will be the responsibility of the selected private
firm to verify the registration of any corporate subsidiary or subcontractor prior to submitting a Letter of
Interest. Firms which are not providing engineering services need not be registered with the North
Carolina Board of Examiners for Engineers and Surveyors. Some of the services being solicited may not
require a license. It is the responsibility of each firm to adhere to all laws of the State of North Carolina.
The firm must have the financial ability to undertake the work and assume the liability. The selected
firm(s) will be required to furnish proof of Professional Liability insurance coverage in the minimum
amount of $1,000,000.00. The firm(s) must have an adequate accounting system to identify costs
chargeable to the project.
The selected firm will be responsible for the contract administration, field inspection, and project
documentation in accordance with NCDOT Standard Specifications for Roads and Structures and the
NCDOT Construction Manual.
SCOPE OF WORK
The Town of Holly Springs is soliciting proposals for the services of a firm/team for the following
contract scope of work:
The Town, in coordination with North Carolina Department of Transportation, is issuing this
RFLOI for this project. The project is planned to be bid out in the next six (6) months.
Project
Main Street
Sidewalk
TIP #
BL-0052
ROW
50275.2.1
Utility
50275.2.2
CON
50275.3.1
Funding
CMAQ
The desired services include Construction Engineering and Inspection (CEI) and Construction
Contract Administration for the project as described above. Tasks to be performed include, but are
not necessarily limited to:
Ensure all work performed by the contractor meets the requirements of the plans, specs,
contract, NCDOT 2024 Standard Specifications for Roadways and Structures, and the
NCDOT Construction Manual
The chosen CEI firm will perform all required work for project oversight to ensure that the
project meets all the requirements of plans, specs, contract, NCDOT 2024 Standard
Specifications for Roadways and Structures, and the NCDOT Construction Manual to include
but not limited to the following items listed below:
o Producing an Inspector’s Daily Report giving a detailed account of all activities
o General project oversight
o Required Materials testing
o Maintaining a Project Diary with Inspector’s Daily Reports and other required
information
o Maintaining Pay Records
Attend preconstruction meeting and assist Town staff in ensuring proper execution of all
contract documents
Ensuring safety compliance from the Contractor
Reviewing and verifying contractor pay applications
Maintaining written correspondence with the Contractor
Schedule and conduct monthly progress meetings as necessary
Completing and maintaining minutes of all project monthly meetings
Ensuring Contractor compliance with Buy America provisions in 23 U.S.C. Sec. 313 and 23
C.F.R. Sec. 635.410
Ensuring timely Contractor/Subcontractor submission of Certified Payrolls, ensuring Certified
Payrolls include all required information, and maintaining Certified Payrolls in the project file
Verifying certified payrolls to assist Town in making payments to the Contractor
Performing calendar year quarterly Wage Rate Interviews and other employee interviews as
necessary to ensure proper Contractor and-or Subcontractor employee classification and
compensation and proper inclusion of employees on Contractor and-or Subcontractor
Certified Payrolls; notifying the Town of any and all complaints by Contractor/Subcontractor
employees related to payment or employment classification; and coordinating with the Town
as needed to investigate and-or report complaints to NCDOT or other applicable agencies
Ensuring that appropriate federal posters are displayed on the jobsite and accessible to all
employees on the jobsite
Processing all Change Orders and Supplemental Agreements for project construction
Processing all Requests for Extensions in Contract Time and Additional Compensation claims
Ensuring prompt payment by the Contractor to any Subcontractors
Ensuring Contractor submittal, with each pay request, of accounting of payments made to
Performing final inspection and when work is to contract standards recommending
acceptance of the project to the Town
Working with the NCDOT Materials and Tests Unit in ensuring that all project materials and
products meet the required criteria; and providing and/or maintaining required materials and
testing documentation
Completing and/or reviewing of Materials Received Reports (MRRs) for any non- exempt
materials to be temporarily or permanently incorporated in the construction; and, as needed,
assisting the Town in investigating and follow-up action in the event one or more materials
fail tests
Communicating with NCDOT and-or FHWA regarding Independent Assurance testing of
materials
As needed, working with the Town to keep in communication with appropriate staff from the
NCDOT regarding project progress
Submitting original project materials records to the NCDOT Materials and Tests Unit as
necessary
Inspecting erosion control devices to ensure they are properly installed and maintained
Maintain erosion control Records
Inspecting Traffic Control for compliance with MUTCD/Traffic Control Plan and maintain
documentation
Coordinating with the Town in arranging reimbursement requests from NCDOT, and ensuring
that the Contractor and-or Subcontractors do not engage in any activity in violation of a
provision in the Municipal Agreement or Supplemental Agreements These documents will be
provided to the selected firm
In general, ensuring Contractor/Subcontractor compliance with approved plans and
specifications
Miscellaneous communication with the Town and NCDOT relating to the tasks listed above
or other matters pertinent to the CEI services
Communicating and coordinating as needed with Cary Utilities for associated water and
sewer work and/or issues
The preparation and assembly of the final estimate
Assist the Town in the preparation of final closeout with NCDOT
The required responsibilities for the CEI should include contract administration, project
management, and project documentation in accordance with NCDOT Standard Specifications
and NCDOT Construction Manual.
PROPOSED CONTRACT TIME: 6 months
PROPOSED CONTRACT PAYMENT TYPE: Cost-Plus
SUBMITTAL REQUIREMENTS
All LOIs are limited to Fifteen (15) pages (RS-2 forms are not included in the page count) inclusive of
the cover sheet, and shall be typed on 8-1/2” x 11” sheets, single-spaced, one-sided.
LOIs containing more than Fifteen (15) pages will not be considered.
Firms submitting LOIs are encouraged to carefully check them for conformance to the
requirements stated above. If LOIs do not meet ALL of these requirements they will be
disqualified. No exception will be granted.
SELECTION PROCESS
Following is a general description of the selection process:
The LGA’s Selection Committee will review all qualifying LOI submittals.
For Project-Specific Contracts (non On-Call type contracts), the LGA’s Selection Committee MAY,
at the LGA’s discretion, shortlist firms to be interviewed. The number of firms invited to interview
will be determined by the LGA based on the qualifications received. IF APPLICABLE, dates of
shortlisting and dates for interviews are shown in the section SUBMISSION SCHEDULE AND
KEY DATES at the end of this RFLOI.
In order to be considered for selection, consultants must submit a complete response to this
RFLOI prior to the specified deadlines. Failure to submit all information in a timely manner will
result in disqualification.
TITLE VI NONDISCRIMINATION NOTIFICATION
The LGA in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42
US.C. §§ 2000d to 2000d-4) and the Regulations, hereby notifies all RESPONDENTS that it will
affirmatively ensure that any contract entered into pursuant to this advertisement will be afforded full and
fair opportunity to submit LETTERS of INTEREST (LOIs) in response to this ADVERTISEMENT and will
not be discriminated against on the grounds of race, color, or national origin in consideration for an award.
SMALL PROFESSIONAL SERVICE FIRM (SPSF) PARTICIPATION
The Department encourages the use of Small Professional Services Firms (SPSF). Small businesses
determined to be eligible for participation in the SPSF program are those meeting size standards defined
by Small Business Administration (SBA) regulations, 13 CFR Part 121 in Sector 54 under the North
American Industrial Classification System (NAICS). The SPSF program is a race, ethnicity, and gender
neutral program designed to increase the availability of contracting opportunities for small businesses on
federal, state or locally funded contracts. SPSF participation is not contingent upon the funding source.
The Firm, at the time the Letter of Interest is submitted, shall submit a listing of all known SPSF firms that
will participate in the performance of the identified work. The participation shall be submitted on the
Department’s Subconsultant Form RS-2. RS-2 forms may be accessed on the Department’s website at
NCDOT Connect Guidelines & Forms.
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...submittals from consultant engineering ?rms to provide professional solid waste consulting services... engineering ...

New Hanover County

Bid Due: 6/30/2026

...statements of qualifications ("SOQs") for consulting services to perform architectural, engineering... is accepting ...

State Government of North Carolina

Bid Due: 6/19/2026

...) is soliciting Letters of Interest (LOIs) from qualified consulting Consultants to provide... ...

State Government of North Carolina

Bid Due: 6/09/2026

...: * 000195 - ROADWAY CONSTRUCTION ENGINEERING AND INSPECTION. * 000233 - STRUCTURES ...

City of Durham

Bid Due: 7/07/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.