| Location: | California |
|---|---|
| Posted: | Aug 8, 2025 |
| Due: | Sep 2, 2025 |
| Agency: | UCLA Capital Programs |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 940041.01 |
| Publication URL: | To access bid details, please log in. |
| Project Name | UCLA Research Park East Core and Shell Improvements | ||
| Project Number | 940041.01 | ||
| Project Description |
Subject to conditions prescribed by the University of California, Los Angeles, responses to the University's prequalification documents for a CM at Risk contract (on which the University is considering utilizing Best Value Selection methodology) are sought from prospective prime contractor bidders (hereafter “bidders”) for the following project:
The project includes core and shell improvements at UCLA Research Park East, located at 10800 West Pico Boulevard, Los Angeles, to enable it to support future biomedical research and quantum physics laboratories. Formerly a shopping mall, the property was undergoing conversion to office space for a single tenant at the time of acquisition by the University. As part of the core and shell work at Research Park East, the structure shall be retrofitted to accommodate vibration-sensitive quantum physics and biomedical research laboratories. A new vibration or seismic separation shall be introduced to allow the eastern third of the building to be developed in a separate future phase. The partially constructed mechanical, electrical, and plumbing systems installed for the former tenant’s office functions shall be removed and replaced to provide new points of connection for future tenant improvement projects. Portions of the basement parking level and the existing loading dock shall be floodproofed to protect these areas and support future vibration- and light-sensitive programming. The at-grade loading dock shall be upgraded to serve the first phase of tenant improvements in advance of the possible future construction of a second loading dock to support full buildout in the future. TO VIEW AND DOWNLOAD ALL FURTHER INFORMATION (PREQUALIFICATION DOCUMENTS; ADDENDA, IF ANY; PQ CONFERENCE SIGN-IN SHEET; ETC.), CLICK HERE: UCLA ONLINE PLANROOM |
||
| Estimated Construction Cost Range | Up to $310,000,000 | ||
| Ad for Subs | |||
| 908736.01 | |||

With GovernmentContracts, you can:
...advertised is Phase 1 which includes replacing lights in the Civic Center parking ...
Marin County
Bid Due: 6/11/2026
...and a secondary point of ingress/egress. Lighted, non-exclusive or reserved on-site parking for ...
DEPT OF DEFENSE
Bid Due: 7/03/2026
...: Office Parking: 2 reserved Lease Term: 15 years, 13 years firm Amortization ...
GENERAL SERVICES ADMINISTRATION
Bid Due: 6/08/2026