| Location: | Oregon |
|---|---|
| Posted: | May 12, 2026 |
| Due: | May 20, 2026 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | W9127N26BA001 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
W9127N26BA001 Amendment 0004 posted 12 May 2026
Update: Bidder Inquiries in ProjNet will close at the end of the day (6 MAY 2026) and all responses will be posted on or before the 7th business day preceding the bid submission IAW the solicitation.
W9127N26BA001 Contractor JD Fish Pump Site Visit Roster posted 4 May 2026
W9127N26BA001 Amendment 0003 posted 1 May 2026
W9127N26BA001 Amendment 0002 posted 22 April 2026
W9127N26BA001 Amendment 0001 posted 9 April 2026
---------------------------------------------------
The U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for the John Day Fish Pump Rehabilitation at John Day Dam, Oregon. The proposed project will be a Total Small Business Set-Aside, firm-fixed price (FFP) contract.
Background: Prior work on fish pump No.3 included replacement of the lower pump shaft, true-up machining of the upper pump shaft, true-up machining of the upper and lower bearing mounting flanges and spigot bores on the cover plate and diffuser, and true-up machining of the diffuser extension cone. The propeller itself had its blade tips built up with weld and re-machined a proper clearance (nominally 1/8" radial clearance) to the pit liner. In addition, the propeller center bores were true-up machined for proper fit (0.004-0.006" clearance) to the new lower shaft. The upper and lower bearings were fitted with greaseless bearing liners and the shafts existing stainless bearing journals were replaced with spares originally manufactured by Worthington Pump. work will be replicated for pump No.2 and possible pump No.1 and No. 3.
Purpose: The project will include the removal, refurbishment, and replacement of major components of Fish Pump Units 1, 2 and 3, including but not limited to shafts, bearings, bearing brackets, and right-angle drive gearboxes. Work will require field disassembly of existing equipment, transport of components for off-site shop repair, precision machining, fabrication of replacement parts, and final reinstallation and alignment to manufacturer specifications.
The following information represents the project objectives:
| Feb 9, 2026 | [Presolicitation (Original)] John Day Fish Rehabilitation |
| Apr 8, 2026 | [Solicitation (Original)] John Day Fish Pump Rehabilitation |
| Apr 9, 2026 | [Solicitation (Updated)] John Day Fish Pump Rehabilitation |
| Apr 22, 2026 | [Solicitation (Updated)] John Day Fish Pump Rehabilitation |
| May 1, 2026 | [Solicitation (Updated)] John Day Fish Pump Rehabilitation |
| May 4, 2026 | [Solicitation (Updated)] John Day Fish Pump Rehabilitation |
| May 6, 2026 | [Solicitation (Updated)] John Day Fish Pump Rehabilitation |
| May 21, 2026 | [Solicitation (Updated)] John Day Fish Pump Rehabilitation |

With GovernmentContracts, you can:
...and Civil Engineering Construction Place of Performance: Cascade Locks , OR USA Description ...
DEPT OF DEFENSE
Bid Due: 6/05/2026
...Code: 237990 - Other Heavy and Civil Engineering Construction Place of Performance: OR ...
HOMELAND SECURITY, DEPARTMENT OF
Bid Due: 6/10/2026