| Location: | Connecticut |
|---|---|
| Posted: | Jan 30, 2026 |
| Due: | Mar 3, 2026 |
| Agency: | State Government of Connecticut |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 2024B-20 |
| Publication URL: | To access bid details, please log in. |
The Work shall consist of all labor, equipment, fees, permits, and other related costs necessary to provide for the installation of approximately 2,260 LF of 12-in ductile iron water main with restrained joints and 35 LF of 8-in ductile iron water main with restrained joints installed on Windsor Street between Sanford Street to Main Street. The transfer of 19 water services smaller than 4-inches, the transfer of 14 water services greater than 4-inches, and removal and replacement of 6 fire hydrant assembly on Windsor Street. Abandonment of approximately 2,000 LF of existing water main on Windsor Street and Sanford Street. Abandonment of approximately 1,300 LF an existing 6-inch water main on the east side of Main Street, from Windsor Street to Montville Street including the transfer of 10 water services smaller than 4-inches, the transfer of 7 water services greater than 4-inches, and removal and replacement of 1 fire hydrant assembly.
Dana Chalupka 555 Main Street Hartford CT, 06103 United States Tel: 8602787850 Fax: dchalupka@themdc.com

With GovernmentContracts, you can:
...Payment Terms : Net 45 Days Who can respond to this bid ? ...
State Government of Connecticut
Bid Due: 8/12/2026
...: Free On Board Destination Payment Terms : Net 30 Days Who can ...
State Government of Connecticut
Bid Due: 8/06/2026
...Solicitation : 2P27-005 Status : Open Delivery Terms : Free On Board Destination ...
State Government of Connecticut
Bid Due: 8/07/2026
...: Net 30 Days Who can respond to this bid ? : All ...
State Government of Connecticut
Bid Due: 8/10/2026