| Location: | Missouri |
|---|---|
| Posted: | Aug 18, 2026 |
| Due: | Oct 2, 2026 |
| Agency: | Jefferson County |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
| Bid Title: |
2027 - RFQ - County Road Safety Plan
|
| Category: | Road & Bridge Projects |
| Status: | Open |
|
Jefferson County, Missouri
Maple Street Annex Dennis Gannon
725 Maple Street * PO Box 100 County Executive
Hillsboro, Missouri 63050
DEPARTMENT OF PUBLIC WORKS
Jason Jonas, P.E. - Director
Daniel Naunheim, P.E. - Deputy Director
Telephone: 636-797-5340 * Fax: 636-797-5565
Web Address: www.jeffcomo.org
Cecil Vivrett Kurt Wengert, P.E. Christina Mareschal Matt Stinchcomb Mike Cook
Highway Superintendent T e c h nical Division Manager Fleet Services Manager F a c i lity Maintenance Manager S t o rmwater Manager
636-797-5427 636-797-5570 636-797-5399 636-797-5574 636-797-6318
August 18, 2026
Dear Consultant:
The Jefferson County Department of Public Works is requesting the services of a consulting firm (or team of firms)
to perform the professional services for the project described in the attachments. Attached is a general description
of the project and services for a consulting firm to perform under this contract.
If your firm would like to be considered for these consulting services, you may express your interest by responding
to the appropriate office, which is indicated in the attachments. Limit your Letter of Interest (LOI) to no more than
ten (10) pages. This LOI should include any information which might help the County in the selection process,
such as the persons or team you would assign to the project, the backgrounds of those individuals, and other projects
your company has recently completed, or are now active, that are similar in scope, etc.
The selection committee will evaluate submittals based on: (a) experience and technical competence of project
team; (b) capacity and capability of team to take on the project; (c) past record of performance with similar
clients/projects on design scope, schedule and project estimation (reference: 23 CFR 172 Administration of
Engineering & Design Related Service Contracts and RSMO 8.285 - 8.291).
It is required that your firm's Statement of Qualification (SOQ) (RSMo 8.285 through 8.291) and an Affidavit of
Compliance with the federal work authorization program, along with a copy of your company E-Verify
Memorandum of Understanding (15 CSR 60-15.020) be submitted with your firm's LOI or be on file with the
Jefferson County Department of Public Works. The SOQ is not included as part of the LOI. Please only send one
(1) copy of your SOQ.
The County requests five (5) copies of the interested consultant team LOI. The deadline for LOIs to be received
by the County is 4:00 pm on Friday, October 2, 2026, at the Jefferson Public Works Office, 725 Maple Street,
Hillsboro, Missouri 63050. Please mark your package submittal as "2027 County Road Safety Plan RFQ".
Sincerely,
Jason Jonas, P.E., PMP
Public Works Director
Attachments
| 2027 County Road Safety Plan | |
|---|---|
| Project Funding Source: | County Road Tax |
| Project Location: | Countywide - Unincorporated |
| Project Description: | Traffic Safety Planning Study |
| Consultant Services Required: | Roadway and Planning: Consultant shall be responsible for professional engineer- ing and planning services including the preparation of a county road safety plan, data collection, roadway analysis, and general cost estimation. As part of preparing the plan, the consultant may need to perform field reviews. The plan shall include a public engagement process. Firms submit- ing qualifications should have a well-documented history of developing similar planning documents. |
| Other Comments: | Attached is a general description of the planning services being advertised in this RFQ. All consultant questions or requests for information shall be made in writing to the contact shown below. No project briefing meetings will be granted during the RFQ process. |
| Contact: | Daniel Naunheim, P.E. Public Works Deputy Director PO Box 100 Hillsboro, MO 63050 dnaunheim@jeffcomo.org |
| Submittal Deadline: | October 2, 2026, at 4:00 pm |
| Submittal Package: | Letter Of Interest (LOI) shall not exceed ten (10) pages total. A page is defined as 8-1/2 by 11 inches and printed on one side. Five (5) copies of the letter of interest should be received at the address and by the time specified. |
| Submittal Delivery: | Jefferson County Public Works Department Office 725 Maple Street, Hillsboro, Missouri 63050 Please mark your package submittal as: "2027 County Road Safety Plan RFQ" |
2027 County Road Safety Plan
Project Funding Source: County Road Tax
Project Location: Countywide - Unincorporated
Project Description: Traffic Safety Planning Study
Consultant Services Required: Roadway and Planning:
Consultant shall be responsible for professional engineer-
ing and planning services including the preparation of a
county road safety plan, data collection, roadway analysis,
and general cost estimation. As part of preparing the plan,
the consultant may need to perform field reviews. The plan
shall include a public engagement process. Firms submit-
ing qualifications should have a well-documented history
of developing similar planning documents.
Other Comments: Attached is a general description of the planning services
being advertised in this RFQ. All consultant questions or
requests for information shall be made in writing to the
contact shown below. No project briefing meetings will be
granted during the RFQ process.
Contact: Daniel Naunheim, P.E.
Public Works Deputy Director
PO Box 100
Hillsboro, MO 63050
dnaunheim@jeffcomo.org
Submittal Deadline: October 2, 2026, at 4:00 pm
Submittal Package: Letter Of Interest (LOI) shall not exceed ten (10) pages
total. A page is defined as 8-1/2 by 11 inches and printed
on one side. Five (5) copies of the letter of interest should
be received at the address and by the time specified.
Submittal Delivery: Jefferson County Public Works Department Office
725 Maple Street, Hillsboro, Missouri 63050
Please mark your package submittal as:
"2027 County Road Safety Plan RFQ"
RFQ Rating Categories: Points Available
Experience and Technical Competence of the Project Team -
* Team Members Professional Work History and Education 10 Points Maximum
* Consultant Firm History Working on Similar Projects 10 Points Maximum
* Examples of Innovative Solutions Used on Past Projects 10 Points Maximum
Subtotal = 30 Points Maximum
Capacity and Capability of Firm to Complete the Project -
* Prime Firm Capacity to Undertake the Project 10 Points Maximum
* Explaination of Proposed Subconsultants with Past Partnership History 10 Points Maximum
(if none, then prime firm will be rated out of 20 points maximum)
* Highlight Consultant Team Capabilities That Stand Out from Other Firms 10 Points Maximum
Subtotal = 30 Points Maximum
Past Record of Performance on Similar Projects -
* Meeting Design Scopes Proposed by Clients without Undo Overruns 10 Points Maximum
* Meeting Design Schedules Under Client Agreements 10 Points Maximum
* Accurate Project Cost Estimation with Examples in Full Detail 10 Points Maximum
* Client References and/or Recommendations 10 Points Maximum
Subtotal = 40 Points Maximum
Total Score = 100 Points Maximum
2027 COUNTY ROAD SAFETY PLAN:
Plan Purpose Statement
Jefferson County completed and adopted the current system-wide roadway safety plan in 2021. The County
now seeks the services of a Consultant to develop a new roadway safety plan to replace the outdated 2021
plan. The purpose of this roadway safety plan is to identify lists of priority and secondary safety locations,
projects and/or improvements based on collected and analyzed data. The final recommendations should focus
on both lower cost engineering improvement recommendations, as well as higher cost federally fundable
project opportunities. The separation between lower cost and higher cost recommendations shall be discovered
during the plan development process.
Plan Components
The plan shall include analyzing the five-year crash history between January 1, 2021 through December 31,
2025. It will also include study methodology and recommended countermeasures to reduce crashes in Jefferson
County, Missouri. All approximately 700 miles of County-owned roadways will be evaluated in this plan.
Specific countermeasures to lower the crash frequency and severity on these roadways will be identified. An
important aspect of this safety plan is the identification of low-cost countermeasures, which can be applied
widely on these corridors and others in a systemic manner to address the most crashes on Jefferson County
roadways. In cases were the addition of pavement widening, horizontal curve realignment, vertical grade
adjustments, ect. are recommended, the plan will highlight these areas with more detailed improvement
information. In all cases, the plan will provide a rough order of magnitude cost estimate and provide basic
aerial plan improvement information.
This plan seeks to provide safety solutions on both a project-specific and county-wide level. In the process of
analyzing crash data and developing countermeasures for high crash areas, common themes are likely to
emerge that can be applied on a wider level. The plan should contain strategies on how to address safety issues
commonly seen in Jefferson County. Safety improvement strategies should be applicable in use to inform
future policy and address safety concerns systematically.
Plan Public Engagement
The Consultant will develop the plan through a public engagement process. This should include seeking public
input on traffic safety concerns along the county-maintained roadway system. The engagement process should
utilize public meetings or workshops, online surveys and questionnaires, and stakeholder interviews intended
to gather public input, as well as present the draft and final versions of the plan to the public for review.
Plan Evaluation Criteria
The Consultant will develop the plan using an extensive variety of relevant data. Some of the data categories
that may be considered could include, but is not limited to, the following:
1. Vehicle crash data
2. Roadway traffic volumes
3. Planned and/or funded improvement projects
4. Roadway functional classifications
5. Roadway geometric constraints
6. Socio-economic and demographic considerations
7. Land use / economic development patterns or potential
The plan would focus exclusively on analyzing the existing County Road System; however, consideration on
how existing MoDOT or municipal routes fit into the plan could be evaluated were logical connections become
apparent. The plan would identify a rating category matrix with assigned point values, or some other scoring
system. The rating ideology will be developed between the Consultant and the County.
A method of elimination would need to be developed to bring 436 total county roads down to approximately
50 to 100 total county roads, road segments or intersection locations that become deemed priority or secondary
locations. The priority and secondary locations will be evaluated in more detail within the plan. Likely this
would involve the Consultant and Public Works Department working together in ruling out most low-volume,
short length, and dead-end routes, as well as other limiting criteria that would have likely yielded a very low
scoring potential for these excluded county roads. The rating system of the approximately 50 to 100 county
roads, road segments or intersection locations should yield priority or secondary locations that can then be
further evaluated on what traffic safety improvements may be warranted.
Masterplan Completion and Adoption
Once in the final completed form, the Consultant will assist the Department in presenting the plan to the
Jefferson County Council in a work session. The Department will then seek approval from the Council through
the adoption of a resolution. The plan would then be an officially approved public document that is ready for
priority project implementation. This plan effort, including County Council adoption, must be completed prior
to December 31, 2027.