Kiefer Landfill Groundwater Treatment Plant, Extraction Well 16 Connection

Location: California
Posted: Jul 16, 2025
Due: Aug 14, 2025
Agency: Sacramento County
Type of Government: State & Local
Category:
  • 68 - Chemicals and Chemical Products
  • F - Natural Resources and Conservation Services
Solicitation No: 4678
Publication URL: To access bid details, please log in.


Project ID: 4678

Title: Kiefer Landfill Groundwater Treatment Plant, Extraction Well 16 Connection

Addenda: 0

Release Date: 7/16/2025

Due Date: 8/14/2025

Post Information
Posted At:Wed, Jul 16, 2025 7:34 AMSealed Bid Process:Yes (Bids Sealed / Pricing Sealed)Private Bid:No
Overview
Summary

The Project includes the furnishing of labor, materials, equipment, and other incidental work as specified for the connection of groundwater extraction well EW-16 to the treatment system, as follows:

Install pump provided by DWMR, provide and install well station piping, valves, meters, electrical pedestal including VFD, and concrete well pad. Provide and install 800 ft of subsurface water pipe and gravel road to reach existing infrastructure. Provide and install approx. 2700 ft of 4-wire power cable in new and existing conduits. Install PLC and radio communications components provided by DWMR.

Background

Sacramento County Department of Waste Management & Recycling (DWMR) Kiefer Landfill Groundwater Treatment Plant (KTP), located across Kiefer Blvd from the landfill, includes 15 extraction wells connected to a treatment facility.

E xtraction well EW-16 was drilled and constructed in 2024, but requires pump installation and connection to the existing treatment network, near its southwestern edge at extraction well EW-9. An addendum to the Kiefer expansion EIR, PLER2024-00046 was issued for this project in 2024 by the County of Sacramento Office of Planning and Environmental Review, with a finding of no substantial impact. Biological species surveys of the well site and proposed pipeline were conducted in 2024. A South Sacramento Habitat Conservation Plan permit authorization, SHCP 2024-0010, was issued in 2024. An addendum to this authorization was issued in 2025 to add a gravel road to the well site.

Timeline
Release Project Date:
July 16, 2025
Pre-Bid Meeting (Non-Mandatory):
July 29, 2025, 10:00am
Kiefer Landfill Engineering Building, 12701 Kiefer Blvd, Sloughhouse CA 95683
Question Submission Deadline:
August 4, 2025, 6:00pm
Question Response Deadline:
August 11, 2025, 2:00pm
Bid Submission Deadline:
August 14, 2025, 2:00pm
Bid Opening:
August 14, 2025, 2:00pm
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...approximately 80 percent of Zone 7's water supply, with the remainder coming from ...

Zone 7 Water Agency

Bid Due: 6/18/2026

..., treating, or stabilizing hazardous substances. * Groundwater Remediation: Treating contaminated... groundwater to ...

Humboldt County

Bid Due: 7/19/2026

...Repairs,Water Service Maintenance,Water Supply, Groundwater, WWTP, Equip.,Waterworks Installation Bid... Maintenance, Water Supply, Groundwater, ...

City of Glendora

Bid Due: 7/02/2026

...percent groundwater produced from District-owned and operated wells. The District provides water...

Mission Springs Water District

Bid Due: 6/12/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.