| Location: | New Jersey |
|---|---|
| Posted: | Mar 23, 2026 |
| Due: | May 1, 2026 |
| Agency: | Atlantic County Utilities Authority |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: Underwater Investigation of the ACUA Ocean Outfall Pipe
Addenda: 0
Release Date: 3/23/2026
Due Date: 5/1/2026
The Atlantic County Utilities Authority (ACUA) is requesting proposals to perform an underwater inspection and report of the ACUA’s Ocean Outfall force main to verify the condition of the exposed piping. A report, along with video documentation, shall depict any evidence of flow restriction, leaks, degradation of pipe weighting, compromise in the cathodic protection system or corrosion of exposed steel structures. The inspection shall be conducted in accordance with standards of the American Society of Civil Engineers Waterfront Facilities Inspection and Assessment Manual No. 130. Percent cleaning shall be as required for a level II, routine inspection.
The Atlantic County Utilities Authority (ACUA) owns and operates a Solid Waste complex in Egg Harbor Township, Atlantic County, NJ, known as the Howard F. Haneman Environmental Park, and a Wastewater Treatment Facility in Atlantic City, Atlantic County, NJ, known as City Island Treatment Plant.
The Solid Waste facility is home to an active landfill, a recycling center, composting site, and ancillary facilities. Also on site is the ACUA’s primary administration building, constructed in 1992, which features a closed-loop geothermal HVAC system. The site is home to a 5.4 MW landfill methane gas to electricity project which provides 100% of the power needs of the Park. The ACUA’s solid waste complex is located at 6700 Delilah Road, in Egg Harbor Township, New Jersey. The site consists of approximately 360 acres with approximately 102 acres representing the landfill footprint.
The Wastewater Treatment Facility has been in operation since 1978 and services 14 communities in Atlantic County. It is home to the Jersey-Atlantic Wind Farm, a 7.5 MW wind farm that is privately owned and from which the ACUA purchases approximately 12 million kWh per year of electricity. In addition, the facility also houses a 500 kW solar PV system.
The ACUA is responsible to the residents of Atlantic County to be financially prudent and environmentally responsible.

With GovernmentContracts, you can:
...Project ID: Title: Microbiological Wastewater Additives Addenda: 2 Release Date: 5/5/2026 Due Date...: ...
TownShip of Wayne
Bid Due: 6/09/2026
...New Dates for questions_0001-IMPROVEMENTS TO MELODY, MIDDLETON & ELKTON WASTEWATER PUMP STATIONS...
Township of Hamilton
Bid Due: 6/02/2026
...MOTORS - REPAIR AND REPLACEMENT AND INSTALLATION FOR A ONE (1) YEAR PERIOD ...
Passaic Valley Sewerage Commission
Bid Due: 6/23/2026
.... S340898-07 HAMILTON TOWNSHIP IMPROVEMENTS TO MELODY, MIDDLETON, AND ELKTON WASTEWATER PUMP STATIONS... ...
Township of Hamilton
Bid Due: 6/02/2026