| Location: | Georgia |
|---|---|
| Posted: | Jan 7, 2026 |
| Due: | Feb 11, 2026 |
| Agency: | County of Glynn |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | IFB26-025 |
| Publication URL: | To access bid details, please log in. |
Project ID: IFB26-025
Title: Old Jesup Road Drainage Improvement Project
Addenda: 0
Release Date: 1/7/2026
Due Date: 2/11/2026
This is an invitation to submit a bid to the Glynn County Board of Commissioners for the Old Jesup Road Drainage Improvement project. The successful bidder shall provide all skill, labor, material and equipment for the removal of the existing 6'x 2.5 box culvert and associated Storm pipe at Old Jesup Rd and the installation of a double run of 48 inch concrete RCP Class III pipe with associated head walls as indicated in the construction plans attached herein.
The work to be performed under this contract includes, but is not limited to, the following items: Road cut and removal of existing asphalt and 12" concrete road base, Removal of the existing box culvert and storm system and the installation of approximately 64 linear feet of 48-inch Class III RCP storm pipe and installation of Headwalls, Traffic control and maintenance of traffic in accordance with approved traffic control plans, dewatering operations as required to facilitate construction, backfilling, compaction, grading, and restoration of disturbed areas, borrow material placement and grading, as necessary, Storm drainage and structure installation, bypass pumping if necessary to prevent flooding upstream. Erosion and sedimentation control measures, grassing and final site stabilization.
All work shall be performed in strict accordance with: Construction plans and drawings, Technical specifications, Special provisions, and scope of work.
The existing storm system located under Old Jesup Road Approximately 250 feet NW of Callaway Court Was installed at the incorrect height and causes flooding upstream of this location. This project we will remove inadequate drainage infrastructure and replace the crossing with a double run A 48 inch RCP installed at the proper Elevation to facilitate positive drainage of the outfall ditch through this crossing.

With GovernmentContracts, you can:
...to outlet control structure, concrete retaining wall construction, demolition of raw water tower... ...
State Government of Georgia
Bid Due: 6/23/2026
...Type: county Fiscal Year: 2026 Agency Site: Link Description The construction of the ...
State Government of Georgia
Bid Due: 6/11/2026
..., prior to the demolition/construction work. * Existing monolithic concrete slab foundation shall... ...
Troup County
Bid Due: 6/09/2026
...monolithic concrete slab foundation shall be protected during demolition/construction work and remain... complete ...
Troup County
Bid Due: 6/09/2026