| Location: | Ohio |
|---|---|
| Posted: | Feb 26, 2026 |
| Due: | Mar 13, 2026 |
| Agency: | State Government of Ohio |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | SRC0000037209 |
| Publication URL: | To access bid details, please log in. |
| Solicitation ID: | SRC0000037209 |
| Solicitation Name: | REPOST | Evaluation/Consultant RAD Heat Ball Valve Replacement | BWC260596 | FY26 | JD |
| Original Begin Date: | 2/26/2026 1:40:18 PM |
| Begin Date: | 2/26/2026 1:40:18 PM |
| End Date: | 3/13/2026 3:00:00 PM |
| Inquiry End Date: | 3/10/2026 3:00:00 PM |
| Commodity: | Heating and ventilation and air circulation |
| MBE Set Aside: | MBE Set Aside |
| Agency: | BWC300810 FACILITIES WGBL |
| Solicitation Status: | Open for Bidding |
| Solicitation Type: | Quick Quote |
|
In an MBE set-aside solicitation, only those bidders/suppliers with an active MBE certification at the time the solicitation closes can submit a response
|
|||
|
Solicitation ID
SRC0000037209
|
|||
|
Solicitation Name
REPOST | Evaluation/Consultant RAD Heat Ball Valve Replacement | BWC260596 | FY26 | JD
|
RFx Type
Quick Quote
|
||
|
Lot #
1
|
Solicitation Status
Open for Bidding
|
||
|
Round #
1
|
MBE Set Aside
|
||
|
Begin Date
2/26/2026 1:40:18 PM (ET)
|
Amendment?
|
||
|
End Date
3/13/2026 3:00:00 PM (ET)
|
Inquiry End Date
3/10/2026 3:00:00 PM
|
||
|
Summary
**REPOSTED DUE TO CLARIFICATION OF SOW (STATEMENT OF WORK)
A MANDATORY site visit will be conducted at:
|
Predecessor Contract
|
||
|
Process
Selection based on Statement of Work and BWC needs. |
|||
|
Ship To
|
|||
1 Record(s)
|
0 Record(s)
|
5 Record(s)
|
RAD System Evaluation and Pipe Condition Assessment
1. Project Overview
This project aims to evaluate the existing RAD (Radiator) system and provide recommendations and design for system improvements. The evaluation will include a condition assessment, identification of deficiencies, and development of solution options with cost estimates. Once reviewed by Owner, this evaluation will be followed by design services for implementation. Key focus areas include valve replacement, water balancing, and improved zoning.
2. Objectives
• Assess the current condition and performance of the RAD system.
• Identify operational or maintenance issues.
• Evaluate the need for new valves, water balancing, and zoning improvements.
• Provide recommendations and cost estimates for system upgrades.
• COMPLETE pipe thickness testing USING a third-party vendor.
3. Consultant Responsibilities
3.1 RAD System Evaluation
• Review existing documentation, drawings, and maintenance records.
• Conduct site visits to inspect system components.
• Interview facility staff to understand operational concerns.
• Evaluate system performance, flow, and temperature control.
• Identify visible signs of corrosion, leakage, or inefficiencies.
3.2 System Upgrade Recommendations
• Assess the condition and functionality of existing valves.
• Evaluate the current water balance and zoning layout.
• Recommend replacement of outdated or non-functioning valves.
• Develop a comprehensive water balancing strategy.
• Propose zoning improvements to enhance system efficiency and occupant comfort.
• Provide at least two solution options (e.g., partial vs. full upgrade) with pros/cons and lifecycle considerations.
3.3 Pipe Thickness Testing
• Assist in defining the scope and locations for pipe thickness testing.
• Coordinate with a third-party testing firm
• Review and interpret the testing results as part of the final report.
• Consultant will subcontract testing services and interpret results.
5. Deliverables
• Site visit summary and system condition report.
• Pipe testing coordination plan and summary of results.
• Final report with recommendations and cost estimates.
• Presentation of findings to client stakeholders.
7. Required Schedule
• Project Kickoff: March 2026
• Site Visits: March 2026
• Draft Report: May 1, 2026
• Final Report: May 15, 2026
8. Cost Breakdown – REQUIRED WITH BID SUBMISSION
All costs shall be part of the bid, no “costs to be determined later” will be accepted.
Bid shall be firm and final.
|
Category |
Cost |
|
Labor |
|
|
Materials |
|
|
Testing Services |
|
|
Contingency |
|
|
Grand Total |

With GovernmentContracts, you can:
...Solicitation ID: SRC0000039409 Solicitation Name: Timber Stand Improvement (TSI) Original Begin... Solicitation Name ...
State Government of Ohio
Bid Due: 6/08/2026
...of Health Improvement and Wellness-SFY27-Behavioral Health and Nicotine Use Treatment Original Begin Date...-DOH61028-Bureau ...
State Government of Ohio
Bid Due: 6/17/2026
...rates on Public Improvements in Allen County and the City of Lima, Ohio ...
City of Lima
Bid Due: 6/05/2026
...Bid Number: 2026-1 Bid Title: CMaR: Flood Mitigation & Plaza Improvements of Creekside... ...
City of Gahanna
Bid Due: 6/12/2026