| Location: | Utah |
|---|---|
| Posted: | Feb 26, 2026 |
| Due: | Mar 17, 2026 |
| Agency: | State Government of Utah |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | N/A |
| Publication URL: | To access bid details, please log in. |
Project Description: The work to be performed generally consists of pulverizing the existing pavement section, excavation, grading, asphalt paving and removal and replacement of existing curb, gutter, sidewalk, drive approaches, and storm drain pipe and inlets at several locations in Bountiful.

With GovernmentContracts, you can:
...feet of piping from existing chamber to new structure, including excavation, de-watering, disposal...
State Government of Utah
Bid Due: 9/28/2026
..., equipment, transportation, hoisting, excavation, electrical work, permits, inspections, testing, site...
State Government of Utah
Bid Due: 9/25/2026
...beneath Mountain View Corridor (State Route 85); excavation, construction, and backfilling of launch...
State Government of Utah
Bid Due: 10/13/2026