| Location: | Utah |
|---|---|
| Posted: | Feb 26, 2026 |
| Due: | Mar 17, 2026 |
| Agency: | State Government of Utah |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | N/A |
| Publication URL: | To access bid details, please log in. |
Project Description: The work to be performed generally consists of pulverizing the existing pavement section, excavation, grading, asphalt paving and removal and replacement of existing curb, gutter, sidewalk, drive approaches, and storm drain pipe and inlets at several locations in Bountiful.

With GovernmentContracts, you can:
...drain pipes, saw-cut and removal of asphalt, installation of storm drain catch basin, ...
State Government of Utah
Bid Due: 11/19/2026
...includes the replacement of 4" asbestos cement pipe (abandoned in place) with 4" ...
AGRICULTURE, DEPARTMENT OF
Bid Due: 11/21/2027
...of Performance: UT 84078 USA Description This project includes the replacement of 4" ...
AGRICULTURE, DEPARTMENT OF
Bid Due: 11/21/2026
...of Performance: UT 84078 USA Description This project includes the replacement of 4" ...
AGRICULTURE, DEPARTMENT OF
Bid Due: 12/01/2026