NORTHFIELD-WILLIAMSTOWN STP SURF(76) & RANDOLPH STP SURF(78)

Location: Vermont
Posted: Nov 2, 2026
Due: Nov 6, 2026
Agency: State of Vermont - Agency of Transportation
Type of Government: State & Local
Category:
  • 66 - Instruments and Laboratory Equipment
Solicitation No: C03156
Publication URL: To access bid details, please log in.
CONSTRUCTION ADVERTISEMENTS QUESTIONS DUE PRIOR TO 4:30 PM ADDENDA BID OPENING

C03156

NORTHFIELD-WILLIAMSTOWN STP SURF(76) & RANDOLPH STP SURF(78)

PROPOSAL

TMP Checklist - 21v228
TMP Checklist - 21v219
APPROVED BIDDERS LIST

PLAN HOLDERS LIST

DOWNLOAD PLANS IN iCX

10/28/2026

Addendum #1 11/6/2026

Attachment Preview

VTransMissionandVision
Throughexcellentcustomerservice,provideforthesafeandefficientmovementofpeopleandgoods.

VERMONT CA-96
Contract Number: C03156
Contract Name: NORTHFIELD-WILLIAMSTOWN STP SURF(76) & RANDOLPH STP
SURF(78)
VERMONT
AGENCYOFTRANSPORTATION
PROPOSAL
STANDARDSPECIFICATIONSFORCONSTRUCTION
DATED2024SHALLAPPLYTOTHISCONTRACT
SPECIALPROVISIONS
SCHEDULEOFITEMS
ELECTRONICBIDBONDtobesubmittedintheamountof5%oftheContractor'sbid.
BIDDINGPROCEDURE
Bid Proposals will not be read unless accompanied by an electronic bid bond, and they may be rejected as
irregulariftheyarenotincompliancewithAgencyspecifications.
NOTE: All bid proposals shall be properly filled out and submitted electronically utilizing iCX Web
Systemservices.
VTransMissionandVision
Throughexcellentcustomerservice,provideforthesafeandefficientmovementofpeopleandgoods.
Asafe,reliable,andmultimodaltransportationsystemthatgrowstheeconomy,isaffordabletouseand
operate,andservesvulnerablepopulations.

Cover Page Proposal ____________________________________________________________ 1
Table of Contents _______________________________________________________________ 2
Project Special Provisions ________________________________________________________ 3
406-0004 BITUMINOUS CONCRETE PAVEMENT, THIN OVERLAY ___________________14
Required Contract Provisions for Federal Aid Construction Contracts FHWA 1273 June 2026 __ 30
USDOL Davis Bacon Wage Rates 2026 - Orange County _______________________________ 42
USDOL Davis Bacon Wage Rates 2026 - Washington County ____________________________46
Bidding Requirements and Conditions ______________________________________________ 50
DBE Policy Required Contract Requirements CR110 - 2026 _____________________________ 62
Attachment C - Standard State Contract and Grant Provisions Rev 2-13-26 _________________ 67
USDOT Standard Title VI Nondiscrim Assurances Appendix A and E _____________________ 77
Standard Federal EEO Construction Contract Specifications _____________________________ 80
Contractor EEO Certification Form - CA109 _________________________________________ 87
Vermont AOT Certificate of Compliance - CA271 _____________________________________ 88
Vermont AOT Minimum Labor and Truck Rates - CA101 _______________________________ 92
Commodity Index Prices CA170 - Spec Book 2024 ____________________________________ 93
Proposal Schedule of Pay Items ____________________________________________________ 94

Northfield-Williamstown STP SURF(76) & Randolph STP SURF(78) Advertised October 14, 2026
PIN Number(s): 21v228 & 21v219 Page 1
Special Provisions - Notices to Bidders
SPECIAL PROVISIONS
1. NOTICE TO BIDDERS - CONTRACT COMPLETION DATE. This Contract shall be completed
on or before October 15, 2027.
2. NOTICE TO BIDDERS - PROHIBITION OF RUSSIAN GOODS. The Contractor is hereby
notified that, pursuant to Vermont Executive Order No. 02-22, dated March 3rd, 2022, the
purchase of Russian-sourced goods and goods produced by Russian entities (defined as institutions
or companies that are headquartered in Russia or have their principal place of business in Russia)
is prohibited. The awarded Contractor must fill out and sign the Executive Order 02-22 Vendor
Certification as part of Contract awarding process.
3. NOTICE TO BIDDERS - WORK REQUIREMENTS. The Contractor is hereby notified that no
work shall be performed from mile marker (MM) 1.900 to mile marker (MM) 3.350 on VT Route
66 within the Town of Randolph between the hours of 7:15 a.m. to 8:15 a.m. and from 4:15 p.m.
to 5:15 p.m.
4. NOTICE TO BIDDERS - ELECTRONIC DOCUMENT MANAGEMENT. The Contractor is
hereby notified that the Contractor, their subcontractors, and suppliers shall create both a Doc
Express and an iCXWeb account. The Contractor shall use these applications for collection and
management of electronic documents. Doc Express can be accessed at the following link:
https://docexpress.com. iCXWeb can be accessed at the following link:
vtrans.exevision.com/icx/Index.aspx.
All costs associated with the use of Doc Express and iCXWeb will be considered incidental to
Item 635.1100, Mobilization/Demobilization. The State will manage the applications including
Contract setup upon Contract execution.
To create an account and for more information regarding the use of Doc Express see the
information at the following link:
https://outside.vermont.gov/agency/vtrans/external/docs/construction/Contracting/DocExpressOv
erviewforContractors.docx.
To create an account and for more information regarding the use of iCXWeb see the information
at the following link: https://vtrans.vermont.gov/icx.

Northfield-Williamstown STP SURF(76) Advertised October 14, 2026
& Randolph STP SURF(78) Page 2
5. NOTICE TO BIDDERS - ELECTRONIC TICKETING VTRANS PORTAL. The Contractor
is hereby notified that the Contractor, their subcontractors, and suppliers shall connect to the
VTrans Portal and use the application for distribution and management of electronic tickets (e-
tickets). VTrans Portal is a state cloud-based e-ticket database, including a web-based user
interface and a jobsite mobile e-ticket application. VTrans Portal will interface with the
Contractor's supplier existing point of sales or e-ticketing platform and will allow VTrans to
manage bituminous material e-tickets.
All costs associated with the use of VTrans Portal will be considered incidental to the appropriate
Section 406 and Section 407 pay items. The Agency will manage the VTrans Portal application
including Contract setup upon Contract execution.
To create an account, connect to the VTrans Portal, and for more information regarding the use of
VTrans Portal see the information at the following link: https://www.haulhub.com/vermont-
agency-transport-22/
6. NOTICE TO BIDDERS - CONTACT WITH THE AGENCY. From the time of advertising until
the actual bid opening for this Contract, all prospective Contractors, subcontractors, and suppliers
shall direct all inquiries related to this Contract solely to the Agency's Contract Administration
Section at AOT.ConstructionContractingInquiry@vermont.gov.
The deadline for submitting inquiries related to this Contract is 4:30 p.m. Eastern Time on October
28, 2026. Inquiries received prior to this time will receive a response from the Agency. Inquiries
received after this time may receive a response at the Agency's discretion.
7. NOTICE TO BIDDERS - OTHER SPECIFICATIONS AND CONTRACT REQUIREMENTS.
FHWA 1273 - Required Contract Provisions for Federal Aid Construction Contracts
USDOL Davis Bacon Wage Rates by County
Vermont Agency of Transportation Bidding Requirements and Conditions
Disadvantaged Business Enterprise (DBE) Policy Contract Requirements - CR-110
Attachment C - Standard State Provisions for Contracts and Grants
USDOT Standard Title VI Nondiscrimination Assurances Appendices A, E
Standard Federal Equal Employee Opportunity (EEO) Construction Contract Specifications CA26
Contractor Equal Employment Opportunity (EEO) Certification Form - CA109
Vermont Agency of Transportation Certificate of Compliance - CA271
Vermont Agency of Transportation Minimum Labor and Truck Rates - CA101
Commodity Index Prices - CA170
Schedule of Pay Items

NOTICE TO BIDDERS - GENERAL SPECIAL PROVISIONS. The Contractor is hereby
notified that the most recent General Special Provisions in effect on the date of advertisement shall
apply to this Contract. The General Special Provisions may be found at the following address:
https://vtrans.vermont.gov/highway/construct-material/construct-services/pre-
contractspecifications/vermont/2024

Northfield-Williamstown STP SURF(76) Advertised October 14, 2026
& Randolph STP SURF(78) Page 3
8. NOTICE TO BIDDERS - NEW PREQUALIFICATION FORM. The Contractor is hereby
notified that the Agency is required by the U.S. Department of Transportation to develop and
maintain a list of information about all firms that bid on federally funded Contracts in accordance
with 49 C.F.R. 26.11. The Agency has developed a new electronic form to collect this
information. The Contractor shall fill out this form as part of their project-specific prequalification
for every Contract that they bid on. A link to this form is provided in the prequalification form
available through iCX and the Agency's website.
9. NOTICE TO BIDDERS - DAVIS-BACON. U.S. Department of Labor Davis-Bacon wage rates
are applicable to this Contract. Copies of the applicable rates are included in this proposal.
10. NOTICE TO BIDDERS - GENERAL SPECIAL PROVISIONS. The Contractor is hereby
notified that the most recent General Special Provisions in effect on the date of advertisement shall
apply to this Contract. The General Special Provisions may be found at the following address:
https://vtrans.vermont.gov/highway/construct-material/construct-services/pre-
contractspecifications/vermont/2024
11. NOTICE TO BIDDERS - STANDARD DRAWINGS. The Vermont Agency of Transportation
Standard Drawings listed on the Index of Sheets are not included in the plan set, but may be found
at the following address:
https://resources.vtrans.vermont.gov/resources/cadd/VAOTconSTD_Name.xml?_gl=1*6cpy62*
_ga*MTU5MTQ3NTcyNi4xNzIwMjM5NjI0*_ga_V9WQH77KLW*czE3NTI3NTYyMzQkbzE
3NCRnMSR0MTc1Mjc1NjkwMyRqNjAkbDAkaDA.
12. NOTICE TO BIDDERS - INFORMATIONAL DOCUMENTS. The Contractor is hereby notified
that the following informational documents for this Contract are available on iCXWeb and the
VTrans Bid Opportunities website. These documents are being provided during the bid solicitation
period for informational purposes only.
(a) Traffic Management Plan (TMP) Checklist - Northfield-Williamstown STP SURF(76)
(b) Traffic Management Plan (TMP) Checklist - Randolph STP SURF(78)
13. NOTICE TO BIDDERS - SURFACE WATER WITHDRAWAL. The Contractor is hereby
notified that the Vermont state law, Act 135 of 2022, requires any person withdrawing surface
water (as defined in 10 V.S.A. 1002 (20)) to register with and report the water withdrawal and
usage to the Vermont Department of Environmental Conservation beginning January 1, 2023.
Guidance can be found here: https://dec.vermont.gov/watershed/rivers/streamflow-protection/act-
135-surface-water-withdrawal-registration-and-reporting

Northfield-Williamstown STP SURF(76) Advertised October 14, 2026
& Randolph STP SURF(78) Page 4
14. NOTICE TO BIDDERS - ENVIRONMENTAL COMMITMENTS.
(a) Threatened, Endangered, and Rare Species. The Contractor shall ensure all personnel
working on the project site are made aware of the potential presence and protected status
of the northern long-eared bat and the tricolored bat. No suitable bat habitat is present
within the project limits and no Time-of-Year (TOY) restrictions are required.
The Contractor is hereby made aware of the potential for TOY restrictions related to
proposed Waste, Borrow and Staging areas. Cutting trees >3 inches in diameter outside
of the contract project limits shall require review under Section 105.25 Opening Off-Site
Activity Areas.
(b) Invasive Material. If invasive species are delineated on the Plans or found in the project
area and confirmed by the Engineer, the invasive species, and any soil excavated from
areas that contained the invasive species, will be termed invasive material.
The Contractor shall handle the invasive material in accordance with the VTrans State
Highway System Roadside Terrestrial Invasive Plants Best Management Practices
(BMPs). The Contractor shall stockpile the invasive material separately from other soil
stockpile areas. A ground barrier and perimeter containment system shall be in place
around the area intended for stockpiling the invasive material. Equipment shall be cleaned
of all soil and plant matter prior to arriving on site in accordance with Subsection 107.06.
The equipment used for excavation and transport of invasive material shall be cleaned of
all soil and plant matter before being used for work in other areas in accordance with the
BMPs.
To the extent possible, invasive material shall be reused on site. Invasive material shall
only be reused on site in areas where the presence of the invasive species were clearly
evident. If there is an excess of invasive material, it shall be wasted in accordance with the
BMPs.
The cost of excavating invasive material will be paid for under the appropriate Contract
excavation items. When invasive species are delineated on the Plans, the additional cost
for handling invasive material, following the BMPs, cleaning equipment, and wasting
excess invasive material will be incidental to all other Contract items. When invasive
species are not delineated on the Plans, and compensation is not otherwise provided for in
the Contract, the work of handling invasive material, following the BMPs, cleaning
equipment, and wasting excess invasive material will be considered extra work in
accordance with Subsection 104.03 and will be paid for in accordance with Subsection
109.06.

Northfield-Williamstown STP SURF(76) Advertised October 14, 2026
& Randolph STP SURF(78) Page 5
15. NOTICE TO BIDDERS - UTILITIES - NORTHFIELD-WILLIAMSTOWN STP SURF(76).
Existing aerial facilities owned by Washington Electric Cooperative, Consolidated
Communications, and TDS Telecom will not require adjustment. The Contractor is cautioned to
protect these facilities from damage.
Existing underground facilities owned by Washington Electric Cooperative and Consolidated
Communications will not require adjustment. The Contractor is cautioned to protect these facilities
from damage.
Contacts for the above listed companies are as follows:
Washington Electric Co-op Brian Wilkin (802) 224-2319
Consolidated Communications Travis Andrews (802) 735-4874
TDS Telecom Aaron Diers (603) 848-7822
Employees or agents of the companies are to be allowed free and full access within the project
limits with the tools, materials, and equipment necessary to install, operate, maintain, place,
replace, relocate, and remove their facilities.
There will be no extra compensation paid to the Contractor for any inconvenience caused by
working around and with the companies, or their facilities. Should the Contractor desire additional
adjustments of the utility facilities for his/her convenience, proper arrangements shall be made in
conformance with Subsection 105.09.
There are areas of underground utilities that may require additional locating beyond normal Dig
Safe measures. The Contractor is advised that exploratory excavation to locate existing
underground facilities may be necessary to protect these facilities from damage. Where approved
by the Engineer, these utilities shall be located and/or exposed by methods such as air/vacuum
excavation and/or hand digging to determine their exact location. This exploratory work shall be
classified as Trench Excavation of Earth, Exploratory and payment shall be through Pay Item
204.2200, Trench Excavation of Earth, Exploratory (N.A.B.I.).
The Contractor shall notify aerial utility pole owner if excavation will be within 10 feet of an
existing pole or anchor. That pole owner may choose to be onsite for this activity. There will be
no excavation allowed within 5 feet of existing poles and anchoring.
Vermont Statutes Annotated, Title 30, Chapter 86 ("Dig Safe") requires notice to Dig Safe before
starting excavation activities. The Contractor must telephone Dig Safe at 811 at least 72 hours
(excluding Saturdays, Sundays and legal holidays) before, but not more than 30 days before,
starting excavation activities at any location. In addition, before excavation and/or pavement
grinding in or on the state highway right-of-way, the Contractor must contact the Agency's Traffic
Signal Superintendent, Dan Ertel, to obtain/verify the location of Agency's underground utility
facilities or to confirm the absence of such facilities. Dan can be reached at (802) 343-2188.

Northfield-Williamstown STP SURF(76) Advertised October 14, 2026
& Randolph STP SURF(78) Page 6
The Contractor is advised that many towns are not members of Dig Safe. It is the Contractor's
responsibility to check with towns prior to excavation and shall protect and restore utilities
damaged within the project and as set forth in Subsection 107.12.
All Contractors, subcontractors or material suppliers involved in any project-related activity shall
comply with all applicable codes and regulations related to working around live electrical lines;
including, but not limited to maintaining the required minimum clear distance from an electrical
utility facility. The Contractor's Competent Safety Officer shall be well versed in OSHA and
VOSHA regulations, and shall be capable of implementing a plan to conform to these regulations
during prosecution of work.
16. NOTICE TO BIDDERS - UTILITIES - RANDOLPH STP SURF(78). Existing aerial facilities
owned by Green Mountain Power Corporation, Comcast Communication, FirstLight Fiber, and
Consolidated Communications will not require adjustment. The Contractor is cautioned to protect
these facilities from damage.
Existing underground facilities owned by the Town of Randolph, Green Mountain Power
Corporation, Comcast Communication, and Consolidated Communications will not require
adjustment. The Contractor is cautioned to protect these facilities from damage.
It is not anticipated that rim adjustments will need to be made to the sewer manholes or the water
valves owned by the Town of Randolph.
Contacts for the above listed companies are as follows:
Green Mountain Power Corp Ian Treadway (802) 353-5079
Consolidated Communications Tucker Peterson (802) 735-7550
FirstLight Fiber Bill Gray (802) 373-4319
Comcast Communications Bruce Bowser (802) 316-9324
Town of Randolph Christopher Chambers (802) 728-9079
Employees or agents of the companies are to be allowed free and full access within the project
limits with the tools, materials, and equipment necessary to install, operate, maintain, place,
replace, relocate, and remove their facilities.
There will be no extra compensation paid to the Contractor for any inconvenience caused by
working around and with the companies, or their facilities. Should the Contractor desire additional
adjustments of the utility facilities for his/her convenience, proper arrangements shall be made in
conformance with Subsection 105.09.

Project Contractor Anticipated Contract
Completion Date
Randolph STP PC26(3) Pending Fall 2027

Northfield-Williamstown STP SURF(76) Advertised October 14, 2026
& Randolph STP SURF(78) Page 7
There are areas of underground utilities that may require additional locating beyond normal Dig
Safe measures. The Contractor is advised that exploratory excavation to locate existing
underground facilities may be necessary to protect these facilities from damage. Where approved
by the Engineer, these utilities shall be located and/or exposed by methods such as air/vacuum
excavation and/or hand digging to determine their exact location. This exploratory work shall be
classified as Trench Excavation of Earth, Exploratory and payment shall be through Pay Item
204.2200, Trench Excavation of Earth, Exploratory (N.A.B.I.).
The Contractor shall notify aerial utility pole owner if excavation will be within 10 feet of an
existing pole or anchor. That pole owner may choose to be onsite for this activity. There will be
no excavation allowed within 5 feet of existing poles and anchoring.
Vermont Statutes Annotated, Title 30, Chapter 86 ("Dig Safe") requires notice to Dig Safe before
starting excavation activities. The Contractor must telephone Dig Safe at 811 at least 72 hours
(excluding Saturdays, Sundays and legal holidays) before, but not more than 30 days before,
starting excavation activities at any location. In addition, before excavation and/or pavement
grinding in or on the state highway right-of-way, the Contractor must contact the Agency's Traffic
Signal Superintendent, Dan Ertel, to obtain/verify the location of Agency's underground utility
facilities or to confirm the absence of such facilities. Dan can be reached at (802) 343-2188.
The Contractor is advised that many towns are not members of Dig Safe. It is the Contractor's
responsibility to check with towns prior to excavation and shall protect and restore utilities
damaged within the project and as set forth in Subsection 107.12.
All Contractors, subcontractors or material suppliers involved in any project-related activity shall
comply with all applicable codes and regulations related to working around live electrical lines;
including, but not limited to maintaining the required minimum clear distance from an electrical
utility facility. The Contractor's Competent Safety Officer shall be well versed in OSHA and
VOSHA regulations, and shall be capable of implementing a plan to conform to these regulations
during prosecution of work.
17. NOTICE TO BIDDERS - CONCURRENT CONSTRUCTION. The Contractor is made aware of
the following VTrans construction project(s) which are expected to be in progress within the area
of this project during its construction.
TABLE 1 - CONCURRENT CONSTRUCTION PROJECTS
Anticipated Contract
Project Contractor
Completion Date
Randolph STP PC26(3) Pending Fall 2027
This list is not all-inclusive and it is possible there may be other VTrans, municipal, or private
construction projects within the area of this project during its construction.

Northfield-Williamstown STP SURF(76) Advertised October 14, 2026
& Randolph STP SURF(78) Page 8
The Contractor shall coordinate construction schedules and traffic control with the work required
for these projects.
There will be no extra compensation paid to the Contractor for any inconvenience caused by
working around these or other projects.
18. NOTICE TO BIDDERS - SALVAGED MATERIALS. The Contractor is hereby notified that 500
tons of bituminous millings shall remain the property of the State.
All costs for loading and delivering these salvaged materials will be incidental to Contract Item
210.1200 Fine-Milling, Bituminous Pavement. The Contractor shall load 500 tons of bituminous
millings on to suitable transport and deliver to the I-89 NB closed Rest Area MM 34.3 Randolph,
VT 05060.
The Contractor shall contact Shannon Gilbert, District 4 General Manager, Tel.:(802)338-5083 a
minimum of two (2) weeks prior to beginning delivery to the designated location.
19. NOTICE TO BIDDERS - SPECIAL CONSTRUCTION REQUIREMENTS.
(a) The Contractor shall maintain a safe access to all ramps and U-turns at all times during the
construction of this project.
(b) During construction it will be necessary for the Contractor to maintain one-lane traffic for
extended periods of time. In no case shall the paved width for this one-lane traffic,
including shoulders, be reduced to less than 12 feet. This paved width shall remain free of
obstructions and obstacles at all times.
(c) The Contractor shall position Portable Changeable Message Signs at locations determined
by the Engineer properly warning motorists of the roadway conditions ahead. As directed
by the Engineer, these locations may change during construction as needs arise based on
daily work activities. The message to be displayed shall be submitted to the Engineer in
advance for approval. The displayed message should accurately reflect what motorists can
expect to encounter through the project area. The cost of providing the Portable Changeable
Message Signs shall be paid for under Contract item 641.1500 or 641.1700. The Contractor
shall also install and maintain appropriate construction signing warning the traveling public
of the expected roadway surface conditions.
(d) Prior to final acceptance of the project, all drop inlets and bridge joints within the project
limits shall be cleaned and all material within the drop inlets and bridge joints shall be
removed. All paved areas adjacent to curbs shall be swept and cleaned of all extraneous
material. Costs for this work will not be paid for directly, but will be considered incidental
to all Contract items.

This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Follow Construction Services for Richford LPOE, Vermont Active Contract Opportunity Notice ID... - ...

GENERAL SERVICES ADMINISTRATION

Bid Due: 12/24/2026

...Construction Management Services for a New Public Works Facility Request Date: 11/16/2026 3:02:03... ...

State Government of Vermont

Bid Due: 12/18/2026

...: Bridge Repair and Construction Bid Description: REMOVAL AND REPLACEMENT OF EXISTING STEEL.../bids-requests/construction-contracting ...

State Government of Vermont

Bid Due: 12/04/2026

...: Bennington Keywords: Bridge Repair and Construction Bid Description: Replacement of existing bridge.../bids-requests/construction-contracting ...

State Government of Vermont

Bid Due: 11/20/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.