| Location: | Federal |
|---|---|
| Posted: | Sep 2, 2025 |
| Due: | Sep 18, 2025 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | W912PF25QA092 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
Amendment 0003
THE PURPOSE OF THIS AMENDMENT IS TO:
1. REVISE ADDENDUM TO FAR 52.212-1, GENERAL INSTRUCTIONS, SECTION (A), PARAGRAPH (8)
2. REVISE ADDENDUM TO FAR 52.212-1, VOLUME CONTENT, VOLUME I, PARAGRAPH (E)
Amendment 0002
THE PURPOSE OF THIS AMENDMENT IS TO:
1. REVISE ADDENDUM TO FAR 52.212-1, VOLUME I, PARAGRAPH (E)
2. REVISE ADDENDUM TO FAR 52.212-2, PARAGRAPH (B)
All other terms and conditions of the solicitation remain unchanged unless specifically modified by this or subsequent amendments.
Amendment 0001: This amendment is issued to modify the solicitation as follows:
1) Correct CLIN 0005: The estimated quantity for CLIN 0005, 'Site Clearing and Preparation', is decreased from 1,040 cubic meters (m3) to 260 cubic meters (m3). The revised calculation is based on 65m3 per plot for four (4) plots, for a total of 260m3.
2) Update Product Service Code (PSC): The Product Service Code on the solicitation's cover page is changed from PSC 6130 to PSC 6140, 'Rechargeable Batteries.'
3) Add Attachments to the Statement of Work (SOW): The following eight (8) attachments, which are integral to the Statement of Work, are hereby added to the solicitation and are now available for download on the official SAM.gov solicitation page:
Attachment 1: Design BESS at ESS#34
Attachment 2: Design BESS at ESS#38
Attachment 3: Design BESS at ESS#42
Attachment 4: Design BESS at ESS#43
Attachment 5: MC N.019-24 LO LANDSCAPE
Attachment 6: MC N.019-24 LO PAESAGGISTICA
Attachment 7: REC - Battery Energy Storage System (BESS) at Longare
Attachment 8: MIOTTO BASE GENERATORS+PV
All other terms and conditions of the solicitation remain unchanged unless specifically modified by this or subsequent amendments.
Purchase of Battery Energy Storage Systems (BESS) units with installation in Longare, Italy
| Aug 20, 2025 | [Solicitation (Original)] Battery Energy Storage Systems (BESS) |
| Aug 25, 2025 | [Solicitation (Updated)] Battery Energy Storage Systems (BESS) |
| Aug 28, 2025 | [Solicitation (Updated)] Battery Energy Storage Systems (BESS) |
| Sep 18, 2025 | [Solicitation (Updated)] Battery Energy Storage Systems (BESS) |
| Sep 19, 2025 | [Solicitation (Updated)] Battery Energy Storage Systems (BESS) |

With GovernmentContracts, you can:
...Follow Z1DA--550-23-104 Install Rooftop PV Multiple Buildings (CON) Active Contract Opportunity...
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 6/16/2026
...islanding capability. The microgrid system will incorporate a ground-mounted 750kW photovoltaic (PV...
DEPT OF DEFENSE
Bid Due: 6/29/2026
...capability. The microgrid system will incorporate a ground-mounted 750kW photovoltaic (PV) solar system...
DEPT OF DEFENSE
Bid Due: 6/29/2026
...islanding capability. The microgrid system will incorporate a ground-mounted 750kW photovoltaic (PV...
DEPT OF DEFENSE
Bid Due: 6/29/2026