Request for Bids - 2026 Water Mains (Dover, 10th, 11th, and Larson).pdf

Location: Kansas
Posted: Jul 15, 2026
Due: Aug 6, 2026
Agency: City of Salina
Type of Government: State & Local
Category:
  • Z - Maintenance, Repair or Alteration of Real Property
Publication URL: To access bid details, please log in.
Name Size
File Request for Bids - 2026 Water Mains (Dover, 10th, 11th, and Larson).pdf 140.7 KB

Attachment Preview

REQUEST FOR BIDS
The City of Salina, Kansas is currently accepting sealed bids for the following project, at
the office of the City Clerk, City-County Building 300 West Ash, Room 206 Salina, Kansas,
until 2:00 p.m. (Central), Thursday, August 6, 2026, at which time the bids will be opened
publicly and read aloud.
PROJECT NO. 26017
2026 WATER MAIN REPLACEMENT PROJECT
PHASE 1 - DOVER DR
* Install 12-inch (36 Linear Feet) DICL Water Main
* Install 6-inch (36 Linear Feet) DICL Water Main
* Install 6-inch (1,725 Linear Feet) Water Main
* Install Fire Hydrants & Valve Assemblies (2 Each)
* Remove Fire Hydrants & Valve Assemblies (2 Each)
* Install Resilient Gate Valves: 12-inch (1 Each); 6-inch (7 Each)
* Install Water Services: 1" (17-Long, 16-Short)
* Remove & Replace Private Sanitary Sewer Main: (20 Linear Feet)
* Remove & Replace Sanitary Sewer Main: 8-inch (20 Linear Feet)
* Abandon Existing Water Line Valves (8 Each)
* Tracer Wire Connection Terminals (3 Each)
* Remove and Replace Water Meter Pit, One Meter (2 Each)
* Remove and Replace Water Meter Pit, Two Meters (1 Each)
* Remove, Replace, and Relocate Water Meter Pit, One Meter (19 Each)
* Remove, Replace, and Relocate Water Meter Pit, Two Meters (5 Each)
*
PHASE 2 - 10TH AND 11TH ST
* Install 6-in (18 Linear Feet) DICL Water Main
* Install 6-inch (3,165 Linear Feet) Water Main
* Install Fire Hydrants & Valve Assemblies (7 Each)
* Remove Fire Hydrants & Valve Assemblies (6 Each)
* Install Tapping Sleeve, Valve and Valve Box (12" x 6") (3 Total)
* Install Resilient Gate Valves: 6-inch (7 Each)
* Install Water Services: 2" (1-Long); 1.5" (14-Long); 1" (30-Long, 38-Short)
* Abandon Existing Water Line Valves (9 Each)
* Tracer Wire Connection Terminals (9 Each)
* Remove Abandoned Meter Pit (1 Each)
* Remove and Replace Water Meter Pit, One Meter (30 Each)
* Remove and Replace Water Meter Pit, Two Meters (8 Each)
* Remove, Replace, and Relocate Water Meter Pit, One Meter (35 Each)
* Remove, Replace, and Relocate Water Meter Pit, Two Meters (8 Each)
RB-1

PHASE 3 - LARSON ST
* Install 6-inch (18 Linear Feet) DICL Water Main
* Install 6-inch (750 Linear Feet) Water Main
* Install Fire Hydrants & Valve Assemblies (2 Each)
* Remove Fire Hydrants & Valve Assemblies (1 Each)
* Install Tapping Sleeve, Valve and Valve Box (8" x 6") (1 Total)
* Install Resilient Gate Valves: 6-inch (1 Each)
* Install Water Services: 1" (11-Long, 9-Short)
* Abandon Existing Water Line Valves (7 Each)
* Tracer Wire Connection Terminals (2 Each)
* Remove and Replace Water Meter Pit, One Meter (19 Each)
* Remove, Replace, and Relocate Water Meter Pit, One Meter (1 Each)
The drawings, specifications and other contract documents are the property of the City of
Salina, Kansas, and are available for public inspection at the office of the Director of Utilities,
City-County Building 300 West Ash, Room 205, Salina, Kansas. Please contact the Utilities
Department at 785-309-5725 with any questions in regard to the project. The documents may be
obtained from the office of the Director of Utilities upon payment of $60.00, which is non-
refundable.
The City of Salina, Kansas, reserves the right to reject any or all proposals and to waive
any irregularities therein.
THE CITY OF SALINA, KANSAS
/s/ Nikki Goding
CITY CLERK
RB-2

This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...and ductile iron water main by Horizontal Directional Drill, Auger Boring, and/or conventional... ...

City of Lawrence

Bid Due: 8/18/2026

...will be installed. Electrical upgrades include replacing and relocating the main panel and ...

DEPT OF DEFENSE

Bid Due: 8/26/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.