Purchase and Installation of Aluminum Storefront Assemblies
A pre-quote conference is scheduled for November 13, 2026 at 10:00 A.M. at the Gwinnett County Sheriff’s Office located at 2900 University Parkway, Lawrenceville, GA 30043
Buyer Contact : Jake.Scarpone@GwinnettCounty.com
Opening Date : 11/13/2026 02:00 PM EST
November 5, 2026
INFORMAL WRITTEN QUOTE
IWQ 135824
Gwinnett County is soliciting competitive quotes from qualified contractors for the Purchase and Installation of
Aluminum Storefront Assemblies for the Gwinnett County Sheriff's Office.
Quotes should be typed or submitted in ink and returned to the Attention of Jake Scarpone, Purchasing Associate
III. Quotes should be received by 3:00 P.M. on November 23, 2026 by email to
Jake.Scarpone@GwinnettCounty.com or sent to the Gwinnett County Financial Services - Purchasing Division -
2nd Floor - Financial Services, 75 Langley Drive, Lawrenceville, Georgia 30046.
A pre-quote conference is scheduled for November 13, 2026 at 10:00 A.M. at the Gwinnett County Sheriff's Office
located at 2900 University Parkway, Lawrenceville, GA 30043. All interested contractors are urged to attend.
Questions regarding quotes should be directed to Jake Scarpone, Purchasing Associate III at
Jake.Scarpone@GwinnettCounty.com or by calling 770-822-8722 no later than 3:00 P.M. on November 16, 2026.
Quotes are legal and binding upon the bidder when submitted. The written Quote documents supersede any verbal
or written prior communications between the parties.
Successful awarded vendor will be required to meet insurance requirements. Insurance Company must be
authorized to do business in Georgia by The Georgia Insurance Department, listed in the Department of Treasury's
Publication of Companies holding Certificates of Authority as Acceptable Surety on Federal Bonds and as
acceptable reinsuring companies, and must have an A.M. Best rating of A-7 or higher.
Gwinnett County does not discriminate on the basis of disability in the admission or access to its programs or
activities. Any requests for reasonable accommodations required by individuals to fully participate in any open
meeting, program or activity of Gwinnett County Government should be directed to the ADA Coordinator, Gwinnett
County Justice and Administration Center, 770-822-8165.
Award will be made to the contractor submitting the lowest responsive and responsible quote. Gwinnett County
reserves the right to reject any or all quotes, to waive technicalities, and to make an award deemed in its best
interest. Quotes may be split or awarded in entirety. Gwinnett County reserves the option to negotiate terms,
conditions and pricing with the lowest responsive, responsible bidder(s) at its discretion.
We look forward to your quote and appreciate your interest in Gwinnett County.
Jake Scarpone, CPPB
Purchasing Associate III
The following pages should be returned with your quote: Quote Schedule, Page 8
References, Page 9
Subcontractor List, Page 10
E-Verify, Page 11
IWQ 135824 PAGE 2
SPECIFICATIONS
GWINNETT COUNTY SHERIFF'S OFFICE ALUMINUM STOREFRONT ASSEMBLIES
I. GENERAL INFORMATION
The Gwinnett County Sheriff's Office is soliciting quotes from qualified contractors to furnish and install two
new commercial-grade aluminum storefront assemblies at designated facility locations:
1. A custom unequal-leaf double-door entrance.
2. A clear-glass wall with a centered single entrance door. Both assemblies shall use clear safety glazing
and aluminum framing. This is new installation work.
II. SCOPE OF WORK
1. The contractor shall be responsible for verifying field conditions and taking accurate measurements,
including the opening dimensions, substrates, and other site conditions.
2. Contractor shall furnish and install two complete aluminum storefront assemblies, including doors, fixed
glass, frames and hardware.
3. Contractor must provide required thresholds, sweeps, gaskets, sealants, trim, fasteners and anchorage.
4. Contactor shall adjust and test all doors, exit devices, locks and closers.
5. The contractor must protect adjacent surfaces; clean completed work and remove installation debris.
6. Contractor shall provide training on hardware operation to GCSO Facilities Management.
III. MATERIAL SPECIFICATIONS
1. Assembly No. 1 - Custom Double-Door Entrance
a. One complete assembly
b. Dimensions and Configuration
* Overall opening width: 72 inches
* Overall opening heigh: 96 inches
* Left door leaf width: 32 inches
* Right door leaf width: 36 inches
* Door leaf height: 95.5 inches
* Two (2) unequal width, clear-glazed aluminum storefront door leaves in one common frame.
* Left and right leaf subject to final approved hardware and egress design.
* Both leaves to swing outward as shown in the approved drawings. Contractor shall provide shop
drawings.
* Clear anodized aluminum finish unless otherwise approved by Gwinnett County Sheriff's Office
Representative.
c. Door Hardware:
* Von Duprin 33 series (or approved equivalent) concealed vertical rods exit devices on both
leaves, as shown in the concept drawing. Contractor shall provide compatible configurations
and accessories.
IWQ 135824 PAGE 3
* Exterior keyed cylinder operation compatible with exit devices and GCSO key-control
requirements; Corbin 195-U280 or an approved equivalent.
* Heavy duty surface-mounted door closers with suitable arms and mounting brackets; LCN
404XP or an approved equivalent.
* Full-height stainless steel continuous mortise hinges.
* Commercial-grade sweeps, threshold, strikes, fasteners, and related accessories.
2. Assembly No. 2 - Glass Wall with Centered Door
a. One complete assembly
b. Dimensions and Configuration:
* Overall wall opening width: 204 inches
* Overall wall opening height: 96 inches
* Centered door width: 36 inches
* Door height: 95.5 inches
* Fixed glass panel dimensions shall be established from field measurements and approved shop
drawings.
* Contractor shall provide a clear-glass storefront wall with aluminum framing, fixed glass panels
on both sides, and a 36-inch wide door centered within the wall.
* Contractor must include horizontal and vertical framing members generally consistent with the
attached drawing.
* Door shall swing outward; final handling shall be confirmed in the approved shop drawings.
* Clear anodized aluminum finish unless otherwise approved by Gwinnett County Sheriff's Office
Representative.
c. Door Hardware
* Commercial-grade rim exit device
* Exterior keyed cylinder trim compatible with GCSO keying requirements.
* Heavy-duty surface-mounted closer and commercial-grade hinges.
* Door sweep, threshold, weatherstripping, strikes, seals, and mounting accessories.
3. Material and Quality Requirements
a. Aluminum Framing
Contractor shall provide a commercial-grade architectural aluminum storefront system sized and
reinforced for the actual openings, glazing weight, hardware, and applicable design loads. Finish
shall be clear anodized. All exposed components shall be free of dents, scratches, and distortion.
b. Glass
Contractor shall provide clear-tempered safety glazing meeting applicable code requirements. Final
glass thickness and any additional safety or performance requirements shall be determined by the
approved system design and location. Use manufacturer-approved gaskets, setting blocks, and
glazing methods. Glass shall be free of chips, cracks, and visible damage.
c. Hardware and Anchors
All hardware shall be new, heavy-duty, commercial-grade equipment suitable for high-traffic
institutional use. Contractor shall provide corrosion-resistant fasteners and anchors appropriate to
IWQ 135824 PAGE 4
the existing substrates. Any substitution of specified hardware requires written approval before
procurement.
IV. NEW INSTALLATION REQUIREMENTS
1. Contractor shall verify field dimensions and suitability of supporting construction before ordering or
fabricating.
2. Contractor shall identify any required opening modifications or structural support work for approval
before proceeding; such work is not included unless specifically authorized.
3. Contractor shall install frames plumb, level, square, and securely anchored in accordance with
manufacturer instructions.
4. Contractor shall install fixed glass doors, align framing members, and provide complete perimeter trim
and seals.
5. Contractor shall provide weather-resistant sealing at exterior locations where applicable.
6. Contractor shall install and adjust exit devices, cylinders, hinges, closers, sweeps and thresholds.
7. Contractor shall test smooth opening, controlled closing, positive latching, and required egress function.
8. Contractor shall repair any damage caused by installation, clean glass and framing, and remove debris.
9. No demolition of removal of existing storefront doors or frames is included.
V. FACILITY SECURITY REQUIREMENTS
The facility will remain operational during the work. Contractor personnel shall comply with all GCSO access,
identification, escort, tool accountability, and site security requirements. Work shall be confined to authorized
areas. Photography requires prior approval. The contractor shall coordinate installation schedules and any
temporary opening protection with Facilities Management. No controlled entrance shall be left unsecured.
VI. REQUIRED SUBMITTALS
1. Storefront manufacturer product data and finish information.
2. Field-verified shop drawings showing overall openings, unequal door widths, centered glass-wall door,
glass divisions, door swings, handling, and anchorage.
3. Glazing specifications and complete hardware schedule, including exit device and closer models.
4. Proposed installation schedule and material lead time.
5. Manufacturer warranties and product operation/maintenance information.
6. NOTE: No fabrication shall begin until required shop drawings and materials have been reviewed and
approved by GCSO Facilities Management.
VII. INSPECTION AND ACCEPTANCE
Final acceptance is subject to inspection by GCSO Facilities Management. Both assemblies shall be securely
installed, clean, undamaged, properly sealed where applicable, and fully operational. Doors shall swing freely,
close in a controlled manner, latch positively, and allow required egress. The contractor shall correct
deficiencies before acceptance.
VIII. WARRANTY
Contractor shall provide a minimum one-year warranty on installation workmanship and all applicable
manufacturer warranties for doors, framing, glazing, and hardware. Correct defects attributable to
workmanship during the warranty period at no additional cost to the County.
IWQ 135824 PAGE 5
IX. GENERAL CONDITIONS & REQUIREMENTS
1. The contractor shall verify all dimensions in the field.
2. Work shall be performed by qualified commercial storefront installers.
3. All work shall comply with applicable building codes, accessibility standards, and egress requirements.
4. The 32-inch lead and proposed exit arrangement shall be reviewed for compliance prior to fabrication.
No statement in these specifications waives applicable clear-opening or egress requirements.
5. Additional work or material substitutions require written authorization before proceeding.
6. The included drawings are conceptual and do not supersede approved field measurements, shop
drawings, or applicable code requirements.
IWQ 135824 PAGE 6
X. ORIGINAL CONCEPT DRAWINGS
Original Drawing 1: Custom Unequal Leaf Double-Door Entrance
IWQ 135824 PAGE 7
Original Drawing 2: Clear Glass Wall with Centered Single Entrance Door
| ITEM# | DESCRIPTION | DELIVERY | TOTAL PRICE | ||
|---|---|---|---|---|---|
| A.R.O. | |||||
| 1. | LUMP SUM FEE FOR CUSTOM DOUBLE-DOOR STOREFRONT, PER ABOVE SPECIFICATIONS | $ | |||
| 2. | LUMP SUM FEE FOR CLEAR GLASS WALL WITH CENTERED 36-INCH DOOR, PER ABOVE SPECIFICATIONS | $ | |||
| OVERALL QUOTE TOTAL | $ |
IWQ 135824 PAGE 8
FAILURE TO RETURN THIS PAGE AS PART OF YOUR QUOTE MAY RESULT IN REJECTION OF QUOTE
QUOTE SCHEDULE
DELIVERY
ITEM# DESCRIPTION TOTAL PRICE
A.R.O.
LUMP SUM FEE FOR CUSTOM DOUBLE-DOOR STOREFRONT, PER ABOVE
1. $
SPECIFICATIONS
LUMP SUM FEE FOR CLEAR GLASS WALL WITH CENTERED 36-INCH DOOR, PER
2. $
ABOVE SPECIFICATIONS
OVERALL QUOTE TOTAL $
NOTES:
1. Lump Sum Fee must include all costs associated with this request including, but not limited to, labor, materials, disposal and travel time.
State estimated # of days for project completion: ________________________________
State warranty period: _________________________________
Certification of Non-Collusion in Quote Preparation
Signature Date
In compliance with the attached specifications, the undersigned offers and agrees, within ninety (90) days of the date of quote opening, to furnish any or all of the
items upon which prices are quoted, at the price set opposite each item, delivered to the designated point(s) within the time specified in the quote schedule.
Legal Business Name
Address
Does your company currently have a location within Gwinnett County? Yes No
Representative Signature Printed Name
Telephone Number Fax Number
Email Address
IWQ 135824 PAGE 9
REFERENCES
Gwinnett County requests a minimum of three (3) references from within the last five (5) years
where work of a similar size and scope has been completed.
Note: References should be customized for each project, rather than submitting the same set of
references for every project bid. The references listed should be of similar size and scope of the
project being bid on. Do not submit a project list in lieu of this form.
1. Company Name
Brief Description of Project
Completion Date
Contract Amount $ Start Date
Contact Person Telephone
E-Mail Address
2. Company Name
Brief Description of Project
Completion Date
Contract Amount $ Start Date
Contact Person Telephone
E-Mail Address
3. Company Name
Brief Description of Project
Completion Date
Contract Amount $ Start Date
Contact Person Telephone
E-Mail Address
Company Name
| NAME AND ADDRESS | TYPE OF WORK | ||||
IWQ 135824 PAGE 10
GWINNETT COUNTY, GEORGIA
LIST OF SUBCONTRACTORS
I do , do not , propose to subcontract some of the work on this project.
I propose to Subcontract work to the following subcontractors:
NAME AND ADDRESS TYPE OF WORK
Company Name

With GovernmentContracts, you can:
Follow Repair/Overhaul of Flat Panel Up Front Controller (FPUFC) Active Contract Opportunity Notice
DEPT OF DEFENSE
Bid Due: 11/25/2026
Project Project No. Advertise Date Bid Date Chattahoochee River Trail, Phase II GDOT
Cobb County Transportation
Bid Due: 1/15/2027
Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-33658-NONST-2027-000000005
State Government of Georgia
Bid Due: 11/23/2026
BL152-26 NOT Beaver Ruin Diversion Pump Station Grinders Replacements Project Buyer Contact :
Gwinnett County
Bid Due: 11/20/2026