| Location: | Michigan |
|---|---|
| Posted: | Mar 29, 2026 |
| Due: | Apr 1, 2026 |
| Agency: | Great Lakes Water Authority |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | REQ-0007184 |
| Publication URL: | To access bid details, please log in. |
Project Description: Contractor shall conduct numerous improvements to the Hubbell-Southfield Combined Sewer Overflow (CSO) Facility located in Dearborn, Michigan. Hubbell-Southfield has a 22-million-gallon (MG) storage capacity and a design flow capacity of 2,200 cfs. The facility began operation in 1999 and requires rehabilitation and upgrades to ensure continued reliable treatment of wet weather flows. The facility discharges to the Northwest Interceptor with overflows discharging to the Rouge River.
This project is focused on improving facility treatment reliability, flexibility, operation, maintenance, and safety features at the Hubbell Southfield CSO Facility. This project encompasses improvements to basin flushing, dewatering, disinfection, screening, instrumentation and controls, architectural/HVAC, and electrical, as well as site work and other items. A major upgrade is to replace the existing flushing system used to clean the basin with a more effective system.

With GovernmentContracts, you can:
...Sewer Lining Project RFP 26-52 Megan Seay Open PUBLIC IMPROVEMENT REQUEST FOR PROPOSAL ...
City of Ann Arbor
Bid Due: 12/02/2026
...Project: Rehabilitation of the 7-Mile Sewer System Ref. #: REQ-0011642 Type: RFB Status: ...
Great Lakes Water Authority
Bid Due: 1/15/2027
...Storm Sewer Cleaning and CCTV Investigation Map Set of work locations Storm Sewer ...
City of St. Clair Shores
Bid Due: 11/24/2026
...Sanitary Sewer Jetting RFP (Due December 8, 2026 at 10:00AM) The Charter Township ...
Township of Brighton
Bid Due: 12/08/2026