Repair/Replace Mass Parking Apron Section V at Minot AFB North Dakota
| Location: |
North Dakota |
| Posted: |
Aug 26, 2026 |
| Due: |
Aug 27, 2026 |
| Agency: |
DEPT OF DEFENSE |
| Type of Government: |
Federal |
| Category: |
- Z - Maintenance, Repair or Alteration of Real Property
|
| Solicitation No: |
W9128F26RA107 |
| Publication URL: |
To access bid details, please log in. |
Repair/Replace Mass Parking Apron Section V at Minot AFB North Dakota
Active
Contract Opportunity
Department/Ind. Agency
DEPT OF DEFENSE
Sub-tier
DEPT OF THE ARMY
Major Command
US ARMY CORPS OF ENGINEERS
Sub Command
ENGINEER DIVISION NORTHWESTERN
Sub Command 2
ENDIST OMAHA
Office
W071 ENDIST OMAHA
Looking for contract opportunity help?
General Information View Changes
-
Contract Opportunity Type: Solicitation (Updated)
-
Updated Published Date: Aug 26, 2026 12:38 pm CDT
-
Original Published Date: Jul 21, 2026 12:11 pm CDT
-
Updated Date Offers Due: Aug 27, 2026 11:00 am CDT
-
Original Date Offers Due: Aug 20, 2026 11:00 am CDT
-
Inactive Policy: Manual
-
Updated Inactive Date: Sep 30, 2026
-
Original Inactive Date:
Sep 30, 2026
-
Initiative:
Classification
Description View Changes
Amendment 0003 = 1. Revise Section 00 21 00, paragraph 8. 2. Revise Section 00 22 00, paragraph 1. 3. Remove 52.242-4 Final indirect cost rates Offers will be received until 10:00 am Central 27 August 2026. Repair/Replace Mass Parking Apron Section V at Minot Air Force Base, Minot, North Dakota. The solicitation will close after 30 days. The solicitation is restricted to Small Businesses. Project Description: This project will be executed using a design-bid-build project delivery method. The entire Mass Parking Apron will be removed and replaced in multiple sections over the course of several years. The existing MPA was originally constructed under two separate contracts. For unknown reasons, the first constructed eastern half is 5 ft narrower than the western half south of the MPA centerline taxiway (335 ft vs 340ft). This project will establish a uniform MPA width of 340 ft south of the MPA centerline taxiway. Due to slight changes in finished top of pavement grades between the new MPA Section(s) pavement and the existing MPA pavement to remain, a new temporary ACC transition will be required to connect new MPA Section(s) PCC pavement to existing MPA PCC pavement. Limited grading of turf areas adjacent to new ACC shoulder pavement to improve surface drainage away from paved shoulder edges (Provide 1-1/2 drop-off at edge per UFC 3-260-01, Chapter 6). Existing asphalt shoulders required to be removed will be milled by the Contractor and stockpiled for Minot AFB use at a later date at the location shown on the drawings. Estimated Construction Costs: The estimated construction cost of this project is between $25,000,000 and $35,000000.
Attachments/Links
Contact Information
Contracting Office Address
-
KO CONTRACTING OFFICE 1616 CAPITOL AVENUE
-
OMAHA , NE 68102-4901
-
USA
Secondary Point of Contact
History
Daily notification on new contract opportunities
With GovernmentContracts, you can:
- Find more opportunities and win more business
- Receive daily alerts for all new bid opportunities
- Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
See also
...and Construction Phase Services. This design build project is at Quentin N. Burdick ...
GENERAL SERVICES ADMINISTRATION
Bid Due: 9/16/2026
...range of design-bid-build and design-build construction projects to support the missions of the ...
DEPT OF DEFENSE
Bid Due: 9/28/2026
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.