Request for Bid | Exhaust Hood Project - Summer 2026
Bid
Exhaust Hood Project - Summer 2026
Prepared by: Scott Roenfeldt
March 5, 2026
Bids are Due: April 8th , 2026 by 12:00 PM CST
Project Site:
Regional Innovation Center
2205 South 1st Street
Eldridge, Iowa
Page 1
Request for Bid | Exhaust Hood Project - Summer 2026
The North Scott Community School District will be accepting bids for a kitchen exhaust hood
and all required components at the Regional Innovation Center (2205 South 1st Street,
Eldridge, Iowa 52748): Room 163 on the North Wall
Required Walkthrough Date: March 26th, 2026, 9:00 am CST at 2205 South 1st Street,
Eldridge, Iowa 52748
Question Deadline: April 2nd, 2026, at 10:00 am CST. Questions can be emailed to
scott.roenfeld@north-scott.k12.ia.us
Submission Requirements:
Please submit:
● 1 hard copy of the proposal, in its entirety, to 251 E. Iowa Street, Eldridge, IA
52748
● Email a copy to the contact below
Due Date: No later than 12:00 PM CST on APRIL 8TH, 2026.
Project Contact:
Scott Roenfeldt
North Scott Community School District
251 E. Iowa Street
Eldridge, Iowa 52748
scott.roenfeldt@north-scott.k12.ia.us
Attn: Exhaust Hood Project - Summer 2026
Project Details
Supply and install a Kitchen exhaust hood:
Supply and install duct from hood to exhaust fan
Supply and install exhaust fan with curb
Supply and install duct to make up air fan
Supply and install make up air fan with curb
Supply and install 12’ stainless steel kitchen hood with LED lights
Supply and install fire suppression system in hood
Supply and install stainless steel back splash
Supply and install gas pipe to owner supplies equipment
Supply and install electrical to owner supplied equipment
Gas pipe to be connected to emergency shut off
Connect system to the existing fire alarm in building and room
Page 2
Request for Bid | Exhaust Hood Project - Summer 2026
All roof penetrations to be by contractor including roof seal
Supply and install electric to hood, exhaust and make up air fans
Reroute any existing items as necessary for the installation.
Owner Supplied Equipment:
● Double deck Convection oven - 240v 1ph 50 amp (2)
● 2 - Natural gas fryer 115v needed
● 1 - 48” natural gas flat top griddle 115v needed
Bid will include:
● All insurance
● Labor
● Materials
● Overhead and profit
● Permits (state is the jurisdiction)
● Inspections
● All items to complete the work for a functioning system
● Comply with all Local, state, and federal codes.
Bids will be broken down/detailed as follows:
● Cost of Hood including:
○ all installation
○ Duct
○ Fire protection
○ Lights
○ Exhaust fan
○ Make-up air fan.
● Electrical, all electrical to complete the project
● Plumbing, all plumbing to complete the project
Project Location
Address:
Regional Innovation Center
2205 South 1st Street
Eldridge, Iowa 52748
Room Details:
Room 163 on the North Wall
Page 3
Request for Bid | Exhaust Hood Project - Summer 2026
North Scott Community School District
Request for Bid - Bid Form
Exhaust Hood Project - Summer 2026
Hood Bid ____________________________________________________
Electrical Bid _________________________________________________
Plumbing Bid _________________________________________________
Total Bid ____________________________________________________
Date _______________________________________________________
Company ___________________________________________________
Name ______________________________________________________
Signature ___________________________________________________