| Location: | Texas |
|---|---|
| Posted: | Oct 12, 2026 |
| Due: | Nov 13, 2026 |
| Agency: | State Government of Texas |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 27CSP001 |
| Publication URL: | To access bid details, please log in. |
27CSP001
Posted
Lana Beranek
(512) 232-7037
lana@austin.utexas.edu
11/13/2026
11:00 AM
721
21+ Days for Solicitation Notice
Dual CTCD/CTCM certification
10/12/2026
10/12/2026 1:10 pm
90921-Building Construction, Industrial (Warehouse, Etc.);
90924-Building Construction, Commercial And Institutional;
90945-Finishes: Flooring, Wall And Ceiling, Etc.;
90923-Building Construction, Residential (Apartments, Etc.);
90930-Building Construction (Not Otherwise Classified);
91461-Painting And Wallpapering;
91468-Plumbing;
91484-Trade Services, Construction (Not Otherwise Classified);
91450-Heating, Ventilating And Air Conditioning (Hvac);
District 14,
This project includes 10 non-ADA Jack and Jill suites, 3 single rooms with attached bathroom, 2 accessible Jack and Jill suites with roll-in showers, 1 accessible Jack and Jill suite with a transfer shower, 1 single accessible room with attached bathroom with a roll-in shower, and 1 single accessible room with attached bathroom with a transfer shower on Level 1 at the North Tower. This project consists of the following: Demolition of flooring, walls, plumbing fixtures, wall and floor tile, doors, built-in furniture, and ceilings of 9 rooms and 5 bathrooms on Level 1 as well as doors at Rooms 158 and 160, where walls within suite were previously demolished to become fully ADA/TAS compliant accessible rooms and suites as described above. New work to include new walls, doors, plumbing re-build to tie into new chase walls, plumbing fixtures, and toilet accessories at new accessible suites as described above. All 32 rooms in scope to receive new flooring, base, paint, HVAC pony wall surround, sink and faucet in cabinet, tackboards, paint, and drywall where indicated. Power is existing and will be connected to new devices within 6’ of original location. New Lounge at North Tower Entry will be incorporated, capturing demolished resident room 152 to provide an accessible route from ground level to Level 1 resident rooms with the incorporation of a pit-free, ramp-free, electric chair lift. A small slab addition will be incorporated to infill a small area adjacent to the new chair lift location for acontinuous floor at the new Lounge 152.

With GovernmentContracts, you can:
Project: Architectural, Engineering & Environmental Review Services for Federally Funded Residential Projects Ref.
Fort Bend County
Bid Due: 11/17/2026
Project: CSP - New Construction of the Mathews Community Center for the Office
Harris County
Bid Due: 11/23/2026
Bid Date: 12/31/2026 Location: Statewide Project No: 2027Statewide-ProfessionalDesignServices Description: Pre-Solicitation Notification for Upcoming
Texas Parks and Wildlife Department
Bid Due: 12/31/2026
RFQ 26-123 Status: Current Solicitation Name: Architectural Services for Potential Future County Jail
Galveston County
Bid Due: 12/10/2026