| Location: | South Dakota |
|---|---|
| Posted: | Jul 8, 2026 |
| Due: | Jul 27, 2026 |
| Agency: | ENERGY, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 73573 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
July 8, 2026 - Attachment 1 is issued to provide questions and answers to the RFP. Documents are contented in the attachmed link.
As part of the DUNE experiment, approximately 40,000 metric tons of Argon is required to be transported from the surface to the Central Utility Cavern (CUC) at the 4850 Level. This Argon will arrive at the Ross Shaft Argon Receiving station in liquid form where it will be stored in tanks. It will then be converted to the gaseous phase, where it will be transported underground through a stainless-steel pipeline. This pipeline will be 8” diameter Schedule 10 between the Argon Receiving Facility and the Ross shaft, 6” diameter schedule 10 from Ross shaft collar to the 4850 Level, then return to 8” diameter schedule 10 from the Ross shaft to the CUC.
This SOW defined as “Argon Gas Piping Supply and Installation for LBNF” outlines the requirements for the supply, installation and testing of a stainless-steel pipeline at LBNF as described above.
| Jun 2, 2026 | [Solicitation (Original)] Argon Piping Supply, Installation and Testing |
| Jul 17, 2026 | [Solicitation (Updated)] Argon Piping Supply, Installation and Testing |

With GovernmentContracts, you can:
Bid Number: #2026-8 Bid Title: Mitchell Fire Station Category: Construction Projects Status: Open
Mitchell city
Bid Due: 8/05/2026
Lot 23 Existing Improvements The City of Pierre, South Dakota (City), will receive
City of Pierre
Bid Due: 8/13/2026
Follow Y--GAOA Centennial Trail Bridge Active Contract Opportunity Notice ID 140L0626R0016 Related Notice
INTERIOR, DEPARTMENT OF THE
Bid Due: 7/31/2026
Follow Pine Ridge Hospital Roof Replacement Active Contract Opportunity Notice ID 75H70126R00034 Related
HEALTH AND HUMAN SERVICES, DEPARTMENT OF
Bid Due: 8/14/2026