| Location: | Tennessee |
|---|---|
| Posted: | Jul 8, 2026 |
| Due: | Jul 24, 2026 |
| Agency: | ENERGY, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | PR449089 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
ORNL High Flux Isotope Reactor GP-SANS Polarizer
CORRECTS Drawing Number in Attachment A - HFIR GP-SANS V-Cavity Equipment Specification Corrected.ADDS Attachment G - Drawing CG2-M-20-U-0018-R00 and Subdrawings.
The High Flux Isotope Reactor (HFIR) at Oak Ridge National Laboratory (ORNL) is a high-flux research reactor that, in addition to isotope production, serves as a steady-state neutron source for a suite of neutron scattering instruments. Among these, the General-Purpose Small-Angle Neutron Scattering (GP-SANS) instrument is being upgraded to incorporate incident beam polarization capabilities. This enhancement will enable spin-resolved SANS measurements, allowing for the separation of nuclear and magnetic scattering components and facilitating studies of magnetic order, spin textures, and correlated spin structures. A critical component of this upgrade is the integration of a polarizing cavity, which utilizes magnetized supermirrors or transmission-based polarizers to produce a beam of neutrons in a well-defined spin state prior to their interaction with the sample. This capability is essential for conducting polarization analysis and advanced techniques such as polarization contrast measurements and vector-magnetic SANS.
This specification defines requirements for materials of construction, fabrication, inspection, and delivery to the Company of a complete polarizing cavity and magnetic housing assembly. The polarizing cavity and magnetic housing assembly shall be installed at the GP-SANS instrument.
| Jun 15, 2026 | [Solicitation (Original)] ORNL High Flux Isotope Reactor GP-SANS Polarizer |
| Jul 14, 2026 | [Solicitation (Updated)] ORNL High Flux Isotope Reactor GP-SANS Polarizer |
| Jul 27, 2026 | [Solicitation (Updated)] ORNL High Flux Isotope Reactor GP-SANS Polarizer |

With GovernmentContracts, you can:
...Submittals due by November 24th, 2026 at 11am ET. Attached Document : ITB ...
City of Johnson City
Bid Due: 11/24/2026
...Bid Number: FY2027-11-008 Bid Title: Construction Inspection Services-The Fletcher Creek Sewer... engineering firm ...
City of Bartlett
Bid Due: 12/04/2026
...Follow 614-326 Construct Parking Garage West Lot Addition Minor Construction Active Contract... PARKING ...
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 11/26/2026
...Phone: (901) 261-4722 E-Mail: cashbrand@allenhoshall.com Description: Construction of a new ground up...
State Government of Tennessee
Bid Due: 12/17/2026