2025 Industrial Building

Location: Georgia
Posted: May 30, 2025
Due: Jun 30, 2025
Agency: State Government of Georgia
Type of Government: State & Local
Category:
  • 56 - Construction and Building Materials
  • Y - Construction of Structures and Facilities
Solicitation No: PE-77648-NONST-2025-000000019
Publication URL: To access bid details, please log in.
Event ID Event Title Government Entity Start Date (ET) End Date (ET)
PE-77648-NONST-2025-000000019 2025 Industrial Building Tift County Board Of Commissioners
May 30, 2025 @ 11:23 AM
Jun 30, 2025 @ 10:00 AM
2025 Industrial Building

Start Date: May 30, 2025 @ 11:23 AM ET

End Date:
Jun 30, 2025 @ 10:00 AM ET

Event ID: PE-77648-NONST-2025-000000019
Event Type: Non-State Agency
Event Status: Open
Purchase Type: Non-State Agency
Category Type: Construction / Public Works
Government Type: county
Fiscal Year: 2025


Description


This project will be a 100,000 sf expandable building on a new industrial development site. The use and occupancy of the building is undetermined at this time.

Site Improvements will be required including grading, storm drainage, site utilities, asphalt paving, and related site construction. Storm water control (detention/retention) during construction and final measures shall be designed and installed by the Design-Build firm per requirements of the authorities having jurisdiction for the project.

The Building shall be a 100,000 sf Metal Building. Concrete Foundations for Metal Building shall be designed according to reactions provided by the building manufacturer. Concrete Floor Slab shall be 4000 psi and 6¿ minimum thickness. The building shall be constructed with a 50¿x50¿ column spacing bay width. It shall be 35¿ clear ceiling height (preference for 40¿ eave height). Roofing shall be standard standing seam metal roof panels. Batt Insulation shall be required in the roof and walls. Ventilation shall be provided with Fans & Louvers. Dock Doors shall be electrically operated. Building Front Exterior wall shall be constructed of Brick Masonry with CMU backup up to a height of 20¿. Exterior exit ways shall be designed per code requirements.

Since the occupancy is underdetermined, a Fire Sprinkler System stub-in will be provided only that matches the municipal water main size that serves the property.

Electrical System distribution will be minimal due to undetermined occupancy. Lighting systems shall be provided. Provide power connections to installed equipment. Provisions shall be provided for a fire alarm system to be installed at a later date.

NIGP Codes
Code Description
15510 Buildings, Large, Prefabricated, Over 500 SQFT.
15518 Cabins, Storage Buildings, etc., Pre-Engineered in Kits, Ready to Assemble and Erect
BuyerContact:

Brian Marlowe
bpmarlowe@tiftonchamber.org

229-382-6200

Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.