| Location: | North Carolina |
|---|---|
| Posted: | Apr 22, 2026 |
| Due: | May 13, 2026 |
| Agency: | City of Charlotte |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | FY26-ITBCon-47 |
| Publication URL: | To access bid details, please log in. |
Project Description: This Project consist of the removal and replacement of corrugated metal pipe with 83 linear feet (LF) of 9’ x 4’ reinforced concrete box culvert; removal; and replacement of two headwalls; removal and replacement 311 LF of 15″ reinforced concrete pipe (RCP); remove and replace 42 LF 24″ RCP; removal and replacement 27 LF 18″ RCP; bank grading; and removal and replacement of85 LF 10” ductile iron pipe of sewer. The estimated cost of the project is $1,912,291.00.

With GovernmentContracts, you can:
...Project: 3144 Freedom Drive Storm Drainage Improvement Project Ref. #: FY27-ITBCon-03 Department...: Charlotte ...
City of Charlotte
Bid Due: 6/09/2026
...Project: 3144 Freedom Drive Storm Drainage Improvement Project Ref. #: FY27-ITBCon-03 Department...: Charlotte ...
City of Charlotte
Bid Due: 6/09/2026
...Project: Bonlyn Storm Drainage Improvement Project Ref. #: FY27-ITBCON-05 Department: Charlotte... Water Type: ...
City of Charlotte
Bid Due: 6/16/2026
...Project: Bonlyn Storm Drainage Improvement Project Ref. #: FY27-ITBCON-05 Department: Charlotte... Water Type: ...
City of Charlotte
Bid Due: 6/16/2026