City of Statesboro Street Striping FY 2025 ADDENDUM 1

Location: Georgia
Posted: Feb 24, 2025
Due: Mar 12, 2025
Agency: Statesboro city
Type of Government: State & Local
Category:
  • Z - Maintenance, Repair or Alteration of Real Property
Publication URL: To access bid details, please log in.
  • RFQ/RFP 2025 SOLICITATION

    ADDENDUM 1 of 1

    Wednesday, February 19, 2025

    SOLICITATION NUMBER: RFQ/RFP 2025 SOLICITATION TITLE: City of Statesboro Street Striping FY 2025

    SERVICES DUE DATE: 3:00 PM on Wednesday, March 12th, 2025

    Purpose: Addendum 1 addresses questions asked by contractors and is designed to clarify specifics of the project

    THIS DOCUMENTATION MUST BE INCLUDED IN YOUR SUBMITTED SEALED BID FOR THE BID TO BE CONSIDERED.

    1. Bobby Donaldson– listed as white solid only, did you mean yellow solid only?Too narrow and dirty for white edge-lines. No white striping needed; this quantity will be applied as yellow solid lines only.
    2. Harden Road– needs edge-lines clipped. Is the City going to clip shoulders? Allconstruction work shall be performed in accordance with the most recent GDOT Standards and   “Section 653—Thermoplastic Traffic Stripe 653.3.05 Construction A. General Application Thoroughly clean pavement areas to be striped. Use hand brooms, rotary brooms, air blasts, scrapers, or other approved methods that leave the pavement surface clean and undamaged. Take care to remove all vegetation and road film from the striping area. All new Portland Cement Concrete pavement surfaces shall be mechanically wire brushed or abrasive cleaned to remove all laitance and curing compound before being striped.”
    3. Parker Street– no white solid present, curb/gutter. Add white edge-lines? Yes, solid white striping will be added.
    4. Vista Circle– heavy clipping and sweeping needed, will need to be pre-lined. Will the City clip and sweep the edge-lines? Refer to #2.
    5. Rucker Lane– Length limits listed of South Main to 111 South driveway is .302 miles, its only .151 miles.  151 miles is the correct quantity for this section of Rucker Lane.
    6. East Olliff Street– Length limits from Packinghouse to Zetterower are listed as 1.146 miles, only .573 miles. Road is narrow and needs clipping for white solid edge-lines. Do you want edge-lines, and will the City clip them? 573 miles is the correct length for E. Olliff St. The average road width is 20 ft, so solid white edge lines will be applied. Refer to #2.

    RECEIPT OF ADDENDUM 1 OF 1 ACKNOWLEDGED: SIGNATURE: ________________________________

  • Daily notification on new contract opportunities

    With GovernmentContracts, you can:

    • Find more opportunities and win more business
    • Receive daily alerts for all new bid opportunities
    • Get contract opportunities matched to your business
    ONE WEEK FREE TRIAL

    See also

    ...Codes Code Description 65951 Lining, Pipe, Cement, Cure-in-place, Epoxy, Trenchless, etc. 91187...

    State Government of Georgia

    Bid Due: 7/07/2026

    ..., Section 3 of this bid document. NIGP Codes Code Description 74502 Asphalt, ...

    State Government of Georgia

    Bid Due: 6/23/2026

    ...Code Description 83022 Cement Lined Tanks 96878 Tank Installation, Removal, Disposal, and Related...

    State Government of Georgia

    Bid Due: 6/18/2026

    ...Including Bituminous Materials 74502 Asphalt, AC (Asphalt Cement) BuyerContact: Adam Shelton ashelton@keckwood.com 678-417-4000...

    State Government of Georgia

    Bid Due: 6/25/2026

    * Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.