| Location: | Washington |
|---|---|
| Posted: | Jun 9, 2026 |
| Due: | Jun 15, 2026 |
| Agency: | City of Spokane |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
| Bid Date | 6/15/26 1:00pm |
Spokane, WA
This project consists of the construction of approximately 1300 square yards of pavement repair excavation including haul, 70 linear feet of storm sewer, 5 drainage structures, 1100 square yards of concrete sidewalk, 1 driver feedback sign system, 2 traffic signal systems, 3 rectangular rapid flashing beacon systems, sundry utility adjustments, and other related miscellaneous items.

With GovernmentContracts, you can:
...Bid Number: 26-28 Bid Title: 26-28 Swift Creek Channel Excavation 2026 Category: Public ...
Whatcom County
Bid Due: 7/21/2026
..., 17,000 cubic yards of excavation and embankment, 18 pedestrian ramps, 2 push ...
City of Spokane
Bid Due: 7/21/2026
...of multi-use pathway, 17,000 cubic yards of excavation and embankment, 18 pedestrian ramps, ...
City of Spokane
Bid Due: 7/21/2026
..., 17,000 cubic yards of excavation and embankment, 18 pedestrian ramps, 2 push ...
City of Spokane
Bid Due: 7/21/2026