| Location: | Pennsylvania |
|---|---|
| Posted: | Sep 10, 2025 |
| Due: | Oct 15, 2025 |
| Agency: | Allegheny County |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 2351-0006 |
| Publication URL: | To access bid details, please log in. |
Project Description: The work consists of the installation of two rows of vertically-aligned steel pipe dowels socketed into bedrock with a reinforced concrete wall cast around the upper portion of the outside row of dowels, topped by a reinforced concrete cap cast atop both rows of dowels, to stabilize and support a 360-foot length of Mount Troy Road Extension in Ross Township, Allegheny County, PA.

With GovernmentContracts, you can:
...for the rehabilitation by means of Cured-In-Place Pipe liner installation and CCTV inspection...
Pittsburgh Water & Sewer Authority
Bid Due: 11/17/2026
...Waterproofing Membrane Installation; Subsurface Waterproofing Membrane Installation; Pipe Replacements... Project: Gascola Equalization Facility ...
PennBid
Bid Due: 11/03/2026
.... Linear Installation A. Equipment Setup B. Heat Coiled Liner C. Insert Liner ...
State Government of Pennsylvania
Bid Due: 11/03/2026
...and flowable fill, installation of new stormwater structures and pipes, and trench restoration. ...
PennBid
Bid Due: 11/18/2026