| Location: | Washington |
|---|---|
| Posted: | Dec 17, 2025 |
| Due: | Dec 22, 2025 |
| Agency: | City of Spokane |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
| Bid Date | 12/22/25 1:00pm |
Spokane, WA
This project consists of the construction of approximately 9,000 square yards of 7-inch thick asphalt pavement, 4,700 linear feet of curb and/or gutter, 1,700 square yards of 2-inch thick asphalt pavement (for mixed use path), 2,200 linear feet of storm sewer (various sizes/materials), two stormwater ponds, 57 drainage structures, 1,800 linear feet of 12-inch diameter water distribution main, 280 linear feet of 8-inch diameter sewer main, sundry utility adjustments, and other related miscellaneous items.

With GovernmentContracts, you can:
...tons of HMA, 6 catch basins, 2 drywells, 140 LF of 8-inch storm ...
Moses Lake city
Bid Due: 11/03/2026
...will be received are described as follows: The IS4 - Phase 2 project ...
City of Stanwood
Bid Due: 11/17/2026