| Location: | Vermont |
|---|---|
| Posted: | Jun 9, 2026 |
| Due: | Jun 24, 2026 |
| Agency: | State Government of Vermont |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
|
Bid Type: Job Contract Locations: Windsor Keywords: Road Construction Bid Description: Scope of Work: 1. Install a stacked toe wall to stabilize the bank and roadway, approximately 6’ W x 6’ H x 120’ L 2. Follow all requirements of Stream Alteration Permit on Page 4, specifically Section C. 3. Use erosion control matting on side slopes of 2:1 4. Stone fill near the top to protect the roadway and any tree removal necessary. 5. Secure guardrail sections
|
||||||||||||||||||||

With GovernmentContracts, you can:
...5218 Pomfret Road North Pomfret , VT 05053 Bid Type: Request for Proposal ...
State Government of Vermont
Bid Due: 10/07/2026
...Removal In March of 2023, a small parcel located by Centerville Brook Dam ...
State Government of Vermont
Bid Due: 10/02/2026
...and sanding of all public roads in the Town of Brookline, VT. The ...
State Government of Vermont
Bid Due: 10/07/2026