| Location: | Utah |
|---|---|
| Posted: | Oct 15, 2026 |
| Due: | Nov 10, 2026 |
| Agency: | TRANSPORTATION, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 6982AF27B000005 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
PROJECT NUMBER: UT NP ARCH 100(2)
PROJECT NAME: Bridges on Delicate Arch Road
PROJECT DESCRIPTION:
Delicate Arch Road (DAR) is within Arches National Park (Park) and provides access to Delicate Arch. DAR is a functional class 1 roadway (Principal Park Road) and is heavily traveled by visitors and often congested during periods with moderate-to-high levels of visitation.
DAR crosses three low-gradient ephemeral washes (Salt Valley Wash, Salt Wash, and Winter Camp Wash) near their confluence in the Salt Wash Basin downstream of Wolfe Ranch. Culverts installed during original road construction in the mid-1990s and during subsequent upgrades are inadequate to allow unobstructed stream flow and sediment transport downstream. This existing condition produces flooding and sediment deposition, which creates unsafe conditions for visitors, triggers road closures, potentially strands Park visitors, diminishes visitor experience of the Park, and generates high operational costs associated with traffic management, visitor safety, and cleanup operations.
SCOPE OF THE WORK:
This project will be designated as Reconstruction (4R) with one segment of restoration (3R), and will design and construct 100’ span concrete bridges at the Salt Valley Wash, Salt Wash, and Winter Camp Wash. The DA roadway profile at each Wash will be raised to accommodate a 10-year design frequency and allow a medium-sized excavator to access each wash. The DA will be realigned at the Salt Valley wash, moving the roadway and new bridge location to the north of the existing roadway and drainage crossing. The remaining 3R sections of the roadway will receive full depth reclamation (FDR) or removal of pavement, including all parking areas, followed by a 4-inch pavement overlay.
PRINCIPAL WORK ITEMS:
ANTICIPATED SCHEDULE:
Advertisement – September 2026
Award – November 2026
NTP – December 2026
Contract Completion – December 2028
ESTIMATED COST RANGE:
Total estimated cost between $10,000,000 and $20,000,000
This will be solicited as a full and open competition.
| Sep 8, 2026 | [Presolicitation (Original)] UT NP ARCH 100(2) Bridges on Delicate Arch Road |
| Sep 29, 2026 | [Presolicitation (Updated)] UT NP ARCH 100(2) Bridges on Delicate Arch Road |
| Oct 6, 2026 | [Solicitation (Updated)] UT NP ARCH 100(2) Bridges on Delicate Arch Road |
| Oct 22, 2026 | [Solicitation (Updated)] UT NP ARCH 100(2) Bridges on Delicate Arch Road |

With GovernmentContracts, you can:
...Project: Consultant for JOC Construction Services Ref. #: SB26-12 Department: Division... into a ...
State Government of Utah
Bid Due: 11/19/2026
...Project: Construction: Taylorsville High School Addition Ref. #: DB27-011-RFP Department: SCHOOL... of this ...
State Government of Utah
Bid Due: 11/19/2026
...Project: Construction: New Building at West Kearns Elementary Site Ref. #: JF27-018-IFB Department... ...
State Government of Utah
Bid Due: 12/10/2026
...Haynes Well 8 well house construction project 2027 Advertisement for Bids General Notice ...
Magna Water District
Bid Due: 12/01/2026