| Location: | Federal |
|---|---|
| Posted: | May 18, 2026 |
| Due: | Jun 5, 2026 |
| Agency: | COMMERCE, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | NIST-SSN-26-73WORKCELL |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
Amendment 1: The purpose of this amendment is to address anonymized questions. Please find the questions and answers below. All other terms of the sources sought notice remain unchanged.
Question 1: Should the work cell accommodate multiple robot brands, or does NSIT specifically require Universal Robots?
Answer: Universal Robots are not required; multiple brands would be encouraged but NIST is open to the contractor's assessment of the best model for the application.
Question 2: Will the work cell be installed in Maryland?
Answer: Yes, at NIST's headquarters in Gaithersburg, MD.
Question 3: Is there a preferred quantity and brand of Programmable Logic Controllers (PLCs) for this work cell?
Answer: No, there are no specific requirements for the PLCs.
Question 4:: Would you like the work cell to include Autonomous Mobile Robot (AMR) capabilities?
Answer: NIST had not previously considered AMRs due to the small space available (approx. 12'x17'); it would be of interest if possible, but is not necessary. If included, please specify if extra space would be needed (we have left a perimeter around the workcell for human access).
Question 5:: Would a 360-degree robot safety system with accompanying risk analysis curriculum be beneficial for your needs?
Answer: This would be very interesting for NIST applications, if not cost-prohibitive. It would be useful to have information as an option compared with a lower-cost alternative.
Question 6: Should all robot arms be fixed in position, or would you prefer a system with a 7th axis for extended mobility?
Answer: This is flexible depending on the needs of the designed application. The robots are not required to be fixed, so a 7th axis would be fine to include.
_________________________
Sources Sought Notice
Announcement Type: Sources Sought
Announcement Number: NIST-SSN-26-73WORKCELL
Subject: Design and Integration of a Manufacturing Robotics Workcell
Applicable NAICS: 541330 – Engineering Services
Applicable PSC: R425 – Support – Professional: Engineering/Technical
BACKGROUND
This is a Sources Sought Notice (SSN) requesting industry response to help the Government determine the availability and capability of small business and other than small businesses that are capable of providing any or all of the services required by the U.S. Department of Commerce, National Institute of Standards and Technology (NIST).
This notice is strictly to request information for market research purposes to help NIST determine the appropriate acquisition strategy for a potential requirement. This notice shall not be construed as a solicitation, an obligation, or commitment by the NIST.
OVERVIEW
NIST is conducting market research to identify potential sources that can perform design and integration of a manufacturing robotics workcell.
The NIST Engineering Laboratory (EL) Measurement Science for Robotics and Autonomous Systems (MSRAS) Program requires a professionally designed and fully integrated manufacturing testbed capable of performing an industrial task repeatedly and continuously over extended periods (hours to days), similar to the uptime of a real manufacturing cell. The workcell design shall represent a realistic manufacturing environment, integrating common industrial automation tools like robot arms, conveyor belt, fixtures, etc., as well as human safety components.
The specific task requirements are minimal, so the Contractor may propose a task (or simulated task) of their choice, that represents a frequently implemented integration service.
ANTICIPATED POTENTIAL REQUIREMENTS
Task 1 – DESIGN OF A MANUFACTURING WORKCELL
The Contractor shall:
The Contractor shall:
The Contractor shall:
The contractor shall:
ANTICIPATED PERIOD OF PERFORMANCE
NIST anticipates that it will require services similar to those in the draft SOW for a one-year period of performance beginning in late calendar year 2026 or early calendar year 2027.
HOW TO RESPOND TO THIS NOTICE
Please include only the information identified in this section, readable in either Microsoft Word, Microsoft Excel, or Adobe .pdf format. Submit the response by email to the Primary Point of Contact and, if specified, to the Secondary Point of Contact listed in this notice as soon as possible, and preferably before the closing date and time of this notice. Please note that to be considered for award under any official solicitation, the entity must be registered and “active” in SAM at the time of solicitation response.
Submission Instructions
All information considered pertinent to the covered requirement shall be sent electronically to Ms. Lauren Roller at lauren.roller@nist.gov. Information submitted shall be specific and address the aforementioned requirement.
Submissions must be received not later than 11:00 pm Eastern Time (ET) on June 5, 2025. Only e-mail submissions are acceptable.
The response shall not exceed 6 pages including all attachments, charts, etc.
IMPORTANT NOTES
Do not include proprietary, classified, confidential, or sensitive information in response to this notice. The Government reserves the right to use any non-proprietary information as it deems appropriate in establishing requirements for its upcoming acquisition.
This notice is for market research purposes and should not be construed as a commitment by NIST to issue a solicitation or ultimately award a contract. There is no solicitation available at this time.
This notice does not obligate the Government to award a contract or otherwise pay for the information provided in response.
NIST reserves the right to use information provided by respondents for any purpose deemed necessary and legally appropriate.
Any organization responding to this notice should ensure that its response is complete and sufficiently detailed to allow the Government to determine the organization’s capability.
Respondents are advised that the Government is under no obligation to acknowledge receipt of the information received or provide feedback to respondents with respect to any information submitted.
After a review of the responses received, a synopsis and solicitation may be published on GSA’s eBuy or SAM.gov. However, responses to this notice will not be considered an adequate response to any such solicitation(s).
After the results of this market research are obtained and analyzed, NIST may conduct a competitive procurement and subsequently award a contract. If at least two acceptable small businesses are identified during this market research, then the resulting competitive procurement may be conducted as a small business set-aside.
| May 15, 2026 | [Sources Sought (Original)] Design and Integration of a Manufacturing Robotics Workcell |

With GovernmentContracts, you can:
...Follow CONTROLLER Active Contract Opportunity Notice ID SPRMM126QKE24 Related Notice Department...
DEPT OF DEFENSE
Bid Due: 6/12/2026
...Follow CONTROLLER Active Contract Opportunity Notice ID SPRMM126QKE24 Related Notice Department...
DEPT OF DEFENSE
Bid Due: 6/12/2026
...Follow 25--CONTROLLER Active Contract Opportunity Notice ID SPE7L326U0537 Related Notice... Place of Performance: ...
DEPT OF DEFENSE
Bid Due: 6/09/2026
...Follow 61--CONTROLLER,MOTOR Active Contract Opportunity Notice ID SPE7M126T127J Related Notice... 6110015294230 CONTROLLER,MOTOR: Line ...
DEPT OF DEFENSE
Bid Due: 6/15/2026