| Location: | South Carolina |
|---|---|
| Posted: | Jul 30, 2026 |
| Due: | Sep 1, 2026 |
| Agency: | City of Lancaster |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
| Bid Title: |
West Meeting Street Water Line Replacement
|
| Category: | Construction / Repairs |
| Status: | Open |
|
Construction of approximately 7,720 linear feet (LF) of 12-inch water line, 918-LF of 8-inch water
line, 393-LF of 6-inch water line, 70-LF of 3-inch water line, and 450-LF of horizontal directional
drilled 14-inch water line; connections to existing water lines; installation of new service lines to

With GovernmentContracts, you can:
...22, 2026 - 2:00pm Project Location: Sumter, SC Project Delivery Method: Other Construction ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 9/22/2026
...generally of demolition of existing boat-ramp and dock facilities; construction of four new ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 10/05/2026
...Delivery Method: Design-Bid-Build Construction Cost Range: $950,000 to $990,000 Prime Contractor License..., concrete ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 10/13/2026
...Project Name: Bus Shelter and Concrete Installation Agency/Owner: Pee Dee Regional Transportation... Authority ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 9/25/2026