SI/ SR MEP & Faade

Location: Ohio
Posted: Jul 31, 2026
Due: Aug 10, 2026
Agency: Ohio Facility Construction Commission
Type of Government: State & Local
Category:
  • N - Installation of Equipment
Solicitation No: CLS-27MEP
Publication URL: To access bid details, please log in.
Publish Date Due Date Number Owner Contractring Authority Project Name Primary Service Estimated Project Cost Q&A Short List Notes
2026/07/21 2026/08/10 CLS-27MEP Cleveland State University Local Higher Education SI/ SR MEP & Faade A/E $6,000,000 N/A TBD

Attachment Preview

Request for Qualifications (Registered Design Professional*)
State of Ohio Standard Forms and Documents
Administration of Project: Local Higher Education
Project Name SI/ SR MEP & Facade Response Deadline August 10, 2026 2:00 PM local time
Project Location 2399 Euclid Ave. & 2351 Euclid Ave. Project Number CLS-27MEP
City / County Cleveland / Cuyahoga Project Manager Maeve Murphy
Owner Cleveland State University Contracting Authority Local Higher Education
Delivery Method CM at Risk Prevailing Wages State
Publish Date 7/21/2026
No. of paper copies requested (stapled, not bound) 0 No. of electronic copies requested (PDF) 1
* "Registered Design Professional includes any architect holding a certificate issued under section 4703.10 of the Revised
Code, any landscape architect holding a certificate issued under section 4703.36 of the Revised Code, or any engineer
holding a certificate issued under section 4733.14 of the Revised Code." (Ohio Building Code section 4101:1-2-01 Definitions)
Submit the requested number of Statements of Qualifications (Form F110-330) directly to Maeve Murphy at
m.c.murphy58@csuohio.edu. See Section J of this RFQ for additional submittal instructions.
Submit all questions regarding this RFQ in writing to Maeve Murphy at m.c.murphy58@csuohio.edu with the project number
included in the subject line (no phone calls please). Questions will be answered and posted to the Opportunities page on the
OFCC website at http://ofcc.ohio.gov on a regular basis until one week before the response deadline. The name of the party
submitting a question will not be included on the Q&A document.
Project Overview
A. Project Description
Cleveland State University (CSU) is seeking engineering services to address improvements to the Science Building (SI) &
Science Research Building (SR) MEP systems and facades. These buildings have a range of occupancy usages between
each of their four (4) occupied floors including research labs, teaching labs, lecture halls, and faculty offices.
This project will be the initial phase of a likely 7 phase MEP replacement strategy to upgrade the buildings system by
system and floor-by-floor where possible, in order to maintain building operation during the renovations. The list below
summarizes the MEP replacement strategies for systematically bringing all of the SI & SR building systems up to date.
Research labs are a high priority, though the phases noted below could be strategically rearranged to meet needs. The
initial phase of this project will also involve repairs and improvements to the building facade.
The phasing strategy defined below introduces an upgraded central heating water generation and distribution system to
provide heating hot water to "new" single duct VAV terminal units with reheat coils in lieu of the current dual duct boxes.
This system is more energy efficient and avoids simultaneous heating and cooling of the primary airflow. Similarly,
existing single duct VAV boxes will look at having reheat coils installed for better temperature control. This analysis will
also account for the refurbishment of the hot-deck and cold-deck AHU's as two (2) independent systems. This will allow
their services to be split apart for increased building flexibility.
Phase 0: Central Reheat System & Facade Repairs
* Install new central hydronic reheat system, including steam-to-hot-water heat exchanger, pumps, distribution
piping, controls, and associated equipment to support future HVAC upgrades.
* Building facade repairs and improvements.
Phase 1: SI First & Second Floor Upgrades / SR Upper & Lower Plaza Lab Upgrades
* Replace selected air handling units, VAV terminal units, exhaust systems, unit heaters, fin tube radiator control
valves, and building automation controls.
Phase 2: SI Third & Fourth Floor Upgrades / SR Upper & Lower Plaza Offices, Lecture Halls, and Corridor
Upgrades
* Replace air handling units, VAV terminal units, exhaust systems, fin tube radiator control valves, and DDC
controls.
Phase 3: SI Chilled Water System Upgrades / SR Second & Third Floor Lab Upgrades
F110-02-2026-JAN Publish Date: 7/21/2026 Page 1 of 5

Request for Qualifications (Registered Design Professional) continued
* Replace SI chilled water plant equipment.
* Renovate SR second and third floor laboratory HVAC systems, including air handling units, VAV boxes, exhaust
systems, and controls.
Phase 4: SI Tower Water System Upgrades / SR Second & Third Floor Office Upgrades
* Replace SI cooling tower and condenser water systems.
* Renovate SR second and third floor office HVAC systems, including air handling units, VAV boxes, radiator
controls, and controls.
Phase 5: SI Exhaust Fan Upgrades / SR Misc. AHUs / Penthouse Boiler Upgrades
* Upgrade SI laboratory and building exhaust systems.
* Replace SR penthouse air handling units, boiler plant equipment, and associated mechanical systems.
Phase 6: SI Misc. Equipment Upgrades / SR Exhaust Fan Upgrades
* Replace SI miscellaneous HVAC equipment, domestic hot water, and compressed air systems.
* Upgrade SR laboratory exhaust systems and heat recovery equipment.
Phase 7: SR Misc. Equipment/ Systems Upgrades
* Replace SR chilled water plant, domestic hot water system, compressed air systems, and remaining associated
controls and piping modifications.
B. Scope of Services
The selected firm shall provide complete professional engineering services for the evaluation, estimating, design, and
construction administration associated with the Phase 0 improvements to the Science Building (SI) and Science Research
Building (SR). The selected firm shall also validate and refine CSU's long-term implementation strategy to ensure the
Phase 0 work supports the planned future renovations while maintaining building operations.
Responsibilities of the selected firm include, but are not limited to, the following:
1. Existing Conditions Survey & Phasing Validation
2. Cost Estimating
3. Design & Engineering
4. Construction Administration Services
5. Project Reporting & Communication
For projects advertised with an appropriately developed Program of Requirements ("POR"), upon award of the
Agreement, commence with Design. For projects without such a POR, upon award of the Agreement, commence by
developing the Program of Requirements.
The selected A/E, as a portion of its required Scope of Services and prior to submitting its proposals, will discuss and
clarify with the Owner and/or the Contracting Authority, the cost breakdown of the A/E Agreement detailed cost
components to address the Owner's project requirements. Participate in the Encouraging Diversity, Growth & Equity
(EDGE) Program as required by statute and the Agreement.
As required by the Agreement, and as properly authorized, provide the following categories of services: Program
Verification, Schematic Design, Design Development, Construction Document Preparation, Bid and Award Support,
Conformed Documents, Construction Administration, Post-Construction, and Additional Services of all types.
Refer to the Ohio Facilities Construction Manual for additional information about the type and extent of services required
for each. A copy of the standard Agreement can be obtained at the OFCC website at https://ofcc.ohio.gov.
During the construction period, provide not less than 8 hours (excluding travel time) on-site construction administration
services each week, including (1) attendance at progress meetings, (2) a written field report of each site visit, (3) on-site
representation comprised of the A/E and its consultant staff involved in the primary design of the project, all having
relevant and appropriate types of construction administration experience.
Please list all major scope services needed to complete the selection process for successful project delivery. The specific
scope of services must state particular building types, functional design or specialized professional services required to
evaluate the level of experience of each applicant firm (e.g. parking garage, kitchen design, correctional facility, medical
facility). The scope of services should also define the types of basic and additional professional design and administration
services necessary for the project (e.g. LEED credentials and experience, previous experience with local jurisdiction or
similar sites, previous experience working with the State of Ohio, Building Information Modeling ("BIM") experience and
training, specific BIM and Owner-defined requirements, level of development to be achieved within BIM models, BIM
F110-02-2026-JAN Publish Date: 7/21/2026 Page 2 of 5

Request for Qualifications (Registered Design Professional) continued
deliverables, and Owner's intended use of BIM models after construction). This information will be used by each applicant
to populate the Relevant Project Experience Matrix in Section F of Form F110-330.
For purposes of completing the Relevant Project Experience Matrix in Section F of the Statement of Qualifications (Form
F110-330), below is a list of relevant scope of work requirements for this RFQ:
1. Previous experience with the OFCC and/or State of Ohio projects.
2. Proven experience managing phased MEP projects in occupied buildings.
3. Proven experience designing within existing structures, including infrastructure modifications, facade
improvements, and MEP upgrades.
4. Previous experience upgrading and modernizing building systems in aging facilities.
C. Estimated Budget / Funding D. Anticipated Schedule
State Funding: $6,000,000.00 Professional Services Start: 12 / 26
Other Funding: $0 Construction Notice to Proceed: 07 / 27
Construction Cost: $4,566,200.00 Substantial Completion of all Work: 01 / 28
Total Project Cost: $6,000,000.00 Professional Services Completed: 02 / 28
E. Estimated Basic Fee Range (see note below) F. EDGE Participation Goal
7% to 8% Percent of initial Total A/E Fee: 5.0%
NOTE: Basic Services include: (1) Program Verification, (2) Schematic Design, (3) Design Development, (4) Construction Documents,
(5) Bidding and Award OR GMP Proposal and Amendment (as applicable), (6) Construction Administration, and (7) Closeout services. The
Basic Fee includes all registered design professional services and consultant services necessary for proper completion of the Basic Services,
including validation of existing conditions (but not subsurface or hidden conditions) and preparation of cost estimates and design schedules for
the project. The Estimated Basic Fee Range is calculated as a percentage of the Estimated Budget for Construction Cost above,
including the Owner's contingency. The Basic Fee excludes any Additional Services required for the project.
G. Basic Service Providers Required (see note below) H. Additional Service Providers Required
Lead A/E Discipline: Architecture or Engineering Additional Service Discipline
Secondary Engineering Additional Service Discipline
Disciplines: Mechanical-Electrical-Plumbing Eng. Additional Service Discipline
Structural Engineering Additional Service Discipline
Additional Service Discipline
Additional Service Discipline
Additional Service Discipline
Additional Service Discipline
Additional Service Discipline
Enter Secondary Discipline Additional Service Discipline
Enter Secondary Discipline Additional Service Discipline
NOTE: The lead A/E shall be (1) any architect holding a certificate issued under section 4703.10 of the Revised Code, (2) any landscape
architect holding a certificate issued under section 4703.36 of the Revised Code, or (3) any engineer holding a certificate issued under section
4733.14 of the Revised Code.
I. Evaluation Criteria for Selection
* Demonstrated ability to meet Owner's programmed project vision, scope, budget, and schedule on previous
projects.
* Previous experience compatible with the proposed project (e.g., type, size).
* Relevant past work of prospective firm's proposed consultants.
* Past performance of prospective firm and its proposed consultants.
* Qualifications and experience of individuals directly involved with the project.
* Proposer's previous experience (numbers of projects, sizes of projects) when working with its proposed
consultants.
* Specification writing credentials and experience.
* Experience and capabilities of creating or using Critical Path Method (CPM) schedules and of using CPM
schedules as a project management resource.
F110-02-2026-JAN Publish Date: 7/21/2026 Page 3 of 5

Request for Qualifications (Registered Design Professional) continued
* Approach to and success of using partnering and Alternative Dispute Resolution.
* Proximity of prospective firms to the project site.
* Proposer's apparent resources and capacity to meet the needs of this project.
* The selected A/E and all its consultants must have the capability to use the Internet within their normal business
location(s) during normal business hours.
Interested A/E firms are required to address how they will implement Building Information Modeling ("BIM") on the project,
experience and level of training of staff related to BIM, incorporation of team partners that have previous BIM experience,
and an understanding of collaborative BIM processes, including but not limited to the State of Ohio BIM Protocol available
at the OFCC website at https://ofcc.ohio.gov.
Interested A/E firms are required to submit the Commitment to Participate in the EDGE Business Assistance Program
form in its Statement of Qualifications (Form F110-330) submitted in response to the RFQ, to indicate its intent to contract
with and use EDGE-certified Business(es), as a part of the A/E's team. The Intent to Contract and to Perform and / or
waiver request letter and Demonstration of Good Faith Effort form(s) with complete documentation must be attached to
the A/E's Technical Proposal. Both forms can be accessed via the OFCC website at https://ofcc.ohio.gov. The Intent to
Contract and to Perform form is again required at the Fee Proposal stage.
If the A/E firm intends to receive points for exceeding the EDGE Participation Goal, it must provide BOTH a
completed Commitment to Participate form AND a completed Statement of Intent to Contract and to Perform form
signed by both parties with its Statement of Qualifications.
For all Statements of Qualifications, please identify the EDGE-certified Business(es), by name, which will participate in the
delivery of the proposed professional services solicited in the RFQ.
Interested A/E firms must indicate on their Statement of Qualifications, the locations where their services will be
performed in the spaces provided or by attachment in accordance with the requirements of Executive Order 2019-12D
related to providing services only within the United States and the requirements of Executive Order 2022-02D prohibiting
purchases from or investment in any Russian institution or company. Failure to do so may cause their Statement of
Qualifications to be rejected.
J. Submittal Instructions
Firms are required to submit the current version of Statement of Qualifications (Form F110-330) available via the OFCC
website at https://ofcc.ohio.gov.
Electronic submittals, if requested, should be combined into one PDF file named with the project number listed on the
RFQ and your firm's name, followed by "SOQ". Use the "print" feature of Adobe Acrobat or similar software for creating a
PDF rather than using a scanner. If possible, please reduce the file size of the PDF. In Acrobat, go to Advanced, then
PDF Optimizer. Electronic submittals are limited to a maximum file size of 25 MB.
Paper copies of the Statement of Qualifications, if requested, should be stapled only. Do not use special bindings or
coverings of any type. Cover letters and transmittals are not necessary.
CD/DVD copies of the Statement of Qualifications, if requested, should have the sleeve labeled with the project number
and firm name, followed by "SOQ".
Facsimile copies of the Statement of Qualifications will not be accepted.
Firms are requested to identify professional registrations, memberships and credentials including: LEED GA, LEED AP,
LEED AP+, CCCA, CCM, CCS, CDT, CPE, DBIA, and any other appropriate design and construction industry credentials.
Identify that information on the resume page for individual in Block 22, Section E of the F110-330 form.
F110-02-2026-JAN Publish Date: 7/21/2026 Page 4 of 5

Selection Criteria Value Score
1. Primary Firm Location, Workload and Size (Maximum 10 points)
a. Proximity of firm to project site Less than 25 miles 5
25 miles to 50 miles 2
More than 50 miles 0
b. Amount of fees awarded by Contracting Authority in previous 24 months Less than $1,000,000 2
$1,000,000 to $2,000,000 1
More than $2,000,000 0
c. Number of licensed professionals Less than 3 professionals 1 Max = 3
3 to 6 professionals 2
More than 6 professionals 3
2. Primary Firm Qualifications (Maximum 30 points)
a. Project management lead Experience / ability of project manager to manage scope / budget / schedule / quality 0 - 10
b. Project design lead Experience / creativity of project designer to achieve owner's vision and requirements 0 - 5 Max = 20
c. Technical staff Experience / ability of technical staff to create fully coordinated construction documents 0 - 10
d. Construction administration staff Experience / ability of field representative to identify and solve issues during construction 0 - 5
3. Key Consultant Qualifications (Maximum 20 points)
a. Key discipline leads Experience / ability of key consultants to perform effectively and collaboratively 0 - 15
b. Proposed EDGE-certified Consultant participation* One point for every 2 percent increase in 0 - 5
professional services over the EDGE
participation goal
4. Overall Team Qualifications (Maximum 10 points)
a. Previous team collaboration Less than 2 sample projects 1 Max = 3
2 to 4 sample projects 2
More than 4 sample projects 3
b. LEED** Registered / Certified project experience Registered LEED v4.0 or v4.1 projects 0 Max = 0 0
Certified LEED v4.0 or v4.1 projects 0
c. BIM project experience Training and knowledge 1 Max = 3
Direct project experience 3
d. Team organization Clarity of responsibility / communication demonstrated by table of organization 0 - 2
5. Overall Team Experience (Maximum 30 points)
a. Previous team performance Past performance as indicated by evaluations and letters of reference 0 - 10
b. Experience with similar projects / delivery methods Less than 2 projects 0 - 3
2 to 4 projects 4 - 6
More than 4 projects 7 - 10
c. Budget and schedule management Performance in completing projects within original construction budget and schedule 0 - 5
d. Knowledge of Ohio Capital Improvements process Less than 2 projects 0 - 1
2 to 4 projects 2 - 3
More than 4 projects 4 - 5
Subtotal

Registered Design Professional Selection Rating Form
State of Ohio Standard Forms and Documents
Project Name SI/ SR MEP & Facade Proposer Firm
Project Number CLS-27MEP City, State, Zip
Selection Criteria Value Score
1. Primary Firm Location, Workload and Size (Maximum 10 points)
Less than 25 miles 5
a. Proximity of firm to project site 25 miles to 50 miles 2
More than 50 miles 0
Less than $1,000,000 2
b. Amount of fees awarded by Contracting Authority in
$1,000,000 to $2,000,000 1
previous 24 months
More than $2,000,000 0
Less than 3 professionals 1
Max
c. Number of licensed professionals 3 to 6 professionals 2
= 3
More than 6 professionals 3
2. Primary Firm Qualifications (Maximum 30 points)
Experience / ability of project manager to
a. Project management lead 0 - 10
manage scope / budget / schedule / quality
Experience / creativity of project designer to
b. Project design lead 0 - 5
achieve owner's vision and requirements
Experience / ability of technical staff to create Max
c. Technical staff 0 - 10
fully coordinated construction documents = 20
Experience / ability of field representative to
d. Construction administration staff 0 - 5
identify and solve issues during construction
3. Key Consultant Qualifications (Maximum 20 points)
Experience / ability of key consultants to
a. Key discipline leads 0 - 15
perform effectively and collaboratively
One point for every 2 percent increase in
b. Proposed EDGE-certified Consultant participation* professional services over the EDGE 0 - 5
participation goal
4. Overall Team Qualifications (Maximum 10 points)
Less than 2 sample projects 1
Max
a. Previous team collaboration 2 to 4 sample projects 2
= 3
More than 4 sample projects 3
b. LEED** Registered / Certified project experience
Registered LEED v4.0 or v4.1 projects 0 Max
0
Certified LEED v4.0 or v4.1 projects 0 = 0
Training and knowledge 1 Max
c. BIM project experience
Direct project experience 3 = 3
Clarity of responsibility / communication
d. Team organization 0 - 2
demonstrated by table of organization
5. Overall Team Experience (Maximum 30 points)
Past performance as indicated by
a. Previous team performance 0 - 10
evaluations and letters of reference
Less than 2 projects 0 - 3
b. Experience with similar projects / delivery methods 2 to 4 projects 4 - 6
More than 4 projects 7 - 10
Performance in completing projects within
c. Budget and schedule management 0 - 5
original construction budget and schedule
Less than 2 projects 0 - 1
d. Knowledge of Ohio Capital Improvements process 2 to 4 projects 2 - 3
More than 4 projects 4 - 5
* Must be comprised of registered professional design consulting firms and NOT the lead firm - For more
information on scoring this and other criteria refer to Document F199-01 - PS Selection Rating Rubric. Subtotal
** Leadership in Energy & Environmental Design administered by Green Business Certification Inc.(TM)
Notes: Evaluator:
Name
Signature Date
F110-02-2026-JAN Publish Date: 7/21/2026 Page 5 of 5

This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Follow OHARNG Tactical Vehicle Maneuver Lane Improvement at Camp James A. Garfield Joint

DEPT OF DEFENSE

Bid Due: 8/13/2026

Follow Altitude Chambers Contractor Logistics Support for 12 Chambers Active Contract Opportunity Notice

DEPT OF DEFENSE

Bid Due: 8/12/2026

Follow Altitude Chambers Contractor Logistics Support for 12 Chambers Active Contract Opportunity Notice

DEPT OF DEFENSE

Bid Due: 8/12/2026

Follow Novel Thermal and Power/Energy Management Architectures for Hypersonic Applications Active Contract Opportunity

DEPT OF DEFENSE

Bid Due: 8/15/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.